Gasoline generates organic acid and polymer (gum) by hydrocarbon oxidation depending on the storage environment such as temperature and exposure to sunlight, which can cause metal corrosion, rubber and resin degradation and vehicle malfunction caused by accumulation in fuel supply system. The gasoline which has not been used for a long time in bi-fuel (LPG-Gasoline) vehicle causes problems, and low octane number gasoline have evaporated into the field, but the exact cause has not been studied yet. In this study, we suggest a plan of quality management by investigating the gasoline oxidation behavior. In order to investigate the oxidation behavior of gasoline, changes of gasoline properties were analyzed at various storage conditions such as storage time, storage vessel type (vehicle fuel tank, PE vessel and Fe vessel) and storage circumstances (sunlight exposure and open system, etc.). Currently distributing gasoline and bioethanol blended fuel (blended 10%) were stored for 18 weeks in summer season. The sample stored in PE vessel was out of quality standard (octane number, vapor pressure, etc.) due to the evaporation of the high octane number and low boiling point components through the vessel cap and surface. Especially, the sunlight exposure sample stored in PE vessel showed rapid decrease of vapor pressure and increase of gum. Bioethanol blended fuel showed similar results as gasoline.
Kim, Chil-Sung;Roh, Hee-Seon;Kim, Kang-Tae;Kim, Ji-Heon;Kim, Jong-Su
The KSFM Journal of Fluid Machinery
/
v.8
no.3
s.30
/
pp.16-25
/
2005
The purpose of this study is localization of safety relief valves for Nuclear Service. The safety relief valve is the important equipment used to protect the pressure vessel, the steam generator and the other pressure facility from overpressure by discharging the operating medium when the pressure of system is reaching the design pressure of the system. We developed design technology used FEM ' CFM about safety relief valve for Nuclear Service according to ASME (or KEPIC) Code and KHNP's Technical Specification. To prove validity of a design technology, actually, we manufactured and inspected and tested the sample products designed according to a developed technology. The capacity qualification test was achieved according to requirement of ASME(or KEPIC) Code by NBBI and the functional qualification test was achieved according to ASME QME-1 for operating condition in technical specification of KHNP by NLI. Therefore we have to achieve the development of safety relief valves for Nuclear Service with our own technologies.
Park, Jin-woo;Park, Sam-sik;Ku, Kun Woo;Hong, Jung Goo
Journal of ILASS-Korea
/
v.21
no.2
/
pp.71-77
/
2016
Air pollutants nitrogen oxides are inevitably generated in the combustion reaction. Its amount trend is steadily increasing because the rapid modern industrialization and population growth. For this reason, NOx is controlled to reducing the harmful components in the exhaust gas. So Marine Environment Protection Committee (MEPC) take effect 'Tier I', 'Tier II' of air pollution regulation in 2005 and 2011 respectively. According to NOx emissions are strictly regulated management of the vessel through them. In addition, since 2016 the regulation enter into force in the next step 'Tier III' was confirmed by MEPC 66th committee. It's 80% enhanced emissions limits than the 'Tier I' Alternatively these emission regulation, research is actively being carried out about exhaust gas after-treatment methods through the vessel application of Selective Catalytic Reduction(SCR). Therefore depending on the basic specification of cell density according to the Area velocity, Space velocity, Linear velocity is studied the effects of NOx removal efficiency
Recently deck crane of multi purpose cargo vessel (MPCV) is designed to posi¬tion in side instead of in the center line of the upper deck with a view to reduce the transportation cost and shipbuilding cost by shortening the length of ship. In this paper, the crane post was at first designed according to the crane maker’s specification and parent ship and the structure is analysed with Finite Ele¬ment Method. Through the careful reviews on the result of analysis, the final design of crane post was modified. The crane post is designed as a cylindrical in upper part and hexagonal in lower part instead of cylindrical on the whole as before. The connecting part of crane post is designed with the form of mixture of the cylinderical and hexagonal. Since the center of cylindrical and hexagonal section are not on the same line, it is expected to have the stress concentration. So, in order to attenuate the concentrated stress on the connecting part, the upper and lower parts was stiffened by inserting plate to enlarge the area of welding. The structure of deck part includes the tank side floor which is depend on the lower structure of the crane post that would support the force of the crane post by placing with 1.5 frame interval of the vertical plate.
Journal of Advanced Marine Engineering and Technology
/
v.40
no.9
/
pp.812-817
/
2016
This paper dealt with electrical and optical requirements of naval vessel's LED luminaires. And the products have been tested to determine whether the products meet these requirements or not. This study analyzes the cost-effectiveness of the LED luminaires which have been implemented for the application to naval vessel since 2012. The LED requirements were proposed based on comparison among other standards/specifications such as Korean Industrial Standard(KS), Korean Defense Specification(KDS) and US Navy Military Specification(MIL). Application of the proposed requirements were then be verified by analyzing and testing the electrical and optical characteristics of both fluorescent Luminaires and LED luminaires, and the LED luminaires were installed to A1 naval vessels according to the proposed requirements. As results, approximately 40% of power consumption was saved by using LED luminaires compared to using fluorescent luminaires while luminous flux was increased by 10~15%. Moreover, using LED luminaires of the proposed requirements exhibited the effect of reducing approximately 4,900 fluorescent luminaires in 10 naval vessels in the time period between 2012 to 2015, which is equivalent to cost reduction of \0.56M approximately. Such cost reduction is further expected considering the LED luminaires will continue to be applied to naval vessels in the future.
