• Title/Summary/Keyword: Weak rock

Search Result 207, Processing Time 0.026 seconds

Optimal Measurement System for Weak Rock Slopes in an Open-Pit Mine (노천광 연약 사면에서의 계측시스템 선택을 위한 고찰)

  • SunWoo, Choon;Ryu, Dong-Woo;Jung, Yong-Bok;Park, Do-Hyun
    • The Journal of Engineering Geology
    • /
    • v.22 no.2
    • /
    • pp.157-171
    • /
    • 2012
  • The slope design of an open-pit mine must ensure slope stability and economic feasibility. The overall slope angle of the pit is therefore the main factor of concern because of limited support or reinforcement options available in such a setting. This study examines the optimal measurement system for monitoring the behavior of the slope in an open-pit mine using displacement measurement, data analysis, and numerical simulations for a coal mine at Pasir, Indonesia. The area of slope to be managed is extensive and the maximum displacement, as calculated by numerical analysis, is about 3,000 mm. The displacement data, measured by inclinometer and GPS, were analyzed, and the applicability of SSR (slope stability radar) was reviewed in comparison with other monitoring systems.

An experimental study on early strength of shotcrete (숏크리트의 조기강도에 대한 실험적 연구)

  • Song, Yong-Su;Ryu, Jong-Hyun;Lim, Heui-Dae
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.4
    • /
    • pp.285-294
    • /
    • 2010
  • As there are increasing number of tunneling works these days, shotcrete is used as primary supports in order to secure the stability of tunnels. The quality of shotcrete has a direct influence on tunnels, because it is a primary support which secures the stability of completed tunnels as well as the stability of tunnels under excavation. Especially in case that ordinary shotcrete is used under weak rock conditions or at water gushing sections, more shotcrete is needed and rebound ratio increases. As a result, it is hard to keep economic feasibility. In addition to it, in subway construction, there are cases of separated excavation and it may have a bad influence on construction period or quality. Therefore, in this study, we are going to evaluate the early strength of powder type accelerator.

A Case Study of Site Investigation and Ground Stability Analysis for Diagnosis of Subsidence Occurrence in Limestone Mine (석회석 광산 지역의 지반침하 원인 규명을 위한 현장조사와 지반 안정성 분석 사례)

  • Lee, Seung-Joong;Kim, Byung-Ryeol;Choi, Sung-Oong;Oh, Seok-Hoon
    • Tunnel and Underground Space
    • /
    • v.25 no.4
    • /
    • pp.332-340
    • /
    • 2015
  • Ground subsidence occurring in mine area can cause an enormous damage of loss of lives and properties, and a systematic survey should be conducted a series of field investigation and ground stability analysis in subsidence area. This study describes the results from field investigation and ground stability analysis in a limestone mine located in Cheongwon-gun, Chungcheongbuk-do, Korea. Rock mechanical measurements and electrical resistivity surveys are applied to obtain the characteristics of in-situ rock masses and the distribution patterns of subsurface weak zone, and their results are extrapolated in numerical analysis. From the field investigation and stability analysis, it is concluded that the subsidence occurrence in this limestone mine is caused mainly by subsurface limestone cavities.

Comparison of Hoek-Brown and Mohr-Coulomb failure criterion for deep open coal mine slope stability

  • Aksoy, Cemalettin O.;Uyar, Guzin G.;Ozcelik, Yilmaz
    • Structural Engineering and Mechanics
    • /
    • v.60 no.5
    • /
    • pp.809-828
    • /
    • 2016
  • In deep open pit mines, slope stability is very important. Particularly, increasing the depths increase the risks in mines having weak rock mass. Blasting operations in this type of open pits may have a negative impact on slope stability. Several or combination of methods can be used in order to enable better analysis in this type of deep open-pit mines. Numerical modeling is one of these options. Many complex problems can be integrated into numerical methods at the same time and analysis, solutions can be performed on a single model. Rock failure criterions and rock models are used in numerical modeling. Hoek-Brown and Mohr-Coulomb terms are the two most commonly used rock failure conditions. In this study, mine planning and discontinuity conditions of a lignite mine facing two big landslides previously, has been investigated. Moreover, the presence of some damage before starting the study was identified in surrounding structures. The primary research of this study is on slope study. In slope stability analysis, numerical modeling methods with Hoek-Brown and Mohr-Coulomb failure criterions were used separately. Preparing the input data to the numerical model, the outcomes of patented-blast vibration minimization method, developed by co-author was used. The analysis showed that, the model prepared by applying Hoek-Brown failure criterion, failed in the stage of 10. However, the model prepared by using Mohr-Coulomb failure criterion did not fail even in the stage 17. Examining the full research field, there has been ongoing production in this mine without any failure and damage to surface structures.

