Determination of Optimal Time to Replace On-S Water Pipeline by Analyzing Water Main Failures and Economical Efficiency |
Kim, Jong-Sin
(한국수자원공사 K-water연구원)
Jung, Kwan-Sue (충남대학교 토목공학과) Bae, Chul-Ho (한국수자원공사 K-water연구원) Lee, Doo-jin (한국수자원공사 K-water연구원) |
1 | 한국수자원공사(2006), 생애주기비용(LCC)을 고려한 수도시설물 재료 및 공법선정 방안 연구 |
2 | Goulter I.C., and Kazemi A. (1988). 'Analysis of Water Distribution Pipe Failure Types in Winnipeg', Canada. Jour. Transportation Engineering. 15, pp. 91-97 DOI |
3 | 한국수자원공사(1995), 노후관 개량을 위한 의사결정시스템 개발 |
4 | Deb A.K., Hasit Y.T., Schoser H.M., Loganathan G.V., Khambhammettu P(2002a), Decision Support System for Distribution System Piping Renewal, AWWARF |
5 | 환경부(2002), 노후수도관 평가 및 관리 매뉴얼 |
6 | Deb A.K., Grablutz F.M., Hasit Y.T., Snyder J.K., Loganathan G.V.(2002b), Prioritizing Water Main Replacement and Rehabilitation, AWWARF |
7 | Peter D. Rogers and Neil S. Grigg (2006), Failure assessment model to prioritize pipe replacement in water utility asset management, ASCE, Water Distribution Systems Analysis Symposium |
8 | 한국수자원공사(2008), 설계적산지침 |
9 | Mavin K.(1996). Predicting the Failure Performance of Individual Water Mains, Research Report No.114. Urban Water Research Association of Australia |
10 | 배철호(2007) 상수도 금속관의 파손위험성 평가에 의한 잔존 수명 예측모델 개발, 박사학위논문 숭실대학교 |
11 | 한국수자원공사(2004), 울산공업용수도 정밀안전진단 보고서 |
12 | Andreou S.A., Marks D.H. and Clark R.M., (1987), A New Methodology for Modelling Break Failure Patterns in Deteriorating Water Distribution Systems, Advances in Water Resources. 10, pp.11-20 DOI ScienceOn |
13 | 환경부(2007), 2006 상수도 통계(수정본) |
14 | 이현동, 정원식, 안윤주 (2002), '국내 중소도시 상수도관의 파손특성 및 영향인자 분석에 관한 연구', 대한상하수도학회지, 16권 4호, pp. 383-388 |
15 | Loganathan G.V., Park S., and Sherali H.D.(2002). Threshold Break Rate for Pipeline Replacement in Water Distribution System, Journal of Water Resources Planning and Management/ July/August DOI ScienceOn |