1 |
Kim, Jong -Hyug, 1996, Operation Realities 3:1d Management Status on Geumgang Estuary Dam, Korean Committee of Large Dams, Proceedings of the Sixteen Symposium for Dam Technology. (in Korean)
|
2 |
Park, Seung-Ki and Kim, Tai-Cheol, 1999, Change of Hydraulic Characteristics in the Downstream Keum River after the. Construction of Estuary Dam, J. of the Korean Society of Agricultural Engineers, Vol. 41, No.5, pp. 6876. (in Korean)
|
3 |
Park, Chang-Eon and Park, Seung-Woo, 1995, River Flow Forecasting Model for the Youngsan Estuary Reservoir Operation (III) -Propagation of Flood Wave by Sluice Gate Operations-, J. of the Korean Society of Agricultural Engineers, Vol. 37, No; 2, pp. 13-20. (in Korean)
|
4 |
Geum River Flood Control Office, 1994-1995, Geum River Flood Forecasting and Warning. (in Korean)
|
5 |
RDC, 1997, Operation and Maintenance Report on Geumgang Estuary Dam(1994-1996). (in Korean)
|
6 |
Melvyn Kay, 1998, Practical Hydraulics, E & FN Spon, New York, pp. 174-186
|
7 |
ADC, 1983, Hydrological Survey Report of the Geum River I Region. (in Korean)
|