Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

A Study on the Improvement of the Design VE Process using VE Idea-DataBank System (설계 VE 프로세스 개선을 위한 VE Idea-DataBank System 구축에 관한 연구 - 한국도로공사 고속도로 건축공사를 대상으로 -)

  • Park, Heetaek;Park, Chansik;Jung, Wooseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.28-38
    • /
    • 2014
  • Construction value engineering(VE) is often performed in the form of a short term review of designs, rather than during a regular workshop with a standardized work plan, and its application method is limited. Thus, tasks are performed by applying the method in reverse depending on the VE results, and function analysis, a key VE method, is omitted or only applied for the sake of formality. In addition, it is hard to expect great results from VE because of insufficient time and budget allowed to perform VE and a lack of understanding of VE procedures and methods. In particular, the methods used to store and reuse the tremendous amount of ideas and information created during the process of VE implementation is not systematic. Even the Korea Expressway Corporation, which has produced relatively systematic VE performance compared to other institutions, has had the above-mentioned problems. Therefore, this study aims to improve existing VE processes and suggest a method to efficiently store and retrieve VE information by analyzing the limitations of construction VE practice and the characteristics of VE for highway facilities as part of improving design VE performance.

Improvement Plan based on Awareness Investigation of Construction VE System in Domestic Construction (국내 건설공사 시공 VE 제도 인식조사에 기반한 개선방안)

  • Park, Jin-Young;Seo, Ho-Hyong;Kim, Byung-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.79-88
    • /
    • 2018
  • Construction business VE is classified into design stage VE and construction stage VE. The faster the application, the better the effect. Therefore, the design stage VE was legislated in 2000 and actively applied. However, it is urgent to activate the construction VE, which is complementary to the design VE system. In the meantime, we have made a lot of efforts to activate construction VE by suggesting the necessity of construction VE system, improvement of technology development compensation system, concrete implementation method of construction VE, but it was not effective due to lack of related laws. This study compares and analyzes construction VE system in Korea and abroad for the activation of construction VE after recognizing such domestic reality. A survey of experts in each field of the construction industry was conducted and suggestions for improvement of construction VE system suitable for domestic construction industry were suggested.

The Case Analysis on the Road-Crossroad Design VE Competition (도로교차로 설계VE 경진대회 사례분석)

  • Kim, Ki-Han;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.839-842
    • /
    • 2008
  • Construction VE is the system introduced in order to reduce the life cycle cost and promote the performance of construction facilities, used in architecture and civil construction since apply to construction over 10 billion from december 2005. But yet it is short of VE specialist and it is not a purpose in maximization of value creation through VE but strong better awareness of tool for budget reduce. This study tries to contribute to qualitative advance of design VE by analyze substantial degree of VE Procedure and VE result by Job Plan used widely in domestic an object design VE competition case to crossroad.

  • PDF

Project Participants Cooperative Decision Making Model with QFD-based VE Technique (프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델)

  • Lim, Chulhee;Chun, Jaeyoul;Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2019
  • VE analysis is a method to secure definite functions and performance by defining user's various requirements clearly and propose alternatives to reduce cost. However, the present domestic VE project has difficulty in defining design function analysis clearly due to time constraints as well as difficulty in effective and efficient communication between project stakeholder. Domestic results of VE were largely focused on reducing cost while maintaining the functions of the existing facility. Therefore, this study aims to secure the optimal functions for users according to the original intent of user requirements through QFD-VE model which project VE participants can make collective and cooperative decision making. QFD-VE is a technique that first, it can make collaborative decision making in defining and modifying of design function and setting the importance of requirement function. Second, it allow project VE participants to check design interference and conflict between neighbor systems. This study also provided a mathematical model for implementing the computer system using QFD-VE in the future.