Relations between Initial Displacement Rate and Final Displacement of Arch Settlement and Convergence of a Shallow Tunnel (저심도 터널의 천단침하 및 내공변위의 초기변위속도와 최종변위의 관계)

  • Kim, Cheehwan
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.110-119
    • /
    • 2013
  • It is generalized to measure the arch settlement and convergence during tunnel construction for monitoring its mechanical stability. The initial convergence rate a day is defined from the first convergence measurement and the final convergence defined as the convergence measured lastly. The initial and the final tunnel arch settlement are defined like the preceding convergence. In the study, the relations between the initial and final displacements of a shallow tunnel are analyzed. The measurements were performed in the tunnel of subway 906 construction site in Seoul. The overburden is 10-20 m and the tunnel goes through weathered soil/rock. The width and height of the tunnel are about 11.5 m, 10m, respectively. So this is a shallow tunnel in weak rock. The length of tunnel is about 1,820 m and the tunnel was constructed in 2 stages, dividing upper and lower half. The numbers of measurement locations of arch settlement and convergence are 184 and 258, respectively. As a result, the initial displacement rate and the final displacement are comparatively larger in the section of weathered soil.

Non-deformable support system application at tunnel-34 of Ankara-Istanbul high speed railway project

  • Aksoy, C.O.;Uyar, G.G.;Posluk, E.;Ogul, K.;Topal, I.;Kucuk, K.
    • Structural Engineering and Mechanics
    • /
    • v.58 no.5
    • /
    • pp.869-886
    • /
    • 2016
  • Non-Deformable Support System (NDSS) is one of the support system analysis methods. It is likely seen as numerical analysis. Obviously, numerical modeling is the key tool for this system but not unique. Although the name of the system makes you feel that there is no deformation on the support system, it is not true. The system contains some deformation but in certain tolerance determined by the numerical analyses. The important question is what is the deformation tolerance? Zero deformation in the excavation environment is not the case, actually. However, deformation occurred after supporting is important. This deformation amount will determine the performance of the applied support. NDSS is a stronghold analysis method applied in full to make this work. While doing this, NDSS uses the properties of rock mass and material, various rock mass failure criteria, various material models, different excavation geometries, like other methods. The thing that differ NDSS method from the others is that NDSS makes analysis using the time dependent deformation properties of rock mass and engineering judgement. During the evaluation process, NDSS gives the permission of questioning the field observations, measurements and timedependent support performance. These transactions are carried out with 3-dimensional numeric modeling analysis. The goal of NDSS is to design a support system which does not allow greater deformation of the support system than that calculated by numerical modeling. In this paper, NDSS applied to the problems of Tunnel 34 of the same Project (excavated with NATM method, has a length of 2218 meters), which is driven in graphite schist, was illustrated. Results of the system analysis and insitu measurements successfully coincide with each other.

Geomorphological Development of Shore Platforms at Dongdo and Seodo in the Southern Coast of Dok-do Island (독도 서도 및 동도 남부 해안의 파식대 지형 발달)

  • Hwang, Sangill;Kwon, Yong-whuy;Yoon, Soon-Ock
    • Journal of The Geomorphological Association of Korea
    • /
    • v.26 no.4
    • /
    • pp.33-45
    • /
    • 2019
  • The shore platforms at Dok-do could be an important and clear indicator showing dimensional reduction of Dok-do. Especially flat type shore platforms are distributed in the southern coast of Dok-do island, composed of weak rocks against erosional resistance like interbedded lapilli tuff and massive tuff breccia. The distribution of shore platform is partially related to the wind direction at Dok-do island. The primary SW- and secondary SE winds are representative among wind directions at Dok-do, maintaining from spring to the autumn. Therefore, wide shore platforms could be developed by waves approaching from SW and SE directions in the southern coast of Dok-do. The sea stacks like Gunham-rock, Neopdeok-rock, Keungaje-rock and Jakeungaje-rock on the western coast are also considered to be formed by wave erosion from the SE direction. The shore platforms in the southern coast of Dok-do island were developed since ca. 7,000 yr. BP, when sea level raised almost to the present level. The average extension speed of shore platform was calculated to 4.0mm/y, because the broadest shore platform with the width ca. 28m was extended for ca. 7,000 years. The width's dimension of shore platform at Dok-do reflects a slow extension rate in the present, although erosional process will be faster with the sea level rise in the future.

