Fig. 1. Configuration of the offshore wind farm.
Fig. 2. Case 1 of the offshore wind farm.
Fig. 3. Case 2 of the offshore wind farm.
Fig. 4. Case 3 of the offshore wind farm.
Fig. 5. Calculation results of the three cases.
TABLE I 22.9 KV HTS POWER CABLE OF LS CABLE & SYSTEM.
TABLE II THE HTS POWER CABLE INSTALLATION COST.
TABLE III 22.9 KV AC POWER CABLE COST.
TABLE IV 70 KV AC POWER CABLE COST.
TABLE V PARAMETERS OF THE OFFSHORE WIND FARM.
TABLE VI CALCULATION RESULTS OF THE CASE 1.
TABLE VII CALCULATION RESULTS OF THE CASE 2.
TABLE VIII CALCULATION RESULTS OF THE CASE 3.
References
- Paola Bresesti, Wil L. Kling, Ralph L. Hendriks, Riccardo Vailati, "HVDC Connection of Offshore Wind Farms to the Transmission System," IEEE Transactions on Energy Conversion, vol. 22, Issue. 1, Mar. 2007.
- S.H.Sohn "The Results of Installation and Preliminary Test of 22.9 kV, 50 MVA, 100 m Class HTS Power Cable System at KEPCO," IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, vol. 17, No. 2, Jun. 2007.
- J. F. Maguire, " Progress and Status of a 2G HTS Power Cable to Be Installed in the Long Island Power Authority (LIPA) Grid," IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, vol. 21, No. 3, Jun. 2011.
- Jong-Nam Won, "A Study on Siting on HVAC Offshore Substation for Wind Power Plant using Submarine Cable Cost Model," KIEE, vol. 62, No. 4, pp. 451-456, 2013.
- D. Hur, "Economic Considerations Underlying the Adoption of HVDC and HVAC for the Connection of an Offshore Wind Farm in Korea," JEET, Vol. 7, No. 2, pp. 1537-1543, Dec. 1999.
- Jian Zhang, "Economic comparison of VSC-HVDC and HVAC Systems for Connections of Offshore Wind Farms," Mechanics and Materials, Vol. 672-674, pp. 325-330, 2014. https://doi.org/10.4028/www.scientific.net/AMM.672-674.325