• Title/Summary/Keyword: W project

Search Result 412, Processing Time 0.023 seconds

Bigdata Analysis Project Development Methodology (빅데이터 분석 프로젝트 수행 방법론)

  • Kim, Hyoungrae;Jeon, Do-hong;Jee, Sunghyun
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.3
    • /
    • pp.73-85
    • /
    • 2014
  • As the importance of big data analysis increases to improve the competitiveness of a corporate, a unified big data project development methodology is required in order to study the problem of a corporate in a systematic way and evaluate the problem w.r.t. a business value after solving the problem. This paper propose Scientific Data Anslysis and Development methodology(SDAD) which are integrated methodology of software development and project management for easier application into a field project. SDAD consisits of 6 stages(problem definition stage, data preparation stage, model design stage, model development stage, result extraction stage, service development state), each stages has detailed processes(47) and productions(93). SDAD, furthermore, unified previous ISP, DW, SW development methodologies in terms of the data analysis and can easily interchange the productions with them. This paper, lastly, introduces a way to assign responsible persons for each process and provide communication procedures in RACI chart to improves the efficiency of the interaction among professionals from different subjects. SDAD is applied to a Bigdata project in Korea Employment Information Services institution and the result turned out to be acceptable when evaluated by the supervision.

ON FARM DEMONSTRATION OF VARIOUS STORAGE METHODS FOR UREA TREATED WHEAT STRAW

  • Khan, A.G.;Ullah, W.;Azim, A.;Ali, A.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.9 no.3
    • /
    • pp.281-285
    • /
    • 1996
  • On farm demonstration of urea treatment (5 kg urea dissolved in 60 litre water/100kg) of straw was performed at 6 different sites and treated straw was stored by three different methods i.e., plastic covered, mud plastered and existing farmers technique (mud plastered on the top and open from sides) to determine the best storage method in field. Untreated and treated samples were taken after 5 week storage period and subjected to crude protein, crude fibre and cell wall constituents analysis. In situ dry matter digestibility of straw was measured by nylon bag technique in buffalo bulls. Crude protein content increased by 100 to 153 percent in treated straw stored by different methods. Maximum increase in crude protein of treated straw was noticed in mud plastered method. Urea treatment of straw resulted in significant decrease in crude fibre contents in all the storage methods. Treatment of straw enhanced the in situ digestibility by 25-49 percent and maximum digestibility (53%) was found in mud plastered storage method. It was concluded that the mud plastered storage method for urea treated straw was found to be the best at farm level.

Implementation of Sensor Observation Service Prototype for Interoperable Geo-Sensor Networks in Korean Land Spatialization Program

  • Park, Jae-Min;Choi, Won-Ik;Kwon, Dong-Seop;Jung, Yeun-J.;Park, Kwan-Dong
    • Journal of Korea Spatial Information System Society
    • /
    • v.11 no.2
    • /
    • pp.63-72
    • /
    • 2009
  • Korean Land Spatialization Program (KLSP) is an R&D program of the National GIS Project for developing ubiquitous GIS technologies under the control of the M inistry of Land, Transport and Maritime Affairs (M LTM). The first program of the KLSP, which lasts from 2006 to 2012, initiated with $132 million of national funds and $42 million of private matching funds. Aiming to develop the 'Innovation of GIS technology for ubiquitous Korean land', the KLSP consists of five core research projects and one research coordination project to practically utilize and commercialize the results of core research projects. The Korean Land Spatialization Group (KLSG) is planning the KLSP Test-Bed for testing, integrating, and exhibiting the KLSP's outcomes. About 40% of the outcomes are related products to geo-sensor and wireless sensor network (W SN). Thus, interoperable, scalable and web accessible frameworks like an OGC SWE (Open Geospatial Consortium Sensor Web Enablement) are mandatory because some of the products must be connected to each other in a KLSG Test-Bed. The main objective of this paper is to introduce the KLSP Test-Bed and the SWE SOS (Sensor Observation Service) prototype, which is developed for interoperable geo-sensor networks of the KLSP.

  • PDF

A Study on the Number of Sample Units for Yield Components (I) (수량구성요소(收量構成要素)를 위(爲)한 표본수(標本數)에 대(對)한 연구(硏究) (제(第)1보(報)))

  • Oh, W.K.;Chang, S.H.;Lee, H.C.
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.2 no.1
    • /
    • pp.75-78
    • /
    • 1969
  • The necessary number of hills for panicle counts have been obtained, and are more in Kangwon-Do and Chulla Nam-Do where the variability of sampling error is higher as compared to other provinces. It seems that number of samples do not depend on the latitude but on the variabilities of yield components within the province and it is considered that about 5% sampling fraction gives about 75 to 85% of relative information on the average.

  • PDF

A study on meaning of Policy introduction of the KEM-SPEC Projects (KEM-SPEC(한국전기공사표준시방서) 도입의 정책적 의의 분석)

  • Kim, D.S;Kim, H.J.;Koo, K.W;Han, S.O
    • Proceedings of the KIEE Conference
    • /
    • 2008.04b
    • /
    • pp.25-27
    • /
    • 2008
  • This paper discusses the implications of the MASTER SPEC project and its introduction to Korea in terms of social and political contexts. The motives for this report starts from both theoretical and empirical puzzles. Its theoretical motive is concerned to the right form of governance of electric-construction standardardization. Upon the experience of the United States and many European countries, we have acknowledged the role of government in the setting of industrial policy formats and standardization. However, the mechanisms of industrial governance have greatly changed these days, from the centralized one to the participatory one. We call the latter type governance. The form of governance implies the participation of both public and private actors in the policy-making of industrial matters. We have sought to find a better format in the case of electric-construction field. The answer is: the governance initiated by the private actors rather than the government-centered one. The project of MASTER SPEC, in this sense, has many probable implications toward the standard-setting of future industrial managements in Korea.

