• Title/Summary/Keyword: WBS (Work Breakdown Structure)

Search Result 96, Processing Time 0.026 seconds

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

A Study on developing WBS based QDBS(Quantity Database System) for the schedule and the cost data integration for road construction project (도로공사의 공정 및 공사비 연계활용을 위한 디지털 수량산출정보시스템(QDBS) 개발 연구)

  • Yun, Seok-Heon;Kim, Seong-Sig
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.119-127
    • /
    • 2007
  • Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.

Human Resource Allocation Method using Similarity between Software Project Experience and WBS Activity (S/W 프로젝트 수행 경험과 WBS Activity의 유사도 측청을 통한 인력 할당 기법)

  • Kwon, Jinyong;Lee, Euijong;Baik, Doo-Kwon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2015.04a
    • /
    • pp.530-533
    • /
    • 2015
  • 기존의 조사에 따르면 현재 소프트웨어 개발 프로젝트의 실패율은 높은 편이다. 미국의 The Standish Group의 보고서에 따르면 소프트웨어 프로젝트의 성공률은 약 32%로 낮음을 볼 수 있다. 소프트웨어 프로젝트 성공에 영향을 주는 요소 중 하나는 인력배치이다. 이는 소프트웨어 개발 프로젝트의 참여 인력 구성에 따라 생산성, 비용 및 개발기간이 달라지게 되기 때문이다. 즉 인력 구성에 따라 프로젝트 성공률에 많은 영향을 주게 될 수 있다. 프로젝트 인력할당은 WBS(Work Breakdown Structure)에 따라 PM(Project Manager) 또는 부서장이 할당하게 되는데, 이들은 프로젝트 구성원들의 상세한 정보까지 파악이 어렵기 때문에 인력구성의 어려움이 존재한다. 과거에 수행했던 개발 프로젝트에서 유사성이 높은 작업을 했음에도 불구하고 전혀 경험이 없는 작업에 할당되면 상대적으로 업무 지식습득에 어려움을 겪고 시간 지연에 따른 비용이 추가적으로 발생하게 된다. 이러한 문제를 해결하고자 본 연구는 소프트웨어 개발 프로젝트 구성원의 상세한 정보들과 소프트웨어 개발 업무와의 유사도 측정을 통해 인력을 업무에 할당하는 기법을 제안한다. 이를 위하여 제안한 기법을 프로토타입으로 구현한 후 현업에서 실제 개발되는 프로젝트에 적용하여 제안 기법의 우수함을 평가한다.

A Study on the Development of Safety Demolition Work System by using Work Breakdown Structure (작업분류체계(WBS)를 이용한 안전해체공사 시스템 개발에 관한 연구)

  • Kim, Kyang-Seo;Yang, Keek-Young;Lee, Yung-Su;Yoon, Yer-Wan;Kim, Chun-Hak
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.2 no.3
    • /
    • pp.176-187
    • /
    • 1998
  • The Dismantlement and Construction of the buildings have the characteristic of floating change with repetition within a Time Schedule which has fixed resources, that is, Manpower, Materials and Equipments, and involve many disaster factors in performing each processes. But as these factors are variable, a work supervisor should be able to understand data analysed distinctive factors of each activities systematically, organizationally, and scientifically, and diagrammatic information media so that he can control any complex and situation beyond forecast. Thus this study is intended to be a barometer of weighing if the existing process schedule has taken security into consideration by making the characteristics of organization and action of Work package per process in a building field with more factors like these into a network system and is intended to minimize construction disasters by systematizing this into a Transformational Network.

  • PDF

Application Method of Phase Division of Fast Track for Construction Project with Complex Structures (복합공종으로 구성된 건설공사의 패스트트랙 단계구분 적용 방식 분석)

  • Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.1
    • /
    • pp.95-105
    • /
    • 2022
  • Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.

IMPLEMENTATION OF PRODUCT DATA MANAGEMENT SYSTEM FOR DESIGN OF BRIDGE STRUCTURES

  • Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1318-1323
    • /
    • 2009
  • In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.

  • PDF

A Development of Integrated Risk Management Model of Large Construction Projects (건설분야 통합 리스크관리에 관한 구성 모델)

  • Kim Chang-Hak;Park Seo-Young;Kang In-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.101-108
    • /
    • 2004
  • The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

  • PDF

A Development of Integrated Prototype Model for Risk Management of Construction Projects (건설공사의 리스크관리를 위한 통합전산모형 구축)

  • Kim, Chang-Hak;Park, Seo-Young;Kang, In-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.3D
    • /
    • pp.469-480
    • /
    • 2006
  • The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.

Automatic Project Planning Technique and Tool Based on Software Industry Requirements (소프트웨어 산업체 요구사항을 반영한 자동화된 프로젝트 계획 생성 지원 기법 및 도구)

  • Park, Jihun;Shin, Donghwan;Hong, Gwangui;Seo, Dongwon;Hwa, Jimin;Bae, Gigon;Seo, Yeong-Seok;Bae, Doo-Hwan
    • Journal of Software Engineering Society
    • /
    • v.26 no.4
    • /
    • pp.77-92
    • /
    • 2013
  • To plan a software project, the manager (1)make a work breakdown structure (WBS), (2) estimate efforts for each task, (3) assign employee to each task, and (4) estimate overall schedule. When software project becomes complicated, the possible combination of WBS, effort, and employee assignments dramatically becomes larger. Software planning tool can help software project managers to deal with this complexity. In this research, we discuss with a group of experts who work in software industry, to elicit practical requirements that should be considered in the software planning technique. Considering these requirements, we develop a software project planning tool APP (Automatic Project Planner) which provide effort estimation based on historical knowledge data and automatic human resource allocation. Our technique can be the basis of reasonable and practical software project planing.

  • PDF

Application of Systems Engineering based Design Structure Matrix Methodology for Optimizing the Concept Design Process of Naval Ship (함정 개념설계 프로세스 최적화를 위한 시스템엔지니어링 기반의 설계구조행렬 방법론 적용)

  • Park, Jinwon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.56 no.1
    • /
    • pp.1-10
    • /
    • 2019
  • Naval ship design and related other activities can be characterized by the complexity of the interactions among products, activities, and disciplines. Such complexities often result in inferior designs, cost overrun, and late-delivery. Hence there exist tremendous interests in both improving the design process itself and optimizing the interactions among design activities. This paper looks at the complexity of designing naval ships thereby leading to the innovation of current ship design practices using design structure matrix. It can be used to induce the optimal ordering of design activities as well as identify sources of complexities. The method presented here identifies coupled design activities useful for reducing the complexity of naval ship design as well as optimally reordering design activities. This paper recommends the use of design structure matrix method suitable for numerically optimizing the concept design process of naval ship, and reducing cost and time required in designing naval ships by modeling and analyzing the design activities and engineering tasks, defined in systems engineering planning documents.