This study reports the serial use of a 3-D hydrodynamic model, EFDC-Hydro and a dynamic water quality model WASP7.2 that are maintained by USEPA. The 48 km section of the Geum River downstream between Daechung Dam and Gongju was selected as a sample study site. Topographical information was used to accurately represent morphology of the study site and boundary conditions were derived from governmental databases including WAMIS by Ministry of Land and Ocean and WEIS by Ministry of Environment. EFDC-Hydro was successfully calibrated for observed water level and WASP was calibrated using monthly observed water quality data obtained from the above sources. It was found that the current water quality target of BOD for the Geum River-H point could not be met on monthly basis though every other tributary of the area would meet its own water quality target as assigned in Korean TMDL. This study proposed the new target BOD water quality for the Gabcheon and Mihocheon as 4.3 and 3.6 mg/l, respectively so that the Geum River-H point can meet the target. When Sejong City is constructed, it is estimated that effluent discharge limit of BOD must be less than 4.5 mg/l to meet water quality of the point. This study shows that it is possible to carry out more precise modeling considering both water movement and water kinetics by using EFDC and WASP simultaneously.
Journal of the Economic Geographical Society of Korea
/
v.15
no.3
/
pp.358-375
/
2012
Neoliberalizing nature spreads widely across diverse fields and areas. Commodifying water is the most frequent case conflicting with the stance, water as commons. This paper reviews the commodity versus commons debate in other countries leading to the importance of wider perspective considering regional contexts, and then examines the case of Jeju with that regard entirely depending freshwater on underground acquifer. In Jeju, the sale of bottled water by private corporation has been in confrontation with the declaration of water as commons by Jeju government. But, the commodity versus commons conflict over water hinders more important concerns such as the abundant use by tourism related hotels and golf courses, the free largest agricultural use, and the production and sale of bottled water by Jeju government itself. The real focus of concern should be given to the constraints on increasing water rate for tourism businesses, charging fees on agriculture, and the local development imperatives. The dual stance of Jeju government in promoting water as commodity as well as promulgating water as commons seems to be a case adding diversity to the geography of neoliberalizing nature.
Over 96.2% of the agricultural water in Jeju Island is obtained from groundwater and there are quite distinct characteristics of agricultural water demand/supply spatially because of regional and seasonal differences in cropping system and rainfall amount. Land use for cultivating crops is expected to decrease 7.4% (4,215 ha) in 2020 compared to 2010, while market garden including various vegetable crop types having high water demand is increasing over the Island, especially western area having lower rainfall amount compared to southern area. On the other hand, land use for fruit including citrus and mandarin having low water demand is widely distributed over southern and northern part having higher rainfall amount. The agricultural water demand of $1,214{\times}10^3\;m^3/day$ in 2020 is estimated about 1.39 times compared to groundwater supply capacity of $874{\times}10^3\;m^3/day$ in 2010 with 42.4% of eastern, 103.1% of western, 61.9% of southern, and 77.0% of northern region. Moreover, net secured amount of agricultural groundwater would be expected to be much smaller due to regional disparity of water demand/supply, the lack of linkage system between the agricultural water supply facilities, and high percentage of private wells. Therefore, it is necessary to ensure the total net secured amount of agricultural groundwater to overcome the expected regional discrepancy of water demand and supply by establishing policy alternative of regional water supply plan over the Island, including linkage system between wells, water tank enlargement, private wells maintenance and public wells development, and continuous enlargement of rainwater utilization facilities.
Rural water resources systems may be largely constituted by two parts. One is rural water supply systems such as reservoirs, wells, pumping stations. The other is rural water demand systems which include municipal water, irrigation water, industrial water, livestocks water, inland fisheries water and envir¬onmental water in rural areas. planning to develop rural water resources systems is a very hard task because of their complicated factors and the large number of spatial data to investigate and manipulate. A Geographic Information SystemCGIS) will be a powerful and efficient tool to handle the spatial data and to plan the land use. All data can be efficiently maintained and easily updated. This paper refers to the construction of a GIS for planning rural water resources systems applied to Kokseong County, Cheonnam Province, Republic of Korea. The Geographic Informa¬tion was constituted by 4 layers of base map and 11 layers of thematic map.
Journal of the Korean Society of Clothing and Textiles
/
v.21
no.1
/
pp.3-9
/
1997
From the standpoint of end-use and practical performances, attention was focused preparing cotton fabrics which posses good dyeability as well as water repellency. The results are summarized as follows, as far as findings obtained from this study is concerned. The fluoro chemical (FC) water repellent finished cotton fabrics exhibited good dyeing properties and colorfastness to washing. Furthermore, the DMDHEU durable-press and FC water repellent finishes in a single pad bath resulted in excellent durable press performance and good water repellency.
Proceedings of the Korean Society of Agricultural Engineers Conference
/
2003.10a
/
pp.487-490
/
2003
Geumgang 2nd agricultural comprehensive development project is to develope the infrastructure in 43,000ha agricultural area. For this is the very large project, it is necessary to consider the plan of water use comprehensively. Therefore, watershed water balance model for this project has been developed and a variety of analysis has been carried out. And Geumgang Project Water Management System has been developed for the manager of irrigation facilities.
Proceedings of the Korean Society of Marine Engineers Conference
/
2006.06a
/
pp.51-52
/
2006
This study was progressed on the freezing behavior of waste water in relation to freeze concentration method useful to waste water treatment system of small and middle size and which can re-use purified water. The object of this experiment is comparing a pollutant contain of the frozen layer and of an aqueous solution by cooling wall temperature, a flow field effect and a initial thickness of frozen layer.
Proceedings of the Korea Water Resources Association Conference
/
1982.07a
/
pp.3-24
/
1982
The relations between tidal fluctuation and freshwater discharge are stuied dy use of observed data in the estuarine region of the Nagdong Rivre. Damping modulus which represents the resistance to propagation of tidal wave is estimated, and it is verified that when the fresh water discharge is lower than 300 m/sec., the elevation of mean-water-level at Gupo is the same as mean sea-water-level.
Hot spring water is petrifaction water and mixed with animals and plants disintegrated water in the underground. The ingredient are complicated and abundant. The contained element is used to facilitate the function of human body. activate the human structure movement. discharge waste material due to increase circulation and metabolism, also it can remain the homeostasis. We can not find research for spa therapy in our country. We use to drink and bath in the hot spring water bue don't have rehabilitation facilities
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.