  • PDF

Front End Planning Tool (FEPT) Based on an Electronic Process Management

  • Safa, Mahdi;Haas, Carl T.;Hipel, Keith W.;Gray, Joel
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.1-12
    • /
    • 2013
  • Research indicates that good front-end planning (FEP) results in the achievement of higher levels of project performance. By facilitating collaboration among stakeholders in diverse locations with the use of workflow-enabled processes, such pressures can be reduced, and the overall process and results of FEP can be improved. With these goals, a front-end planning tool (FEPT) has been developed as support for owners and major contractors who are engaged in front-end planning. This paper presents the new FEPT and describes how it has been used for construction megaprojects in the nuclear power, oil and gas, and mining industries. The paper begins with the definitions related to and an explanation of the general process for implementing and applying the FEPT and then describes and analyzes how the FEPT was applied in case study projects in order to test its validity. The results indicate that the FEPT increases the efficiency and effectiveness of front-end planning for the megaprojects studied and that it has the potential to produce similar results for other megaprojects.

Interoperability Verification using BIM Case Models of Road Project (도로 프로젝트의 BIM 사례모델 구축을 통한 호환성 검증)

  • Moon, Hyoun-Seok;Kim, Chang-Yoon;Cho, Guen-Ha;Moon, Jin-Seok;Ju, Ki-Bum
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.44-53
    • /
    • 2015
  • Recently, BIM has been widely applying in civil engineering projects centering on the private construction industry in order to establish self guidelines for spreading in practice. However, most BIM technologies and software are based on the architectural projects. In these environments, it is not easy to apply the BIM to a infrastructure field. Even BIM standards with IFC (Industry Foundation Classes) are also focusing on architectural projects. Especially, both private and public sectors do not know about how BIM delivery system should be performed, and how such deliverable should be submitted to the government yet. Thus, we need to analyze an application level of BIM S/W (Software) in real projects and verify their interoperability. Besides, since there are not any common standards that can exchange IFC models for civil engineering projects, we have many issues in converting as-built infrastructure models into IFC and delivering their design documents to the government. Accordingly, this study aims to perform a BIM process with commercial software for real road project after a detailed design process is finished and verify interoperability between diverse BIM software for securing BIM data reliability.

A Collaborative Design System in Architecture: defining the process and testing its system environment (建築 協業設計 시스템 구축을 위한 프로세스와 環境 試險에 관한 연구)

  • Kim, U.;Kang, M.H.;Choi, J.W.;Kim, S.A.
    • Korean Journal of Computational Design and Engineering
    • /
    • v.7 no.1
    • /
    • pp.57-65
    • /
    • 2002
  • The purpose of this research is to develop a collaborative architectural design system. Design collaboration requires an extensive use of communication methods as well as the participation of various experts from different domains. Such facts address several issues when the Internet and digital media are able to create a completely new work environment. The building design process was studied, and possible modes of design collaboration were defined. A prototype system is being developed in accordance with the defined collaboration model. The system integrates a set of communication tools and web-based design media. Such media include a synchronous multi-user web CAD tool, a schematic 3D design tool, and a electronic whiteboard. A project database was designed in order to coordinate the project-wide communication which elaborates technologies such as web-based data access. In order to find out the effectiveness of the system, a usability test was performed both in quantitative and qualitative manner. The research will contribute to the development of world-wide design and construction collaboration through the Internet, which is becoming a mainstream building process model.

A Novel Interactive Power Electronics Seminar (iPES) Developed at the Swiss Federal Institute of Technology (ETH) Zurich

  • Drofenik, Uwe;Kolar, Johann W.
    • Journal of Power Electronics
    • /
    • v.2 no.4
    • /
    • pp.250-257
    • /
    • 2002
  • This paper introduces the Interactive Power Electronics Seminar - iPES - a new software package for teaching of fundamentals of power electronic circuits and systems. iPES is constituted by HTML text with Java applets for interactive animation, circuit design and simulation and visualization of electromagnetic fields and thermal issues in power electronics. It does comprise an easy-to-use self-explaining graphical user interface. The software does need just a standard web-browser, i.e. no installations are required. iPES can be accessed via the World Wide Web or from a CD-ROM in a stand-alone PC by students and professionals. Due to the underlying software technology iPES is very flexible and could be used for on-line learning and could easily be integrated into an e-learning platform. The aim of this paper Is to give an introduction to the iPES-project and to show the different areas covered. The e- learning software is available at no costs at $\underline{www.ipes.ethz.ch}$ in English, German, Japanese, Korean, Chinese and Spanish. The project is still under development and the web page is updated in about 4 weeks intervals.

Modern High-Power TBM with Advanced Procurement System (오늘날의 고성능 TBM과 선진 장비조달 방안)

  • Jee, Warren W.
    • Tunnel and Underground Space
    • /
    • v.23 no.3
    • /
    • pp.161-168
    • /
    • 2013
  • Recently, the application of High-Power mechanized tunnelling technology has been expended around the world. Especially, High-power Modern TBM machines are used in a successful results. Essential for the great success of this modern TBM in difficult rock conditions are based on the development of machine power, suitable better cutter developments, and also developed assesment technology regards on the extensive site investigations. OPP (Owner Procurement Process) system is a proven alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures the TBMs and tunnel lining in advance of the tunnel contract procurement and provides TBM to a tunnel contractor with a goals of reducing project risks and accelerating project schedule. Depending on the blasting vibrations and noises, mechanized tunnelling will be more important particularly in city areas.