Analysis of Boundary Conditions for Activities' Relationships in Linear Scheduling Model (선형 공정계획 모델의 액티비티 관계의 경계조건 분석)

  • Ryu, Han-Guk;Kim, Tae-Hui
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.23-32
    • /
    • 2011
  • Domestic leading construction companies has been establishing and performing TACT scheduling method, similar to linear scheduling model such as line of balance and repetitive schedule, and etc. in which repetitive construction works are involved like high-rise building. Linear scheduling model has been researched as a visual scheduling method presenting the work space and time information. Likewise scheduling constraints of CPM network such as finish-to-finish, start-to-start, finish-to-start, start-to-start, linear scheduling model also has the relationships constraints, namely boundary conditions, between activities. It is especially necessary to define the boundary conditions of the activities' relationships in order to apply the linear scheduling model to be compatible with the network schedule. Therefore, this research considers the boundary conditions between activities for establishing the linear scheduling model. This paper also applies the proposed boundary conditions to TACT schedule and then deduces the main considerations in order to establish and perform TACT schedule.

The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

Development of the DBR Scheduling system using UML and the Visual Basic (UML과 Visual Basic을 활용한 DBR Scheduling 시스템 개발)

  • Ock, Young-Seck;Park, Chul-Ho
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2006.11a
    • /
    • pp.31-36
    • /
    • 2006
  • Most production scheduling system in the ERP is based on the MRP. The MRP does not adapt to the change of the product design and the production schedule. It is important to keep due date in make-to-order production small and medium company. But it hard to keep due date on the MRP. The DBR Scheduling system of the TOC is excellent for adapting to production system change and suitable to make-to-order production small and medium compan. In this thesis, we make a system design using the Together(UML tool) and develope a production scheduling system using Microsoft Visual Basic.Net.

  • PDF

Discrimination of a Pleasant and an Unpleasant State by Autoregressive Models from EEG Signals (EEG신호의 시계열분석에 의한 쾌, 불쾌 감성분류에 관한 연구)

  • Im, Seong-Sik;Kim, Jin-Ho;Kim, Chi-Yong
    • Journal of the Ergonomics Society of Korea
    • /
    • v.17 no.1
    • /
    • pp.67-77
    • /
    • 1998
  • The objective of this study is to extract information from electroencephalogram(EEG) signals with which we can discriminate mental states. Seven university students were participated in this study. Ten stimuli based on IAPS (International Affective Picture Systems) Were presented at random according to the experimental schedule. 8-channel ($O_1$, $O_2$, $F_3$, $F_4$, $F_7$, $F_8$, $FP_1$, and $FP_2$)EEG signals were recorded at a sampling rate of 204.8 Hz for visual stimuli and analyzed. After random ten sequential stimuli presentation, the subject subjectively assessed the stimulus by scaling from -5 to 5. If the stimulus was the best and the worst, it was scored 5 and -5, respectively. Only maximum and minimum scored-EEG signals within each subject were selected on the basis of subjectively assessment for analysis. EEG signals were transformed into feature objects based on scalar autoregressive model coefficients. They were classified with Discriminant Analysis for each channel. The features produced results with the best classification accuracy of 85.7 % in $O_1$ and $O_2$ for visual stimuli. This study could be extended to establish an algorithm which quantify and classify emotions evoked by visual stimulus using autoregressive models.

  • PDF

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF

The Impact of Multicultural Education Program in the Daily Life Schedule on Children's Multicultural Acceptability and Pro-social Behavior (일과를 통한 다문화교육 프로그램이 유아의 다문화 수용성과 친사회적 행동에 미치는 영향)

  • Hong, Kil Hoe
    • Korean Journal of Childcare and Education
    • /
    • v.10 no.6
    • /
    • pp.313-332
    • /
    • 2014
  • The purpose of this research is to distinguish the effect of children's multicultural educational program in the daily life schedule that is integrated in Nuri-programme on children's multicultural acceptance and pro social behavior. Subjects were 4-year-old children from Gyounggi-do A city separated into anexperimental group and acontrol group. Both groups werepre tested. After conducting a program for 44 times, the data was collected using visual resources and instruction considering 4-year-old children's ability to read. In conclusion, the experimental group educated with children's multicultural program showed higher multicultural acceptance. These show that multicultural education affect pro-social behavior.

