• 제목/요약/키워드: Weighted scheduling

Search Result 135, Processing Time 0.031 seconds

Wireless Packet Scheduling Algorithm for OFDMA System Based on Time-Utility and Channel State

  • Ryu, Seung-Wan;Ryu, Byung-Han;Seo, Hyun-Hwa;Shin, Mu-Yong;Park, Sei-Kwon
    • ETRI Journal
    • /
    • v.27 no.6
    • /
    • pp.777-787
    • /
    • 2005
  • In this paper, we propose an urgency- and efficiency-based wireless packet scheduling (UEPS) algorithm that is able to schedule real-time (RT) and non-real-time (NRT) traffics at the same time while supporting multiple users simultaneously at any given scheduling time instant. The UEPS algorithm is designed to support wireless downlink packet scheduling in an orthogonal frequency division multiple access (OFDMA) system, which is a strong candidate as a wireless access method for the next generation of wireless communications. The UEPS algorithm uses the time-utility function as a scheduling urgency factor and the relative status of the current channel to the average channel status as an efficiency indicator of radio resource usage. The design goal of the UEPS algorithm is to maximize throughput of NRT traffics while satisfying quality-of-service (QoS) requirements of RT traffics. The simulation study shows that the UEPS algorithm is able to give better throughput performance than existing wireless packet scheduling algorithms such as proportional fair (PF) and modified-largest weighted delay first (M-LWDF), while satisfying the QoS requirements of RT traffics such as average delay and packet loss rate under various traffic loads.

  • PDF

A Parallel Processors Scheduling Problems with a Common Due Date (공통납기를 고려한 병렬기계 일정계획)

  • Lee, Jeong-Hwan;No, In-Gyu
    • Journal of Korean Society for Quality Management
    • /
    • v.18 no.2
    • /
    • pp.81-92
    • /
    • 1990
  • This paper considers a scheduling of a set of jobs on single and multiple processors, when all jobs have a common due date and earliness and lateness are penalized at different cost rates. The objective is to determine the optimal value of a common due date and an optimal scheduling to minimize a total penalty function. It is also shown that a schedule having minimum weighted completion time variances must be V-shaped. For identical processors, a polynomial scheduling algorithm with the secondary objectives of minimizing makespan and machine occupancy is developed and a numerical example is presented.

  • PDF

Multiobjective Vehicle Scheduling Problem with Time and Area-Dependent Travel Speeds: Scheduling Algorithm and Expert System (시간대 및 구역의존 차량이동속도를 고려하는 다목적차량일정문제: 일정계획해법과 전문가시스템)

  • Park, Yang-Byung
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.23 no.4
    • /
    • pp.621-633
    • /
    • 1997
  • This paper is concerned with the multiobjective vehicle scheduling problem with time and area-dependent travel speeds(MVSPTD), in which two conflicting objectives are explicitly treated and the travel speed between two locations depends on the passing area and time of day. The two objectives are the minimization of total vehicle travel time and the minimization of total weighted tardiness. First, I construct a mixed integer linear programming formulation of the MVSPTD, and present o heuristic algorithm that builds the vehicle schedules based on the savings computed. The results of computational experiments showed that the heuristic performs very well. Finally, I propose an expert system for vehicle scheduling in the MVSPTD. Its whole process is executed under VP-Expert expert system environment.

  • PDF

Quasi Assignment Algorithms in Job Shops

  • Byeon Eui-Seok;Lee Jang-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2002.05a
    • /
    • pp.704-708
    • /
    • 2002
  • Production scheduling has been one of the most critical issues in a manufacturing environment Job-shop scheduling problems(JSP) are well know from the standpoint of production planning and operations control in this research scheduling against due date is a measure of performance and the objective is minimizing total weighted tardiness This paper presents an idea of decomposition of the problem and shows robustmess of the schedule under various disturbances along with exact and approximation methods. The proposed method can indeed handle shop disturbances more effectively when compared with traditional and dynamic scheduling methods.