Potential Value Improvement Target Choice Methodology (PVTCM) in Construction Projects (건설 프로젝트의 잠재적 가치개선 대상 선정 방법론(PVTCM))

  • Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • Construction VE activities has occupies an important position as a key tool of the project in terms of budget and performance improvements. Reflecting this situation, VE application scope is being expanded than before. Thus, construction projects are required the continued research and development for effective use of construction VE. VE target choice method is the central part in the construction VE work. But, this has a problem with low utilization in practical terms. Accordingly, this study was developed the new methodology(PVTCM) for VE target selection of the construction VE work. Its contents are as follows: First, to analyze practical problem for VE target choice method through VE practical data. Second, to extract the high potential VE object based on the cost model and ideas similarity by excellent VE cases analysis. Third, to implement standardized VE object item by using affinity diagram for each construction type items. This research were conducted to experts interviews for comparison analysis with the cost model as one of a representative target selection method. As a result, proposed method were implemented significantly higher performance in terms of practical effectiveness than conventional method.

The Conceptual Model of Web-Based Information System for Value Engineering(WISE) in Construction Projects (건설사업 웹 기반 VE 정보시스템의 개념 모델)

  • Lee Jae-ho;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.167-177
    • /
    • 2005
  • Value Engineering(VE) Workshop executes many tasks with VE team members from various experts of construction field on the basis of VE Job Plan for a short period of time. However, the VE team members are not useful with using VE information until now because it is not systematic in the accumulation and application of VE information. Especially, these problems constitute the obstacles to communication, reliability and quickness of VE information. It also causes an increase of time and cost at VE Workshop. Therefore, the results of this study suggests the conceptual model of Web-Based Information System for VE(WISE) in order to improve the effectiveness of VE Workshop and solve the problem as is stated above.

An Effective Function Analysis Application for Construction VE Projects (건설 VE 프로젝트에서 효과적인 기능분석 적용방안)

  • Choi Seok-In
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.78-84
    • /
    • 2002
  • In VE(Value Engineering) process, function analysis technique is utilized as a stepping stone to induce creative idea. However, function analysis is regarded as the most difficult job for VE team to undertake. For this reason, the function analysis is not properly applied or even omitted in construction VE studies. The current problems of function analysis in construction VE are following: 1) lack of basic understanding of the function analysis as problem solving technique, 2) the sequential step-by-step analysis process, 3) lack of interrelationship between function analysis and other phase in th VE process, 4) lack of time, experience, training, and quantitative data etc. The existing function analysis is faultiness theoretically. However, it is not enough for efficient use in practice, Thus The study aims to suggest an function analysis application method and to develop a computerized FAST(function Analysis System Technique) diagramming model, called Easy-FAST, for the efficient and effective function analysis on construction VE projects.

  • PDF

Implementation Status and Improvement Strategy of the Value Engineering in Domestic Construction Industry (국내 건설VE 운영현황과 발전방향)

  • Seo, Yong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.137-144
    • /
    • 2007
  • In the year of 1980 and 2000, the Korean government institutionalized the Value Engineering methodology in the construction phase and the design phase respectively. While design-phase VE have been applied to construction industry actively, which was institutionalized 7 years ago, construction-phase VE have not been applied to industry frequently, although it was institutionalized 25 years ago. On the other hand, at the time of social demands for VE is increasing, it has been pointed out that VE should be compatible with the delivery system. And the time of VE study, the operational management of VE study, and the maintenance process of the result of the VE study also should be considered. In this study, a scheme to improve VE methodology in the construction industry is proposed based on the literature review and the data analysis of domestic and foreign state of VE.

  • PDF

A study on the effective propulsion method of design VE that used TRIZ (TRIZ를 활용한 설계VE의 효율적 추진방안)

  • Oh, Jae-Won;Kim, Kwang-Soo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.1
    • /
    • pp.177-187
    • /
    • 2012
  • Design VE is a kind of contradictive administrating that pursue both value improvement and cost reduction, whereas TRIZ is a method used to solve contradiction based on its invention principal. This paper comprehended the problems regarding the object through design VE using function analysis, and presented a number of methods to solve this by using the principal of TRIZ. This study compared the characteristics of Design VE and TRIZ, and suggested a procedure that integrates both Design VE and TRIZ.

  • PDF