Advanced Alignment-Based Scheduling with Varying Production Rates for Horizontal Construction Projects

  • Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.403-411
    • /
    • 2013
  • Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.

  • PDF

Development of Fashion Product Entrepreneurship Education Process for Crowdfunding (Part I) -Focusing on Wadiz Rewards-based Crowdfunding- (크라우드펀딩을 위한 패션제품 창업교육과정 개발 (제I보) -와디즈(Wadiz) 보상형 크라우드펀딩을 중심으로-)

  • Lee, Jungho;Kwon, Hajin
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.44 no.1
    • /
    • pp.175-191
    • /
    • 2020
  • This study proposes an entrepreneurship education process for fashion product start-ups through rewards-based crowdfunding. It examines issues such as: the general concept of crowdfunding and the pros and cons of rewards-based crowdfunding, the detailed curriculum plans in a chronological order for the regular class development, and the presentation of a visual plan to show the whole process. An entrepreneurship education process is developed in 13 steps: research on crowdfunding market, prototype plan, prototype production, story development, visual contents development, rewards development, project evaluation, public schedule & service setting, period setting & start funding, community management (Q&A), funding ends & deposit, complete manufacturing & start delivering, and the final information disclosure & open the next project plan. This research is intended to investigate rewards-based crowdfunding as a new paradigm of entrepreneurship and apply entrepreneurship education in fashion product development. However, it is limited to studying the Wadiz crowdfunding platform in Korea. Therefore, we propose a case study on various crowdfunding platforms in Korea, a case study on entrepreneurial curriculum application, and a follow-up study on the possibility of entry into an overseas crowdfunding platform.

The Study on the Exterior Design Decision Process of the Maneuver Weapon System Development (기동무기체계 개발에서 외형 디자인 결정 프로세스에 관한 연구)

  • Youn, Byungjo;Lee, Ho
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.13 no.2
    • /
    • pp.1-8
    • /
    • 2017
  • The Core in Weapon system R&D is to realize the user required capabilities in limited schedule and cost. Therefore, the design of weapon system focuses to functional design for realization of requirement capabilities. However, the weapon system should not only basically bring the confidence to friendly forces bring fear to enemy forces to maximize the operational effectiveness of weapon systems and we consider the exterior design as the important factor to compete with foreign systems in international defense market besides capabilities and cost. For that reason, we made study case about the visual design decision process applied to the LVT(light tactical vehicle) project which was recent successful deployment among the many R&D projects of auto industry. Based on this case, this study suggests the necessity of the exterior design decision process the maneuver weapon system is developed.

Development of an Integrated Multizone Model for Indoor Air Environment Prediction (실내공기환경 예측을 위한 통합 다구획 모델의 개발)

  • Cho, Seok-Ho
    • Journal of Environmental Science International
    • /
    • v.17 no.9
    • /
    • pp.993-1003
    • /
    • 2008
  • Interior space in most buildings is divided into several zones. The most important factors relating to the indoor air environment are temperature, airflow, humidity, and contaminant concentration. An integrated multizone model to predict these environmental factors simultaneously was developed. Also, a computer program for this model was written by the language of VISUAL BASIC. The proposed model was applied to a apartment with five rooms that had been tested by Chung. Comparison of predicted results by this study with measured results by Chung showed that their variations were within 14% for airflow rates, 1% for temperatures, 12% for humidities, and 5% for concentrations. It was seen that the opening operation schedule of building has a significant effect on the air moisture md contaminant removal. Thus, this model may be available for predicting the indoor air environment and may be contributed to design the ventilation plan for controling of indoor air quality.