• Title/Summary/Keyword: Water time

Search Result 15,216, Processing Time 0.042 seconds

Determination of Optimal Time to Replace On-S Water Pipeline by Analyzing Water Main Failures and Economical Efficiency (수도사고 분석 및 경제성 평가를 통한 상수관로 최적 교체시기 결정)

  • Kim, Jong-Sin;Jung, Kwan-Sue;Bae, Chul-Ho;Lee, Doo-jin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.3
    • /
    • pp.279-285
    • /
    • 2009
  • In this study, applied to the industrial water service, it is verified feasibility of break-even analysis method which has not been introduced in Korea. The On-san water pipeline of 7.1km among the Ul-san industrial water service is selected and the optimal replacement time calculated by break-even analysis method is year 2033 to 2044 which will be 53 to 67 years since the pipes were buried. If indirect cost such as the value of lost water and traffic disruption, service interruption, etc. is calculated as 30 and 100% of the direct cost, the financially optimum replacement time is advanced 3 to 9 years. These ways present rational criteria to establish long-term plan for budget and to execute the limited budget efficiently.

Water Quality Behavior by the Sluice Gate Operation of Freshwater Lake (배수갑문 방류시점 및 방류량에 따른 담수호의 수질변화)

  • 김선주;김성준;김필식;이창형
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.45 no.1
    • /
    • pp.91-101
    • /
    • 2003
  • Boryeong Seadike located at southwestern seashore of Korean peninsula completed in 1997. Sluice gate operation can be an important factor to maintain lake water quality and reduce retaining time of pollutants within lake. The lake water quality simulation model, WASPS was adopted and tested to find out proper gate operation timing and discharge amount. From the simulation of sluice gate operation, the results showed that the later the time of discharge for loosing 1 day successively to 6 days, the better the quality of water. Discharge amount showed relatively minor changes of water quality. This means that pollutants flowed into lake from watershed do not have enough time to mix up with deep water when the gate opened at early time. About 3 days delay of discharge caused the dilution effect to stabilize the lake water quality in case of Boryeong freshwater lake.

A Study on integrated water management system based on Web maps

  • Choi, Ho Sung;Jung, Jin Young;Park, Koo Rack
    • Journal of the Korea Society of Computer and Information
    • /
    • v.21 no.8
    • /
    • pp.57-64
    • /
    • 2016
  • Initial prevention activities and rapid propagation conditions is the most important to prevent diffusion of water pollution. If water pollutants flow into streams river or main stresm located in environmental conservation area or water intake facilities, we must predict immediately arrival time and the diffusion concentration to the proactive. National Institute of Environmental Research developed water pollution incident response prediction system linking dam and movable weir. the system is mathematical model which is updated daily. Therefore it can quickly predict the arrival time and the diffusion concentration when there are accident of oil spills and hazardous chemicals. Also we equipped with mathematical model and toxicity model of EFDC(Environmental Fluid Dynamics Code) to calculate the arrival time and the diffusion concentration. However these systems offer the services of an offline manner than real-time control services. we have ensured the reliability of data collection and have developed a real-time water quality measurement data transmission device by using the data linkage utilizing a mode bus communication and a commercial SCADA system, in particular, we implemented to be able to do real-time water quality prediction through information infrastructure of the water quality integrated management business created by utilizing the construction of the real-time prediction system that utilizes the data collected, the Open map, the visual representation using charts API and development of integrated management system development based on web maps.

Development of Operation Rules in Agricultural Reservoirs using Real-Time Water Level and Irrigation Vulnerability Index (실시간 저수위 및 용수공급 취약성 지표를 활용한 농업용 저수지 운영 기준 개발)