  • PDF

Prioritized Dynamic Rate Scheduling for Interactive GEO Satellite Networks (대화형 GEO 위성 네트워크를 위한 우선권기반 동적 데이터 전송률 스케줄링 체계)

  • Chang, Kun-Nyeong
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.3
    • /
    • pp.1-15
    • /
    • 2007
  • In this paper, the return link of interactive GEO satellite network providing multimedia services is considered. First, we classify data by delay characteristics, and analyze the numbers of expected lost packets and expected delay packets for each data class of each terminal. Next we mathematically formulate optimal rate scheduling model to minimize the weighted sum of the numbers of expected lost packets and expected delay packets considering priority of each data class. We also suggest a dynamic rate scheduling scheme based on Lagrangean relaxation technique and subgradient technique to solve the proposed model in a fast time. Extensive experiments show that the proposed scheme provides encouraging results.

An Improved Ant Colony System for Parallel-Machine Scheduling Problem with Job Release Times and Sequence-Dependent Setup Times (작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템)

  • Joo, Cheol-Min
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.218-225
    • /
    • 2009
  • This paper considers a parallel-machine scheduling problem with job release times and sequence-dependent setup times. The objective of this problem is to determine the allocation policy of jobs and the scheduling policy of machines so as to minimize the weighted sum of setup times, delay times, and tardy times. A mathematical model for optimal solution is derived and a meta heuristic algorithm based on the improved ant colony system is proposed in this paper. The performance of the meta heuristic algorithm is evaluated through compare with optimal solutions using randomly generated several examples.

An Algorithm for Resource-Unconstrained Earliness-Tardiness Problem with Partial Precedences (자원 제약이 없는 환경에서 부분 우선순위를 고려한 Earliness-Tardiness 최적 일정계획 알고리즘)

  • Ha, Byung-Hyun
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.38 no.2
    • /
    • pp.141-157
    • /
    • 2013
  • In this paper, we consider the minimization of the total weighted earliness-tardiness penalty of jobs, regarding the partial precedences between jobs. We present an optimal scheduling algorithm in O(n(n+m log m)) where n is the number of jobs and m is the number of partial precedences. In the algorithm, the optimal schedule is constructed iteratively by considering each group of contiguous jobs as a block that is represented by a tree.

Flow-shop Scheduling Problem with Weighted Work-In-Process

  • Yang, Jae-Hwan
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2005.05a
    • /
    • pp.193-206
    • /
    • 2005
  • This paper considers a new flow-shop scheduling problem where a different WIP (work-in-process) state has different weight on the duration time. For the two machine case, the recognition version is NP-Complete in the strong sense. Several special cases are solved by different polynomial time algorithms. Finally, we develop a heuristic and provide an upper-bound on relative error which is tight in limit.

  • PDF

A Simple Scheduling Algorithm Supporting Various Traffics in ATM Networks

  • Shim, Jae-Jeong;Pyun, jae-Young;Ko, Sung-Jea
    • Proceedings of the IEEK Conference
    • /
    • 2000.07b
    • /
    • pp.747-749
    • /
    • 2000
  • A new scheduling algorithm called the Adaptive Weighted Round Robin with Delay Tolerance (AWRR/DT) is presented. The proposed scheme can reduce the average delay of non-real-time (NRT) class while maintaining the QoS of real-time (RT) classes. Our scheme can also reflect the traffic fluctuation of networks with a small processing burden.

  • PDF

Common Due-Data Determination and Sequencing on Parallel Processors (병렬 기계에 있어서 공통 납기 결정과 일정 계획)

  • 오명진;이상도
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.23
    • /
    • pp.27-36
    • /
    • 1991
  • This paper considers scheduling a set of n-jobs on m-paraller identical processors in which all jobs have the common due date. The objective of the problem is to minimize the weighted mean absolute deviation of job completion times about such common due dates under the assumption that each job has a different weight. and to determine the optimal value of a common due date. We propose four heuristic solution methods based on several dominance conditions, and its solution procedure is illustrated with numerical examples. The Performance comparison is made among four heuristic scheduling procedures.

  • PDF