A Study of the Japanese Colonial Era Rock-Carved Seated Avalokiteśvara Statue at Ganghwa Bomunsa Temple (일제강점기 강화 보문사 마애관음보살좌상 연구)

  • Lee, Jumin
    • Korean Journal of Heritage: History & Science
    • /
    • v.53 no.3
    • /
    • pp.62-79
    • /
    • 2020
  • The rock-carved seated Avalokiteśvara statue at Ganghwa Bomunsa Temple is a giant rock-carved Buddhist statue that was built in 1928 during the Japanese colonial era. Although it is a year-recorded Buddhist statue that occupies a prominent place in modern Korean Buddhist sculpture history, it has not been the subject of in-depth discussion due to weak research on modern Buddhist sculptures. In this study, to examine the various significant aspects of the rock-carved Seated Avalokiteśvara statue at Bomunsa Temple as a modern Buddhist sculpture, I have managed to determine its construction year, artificers, and patrons by deciphering the inscription around the rock-carved statue; in addition I have researched the effects of the rock shapes and landforms on the formation of the Buddhist statue by comparing and analyzing the points of view of both artificers and worshipers. I have also identified the specific circumstances of the time of construction from interviews with the descendants of artificers. A monk from Geumgangsan Mountain, Lee Hwaeung, took the role of sponsor and chief painter to construct the rock-carved seated Avalokiteśvara statue at Bomunsa temple. In the beginning of its construction in 1928, more than 100 donators jointly sponsored the construction of the statue. Gansong Jeon Hyoungphil sponsored alone at the time of the place of worship's expansion in 1938. Bomunsa Temple has been regarded as one of the top-three sacred places of Avalokiteśvara Bodhisattva together with Naksansa Temple in Yang Yang and Boriam in Nam Hae, due to the construction of the rock-carved statue. It took about three months to construct the statue. Lee Hwaeung drew a rough sketch and then Un Songhag and five masons from Ganghwa Island took part in the carving process. We can observe the line drawing technique around the rock-carved statue because the statue was carved based on the rough sketch of the monk painter. The aspect of Lee Hwaeung as a painter is revealed; therefore, we can identify the clue of painting pattern leading to Seogongchulyou- Hwaunghyoungjin- Ilonghyegag. The rock-carved seated Avalokiteśvara statue at Bomunsa Temple is a typical Avalokiteśvara that wears a jeweled crown and holds Kundica. It makes a strong impression as it has a big square-shaped face and a short neck and is unsophisticated in general. The artificers solved the issue of visual distortion of the rock-carved statue caused by carving on a 10-meter high and 40-degree sloping rock by controlling motion to its maximum, omitting detailed expression by emphasizing symmetry, and adjusting the head-to-body proportion to be almost one-to-one. In this study, especially, I presume the unified form of sacred sculptures and Buddhist altars, without making a Buddhist altar like the rock-carved seated Avalokiteśvara statue at Bomunsa Temple, to be a key characteristic of modern Buddhist sculptures. Furthermore, I make newly clear that the six letters of Sanskrit carved on nimbus, which had been interpreted as a Six-Syllable Mantra, are a combination with Jeongbeopgye and Sabang Mantras. In addition, three iron rings driven on eaves rock were used as a reference point, and after construction they were used as a decoration for the Bodhisattva with hanging wind chimes.

Design and construction of the GK immersed tunnel of Busan-Geoje Fixed Link Project (국내 최장 GK 침매터널의 설계 및 시공)

  • Kim, Yong-Il;Kim, Woong-Ku;Kim, Je-Chun;Lee, Jung-Sang;Kim, Kyoung-O
    • Tunnel and Underground Space
    • /
    • v.19 no.2
    • /
    • pp.71-76
    • /
    • 2009
  • The GK immersed tunnel as a part of Busan-Geoje Fixed Link Project, is the first attempt in Korea. In spite of existing of many difficulties in construction like the absent of construction cases in Korea, the connection work under approximately 50 m below sea level and weak ground condition, etc., now eight caissons were installed successfully on the accurate position and we are going to install upto the twelfth caisson in this year. The purpose of this paper is to introduce design and construction conditions of the GK immersed tunnel to advise the tunnel designers who will handle the similar project.

Mechanism Analysis of Tunnel Collapse in Weak Ground (미고결 지반에서의 터널붕락 메커니즘 분석)

  • Lee, Jae-Ho;Jeong, Yun-Young;Kim, Young-Su;Moon, Hong-Duk
    • Tunnel and Underground Space
    • /
    • v.19 no.4
    • /
    • pp.339-347
    • /
    • 2009
  • Despite the recent improvement in tunnel excavation technique, Tunnel collapse accidents still happen. This paper suggest two typical cases in unconsolidated ground condition. Collapse causes of each case were analyzed by the measurement records and numerical simulation, and then mechanism of tunnel collapse was investigated about each case. From this study, the crucial indicators of tunnel collapse were the variation of shear strain and ground water level, also, tunnel collapse deeply related to how shear deformation around tunnel was developed according to the excavation step.