  • Nam, Won Ho;Choi, Jin Yong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.55 no.6
    • /
    • pp.77-85
    • /
    • 2013
  • The efficient operation and management strategies of reservoirs in irrigation periods of drought events are an essential element for drought planning and countermeasure. Korea Rural Community Corporation has developed the real-time water level observation system of agricultural reservoirs to efficiently operate reservoirs, however, it is not possible to predict drought conditions, and only provides information of current situation. Hence, it is necessary to evaluate accurate irrigation vulnerability and efficiently reservoir operation rules using current water level. In this paper, the improvement methods of reservoir operation planning were developed with water supply vulnerability characteristic curves comparing to automatic water gauge at agricultural reservoirs. The 11 reservoirs were simulated applying the reservoir operation rules which was determined by irrigation vulnerability characteristic curves criteria and real time water level, and evaluated water supply situation in 2012 year. The analysis of results can be identified probabilistic possibility of water supply failures compared with the existing reservoir operation criteria. These results of efficient reservoir operation rules can be achieved enable irrigation planners to optimally manage available water resources for decision making, and contributed to maintain the water supply according to demand strategy for agricultural reservoirs management.

Water and Salt Budgets for the Yellow Sea

  • Lee, Jae-Hak;An, Byoung-Woong;Bang, Inkweon;Hong, Gi-Hoon
    • Journal of the korean society of oceanography
    • /
    • v.37 no.3
    • /
    • pp.125-133
    • /
    • 2002
  • Water and salt budgets in the Yellow Sea and Bohai are analyzed based on the historical data and CTD data collected recently using box models. The amounts of volume transport and of water exchange across the boundary between the Yellow and East China Seas are estimated to be 2,330-2,840 $\textrm{km}^3$/yr and 109-133 $\textrm{km}^3$/yr, respectively, from the one-layer box model. Corresponding water residence time is 5-6 years. In the Bohai, water residence time is twice as long as that in the Yellow Sea, suggesting that the Yellow Sea and Bohai cannot be considered as a single system in the view of water and salt budgets. The results indicate that water and salt budgets in the Yellow Sea depend almost only on the water exchange between the Yellow and East China Seas. The computation with the coupled two-layer model shows that water residence time is slightly decreased to 4-5 years for the Yellow Sea. In order to reduce uncertainties for the budgeting results the amount of the discharge from the Changjiang that enters into the Yellow Sea, the vertical advection and vertical mixing fluxes across the layer interface have to be quantified. The decreasing trend of the annual Yellow River outflow is likely to result that water residence time is much longer than the current state, especially for the Bohai. The completion of the Three Gorges dam on the Changjiang may be change the water and salt budgets in the Yellow Sea. It is expected that cutting back the discharge from the Changjiang by 10% through the dam would increase water residence time by about 10%.

A Study on Typical Rates of Water-use for Primary School, Middle School and High School Facilities (초.중.고등학교 시설의 급수 사용량에 대한 연구)

  • Kim, Kyu-Saeng
    • Proceedings of the SAREK Conference
    • /
    • 2007.11a
    • /
    • pp.510-515
    • /
    • 2007
  • A Study on Typical Rates of Water-use for School Facilities has been carried out in this work. Water supply system is given much weight in school facilities. Therefore, it set up a basis efficiency using of water sources to calculate typical rates of water use. The results are summarized as follows ; 1) On the whole, typical rates of water-use was founded out 15 L / stu. d in pirmary school, 10 L / stu. d in middle school and 30L / stu. d in high school smaller than the existing it. It was rate of water-use change as season and Max. Rates of water-use was July. 2) I deem that school hours are 5 hour's in primary school, 7 hour's in middle school and 8 hour's in high school. It the concept of 1 hour that is lesson time 40 minutes and resting time 10 minutes in primary school, lesson time 45 minutes and resting time 10 minutes in middle school and lesson time 50 minutes and resting time 10 minutes in high school. 3) It is desired that we calculate the volume of pump and water tank throughout this concept and the size of water tank should be 1.5 times with taking pick load into consideration by this study on typical rate of water-use. 4) The amount of using water increases in gradually and I consider the life cycle of facilities is more than 10 years. As a result, I can forecast that the size will be insufficiency but I deem that if we devise a plan about parallel pumping on water tank space, we can cope with it. Also, it is expected that we can cut back the transport energy by controlling pump volume.