Park, Sang Gyu;Kim, Min-Chul;Lee, Bong-Sang;Wee, Dang-Moon
Korean Journal of Metals and Materials
/
v.48
no.2
/
pp.122-132
/
2010
Higher strength and fracture toughness of reactor pressure vessel steels can be obtained by changing the material specification from that of Mn-Mo-Ni low alloy steel (SA508 Gr.3) to Ni-Mo-Cr low alloy steel (SA508 Gr.4N). However, the operation temperature of the reactor pressure vessel is more than $300^{\circ}C$ and the reactor operates for over 40 years. Therefore, we need to have phase stability in the high temperature range in order to apply the SA508 Gr.4N low alloy steel for a reactor pressure vessel. It is very important to evaluate the temper embrittlement phenomena of SA508 Gr.4N for an RPV application. In this study, we have performed a Charpy impact test and tensile test of SA508 Gr.4N low alloy steel with changing impurity element contents such as Mn and P. And also, the mechanical properties of these low alloy steels after longterm heat treatment ($450^{\circ}C$, 2000hr) are evaluated. Further, evaluation of the temper embrittlement by fracture analysis was carried out. Temper embrittlement occurs in KL4-Ref and KL4-P, which show a decrease of the elongation and a shifting of the transition curve toward high temperature. The reason for the temper embrittlement is the grain boundary segregation of the impurity element P and the alloying element Ni. However, KL4-Ref shows temper embrittlement phenomena despite the same contents of P and Ni compared with SC-KL4. This result may be caused by the Mn contents. In addition, the behavior of embrittlement is not largely affected by the formation of $M_3P$ phosphide or the coarsening of Cr carbides.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2021.10a
/
pp.59-61
/
2021
The electric propulsion development is underway to minimize pollutants and greenhous gas emissions during the operation of ships / offshore installation vessels. The importance of the use and efficient management of batteries, which is an ESS system in ships / offshore installation vessels, is increasing. Generally, in ESS where battery is applied, cell balancing and life span are monitored in real time by BMS. Ships / offshore installation vessel are equipped with several ESS rooms, and ESS rooms with ESS systems of the same specification are being constructed due to the recent demand for electric propulsion development. In this paper, we propose an algorithm to additionally predict and diagnose battery pack and cell balancing failures by comparing BMS data for each rooms. The proposed algorithm compares the BMS data of each ESS Room according to the environmental change of the ship / offshore installation vessels, measures accurate status information, and reliably monitors it to prevent accidents in advance.
Mooring bollards are the mandatory facility in ports for they are the objects used to fasten the ship to its position at the berth. All the mooring bollards were installed following suggested sizes, numbers, materials and shape of installation according to Port and Fishing Design Standards. However, Korea has no management standard for use of mooring bollards to safety in ship berthing. In this research, the installation standard for mooring bollards including the holding power applied to mooring bollards in berthing was studied. Also, the performance of mooring bollards for minimum safety guarantee in berthing based on research of various specification by their sizes was analyzed. The analysis on mooring bollards was examined by each power on mooring bollards from the applied force in berthing divided into horizontal and vertical direction in order to examine the performance of domestic mooring bollards, the limit force is calculated based on detailed specification research result. As a result, the working stress according to the towing force was found to be at least 150Mpa and it was evaluated to be 60% of the limit strength. Also, by comparing each forces, the appropriateness was examined and the specification of maximum capability calculated. This performance evaluation method based on detail specification of mooring bollards will be expected to be useful to examine the appropriateness of mooring bollards for various types of vessel in berthing and to develop maintenance and management standard through the performance change evaluation referring to mooring bollard detailed specification changes.
Choi, Sang In;Kim, Young Chul;Kim, Myung Soo;Baek, Tae Hyun
Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
/
v.7
no.2
/
pp.427-435
/
2017
Most of the domestic city buses are equipped with the pressure vessels subjected to internal pressure applied by compressed natural gas. Pressure vessels subjected to internal pressure are used in various forms and purposes. Fuel is explosive and has flammable high pressure. The damage of the pressure vessel causes many property damage and loss of life. Safe design for pressure vessel is always necessary. Due to these reasons, many studies using finite element analysis have been conducted. In this paper, the stresses of cylindrical vessel and spherical dome were analyzed using ANSYS, a finite element analysis software. In order to verify the validity of the analysis, a model with a perfectly spherical shape of the dome was designed and observed. Based on the ASME standard in used, stress distribution was also analyzed for models designed with compressed natural gas(CNG). The FEM analysis software agreed with the theory when the dome shape was perfectly spherical. The model designed based on the ASME specification theory, stress concentration occurred in the knuckle part.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2005.05a
/
pp.809-812
/
2005
This paper explains environmental tests of vessel-launched missiles, verifying if a fully assembled missile performs properly from disturbance on delivery by vehicles or naval vessels. We also have operated vibration tests by ground and naval transportation as well as shock tests by naval transportation before firing. The environmental tests have adopted Military Standard Specification and confirmed missile's reliability by performance tests, followed by missile's development. However, this significant testing which have meaning was dong by the missile's body and not with parts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.