  • PDF

Prediction on Safety Time of Water Intake at Paldang Reservior According to Scenarios of Water Pollution (팔당 유역 수질사고 시나리오에 따른 취수 안전시간 예측)

  • Baek, Kyong-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.5
    • /
    • pp.135-140
    • /
    • 2012
  • In this study, the behavior of pollutant was calculated at Paldang reservior according to several scenarios of the accidental water pollution by means of the numerical models for forecasting water quality. Also managemental plans for situation of the accidental water pollution happening at Paldang watershed were simulated. According to the simulating results, a plan of increase of discharge at Cheongpyeong dam reduced the peak concentration of pollutants, whereas extended the time for stopping water intake. Another plan, drop of water elevation at Paldang dam, decreased seriously the time for stopping water intake although there were a little effect to decrease the peak concentration. Thus it was concluded that appropriate combinations of the plans for the increase discharge and the dropping water elevation should be used to deal with the accidental water pollution at Paldang watershed.

Development of the Smart Device for Real Time Water Quality Monitoring (실시간 수질 모니터링을 위한 스마트 디바이스의 개발)

  • Ryu, Dae-Hyun;Choi, Tae-Wan
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.14 no.4
    • /
    • pp.723-728
    • /
    • 2019
  • Citizens' distrust of water pollution is very high in tap water that we routinely drink. In addition, water pollution accidents of tap water are difficult to predict and the risk is high, so real-time monitoring and management are needed. Therefore, it is necessary to introduce real-time water quality monitoring using the Internet of things(IoT). Residual chlorine is more persistent and economical than other disinfectants and it is easy to check residual effect, so it is mainly used as a disinfection index in waterworks. It can be monitored in real time by using IoT technology in order to secure the safety of tap water. In this study, we developed smart device for real-time water quality monitoring using amperometry sensor and analyzed its performance.

Variation of Water Level on the Upstream Gauging Station by Operation of the Drainage Sluice Gate of Geumgang Estuary Dam (금강하구둑 배수갑문 조작에 의한 상류수역의 수위변동)

  • Park, Seung-Ki
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.47 no.6
    • /
    • pp.15-24
    • /
    • 2005
  • The normalization on the characteristics of water level change at the upstream gauging station was attempted according to the operation of drainage sluice gate of the Geumgang estuary dam. The characteristics were normalized by the analysis of water level change and by the linear-regression of the water level data measured at the inner station of Geumgang estuary dam and upstream gauging station. The results of normalization may be referred to the management of Geumgang estuary lake, the operation of pumping and drainage stations in the shore of the lake. The mean response time of water level change on Ibpo, Ganggyeong and Gyuam water level station were 39,81 and 160 minutes, when sluice gate was opened respectively. The mean velocity of surface wave, the mean displacement of water level change, the mean time of water level change and the mean rate of water level change varied largely depending on the location of gauging station and the characteristics of stream section of the water level gauging station.

Removal Rates of VOCs(Volatile Organic Compounds) for Treatment Condition using DAF(Dissolved Air Flotation) in Water Treatment (DAF(Dissolved Air Flotation)를 이용한 정수처리에서 처리조건에 따른 VOCs(Volatile Organic Compounds)의 처리효율에 대한 연구)

  • Kim, Mi-Jeong;Jun, Se-Jin
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.13 no.3
    • /
    • pp.91-100
    • /
    • 1999
  • Treatment conditions of DAF(Dissolved Air Flotation) and removal rates of VOCs(Volatile Organic Compounds) in mixed water of H raw water and VOCs were investigated. The used VOCs were benzene, toluene, ethylbenzene, and xylene in aromatic compounds and iso propyl mereaptan, n-butyl mereaptan, dimethyl disulfide, and iso butyl mercaptan in odors. The related parameters include water type, treatment method, clay concentration, pH condition, flocculation time, flotation time, per-cent recycle, water temperature, pressure. The removal rates of VOCs were different on treatment process and water condition. Treatment time was longer, removal rates of VOCs was higher. Water temperature was more important than pressure in DAF parameters. Molecular weight was related with removal rate in several kinds of VOCs were decraesed by competition of each component in II raw water. When algac blooming D water was treated by DAF, TCOD(Total chemical Oxygen Demand) and chorophyll a was removed over 96%.

  • PDF