• Title/Summary/Keyword: Variation of Average Delay

Search Result 42, Processing Time 0.029 seconds

Estimation of Transportation Infrastructure Scale for Evaluation of Super-Tall Building Locational Appropriateness: Focusing on Urban Area (초고층건축물 입지적정성평가를 위한 교통기반시설의 규모산정방법에 관한 연구: 도심지역을 기준으로)

  • Kim, Hyun Ju;Oh, Young Tae;Nam, Baek
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.15-24
    • /
    • 2013
  • To accommodate urban concentration of population, multi-purpose super-tall buildings have been introduced, but they induce many travel demands causing regional traffic problems. While several travel demand management policies such as transit promotion or parking limits are presented to alleviate such problems, transportation infrastructure are still insufficient to meet high demands. In this study, super-tall buildings are categorized by scale and purpose, then mode-specific derived demand is estimated using modal share of each category. Optimal transportation infrastructure level is determined by condition-based average changing amount yielded by street network delay (in case of road) or the number of transit routes (in case of transit).

The study on emotion recognition by time-dependent parameters of autonomic nervous response (TDP(time-dependent parameters)를 적용하여 분석한 자율신경계 반응에 의한 감성인식에 대한 연구)

  • Kim, Jong-Hwa;Whang, Min-Cheol;Kim, Young-Joo;Woo, Jin-Cheol
    • Science of Emotion and Sensibility
    • /
    • v.11 no.4
    • /
    • pp.637-644
    • /
    • 2008
  • Human emotion has been tried to be recognized by physiological measurements in developing emotion machine enabling to understand and react to user's emotion. This study is to find the time-dependent physiological measurements and their variation characteristics for discriminating emotions according to dimensional emotion model. Ten university students were asked to watch sixteen prepared images to evoke different emotions. Their subjective emotions and autonomic nervous responses such as ECG (electrocardiogram), PPG (photoplethysmogram), GSR (Galvanic skin response), RSP (respiration), and SKT(skin temperature) were measured during experiment. And these responses were analyzed into HR(Heart Rate), Respiration Rate, GSR amplitude average, SKT amplitude average, PPG amplitude, and PTT(Pulse Transition Time). TDPs(Time dependent parameters) defined as the delay, the activation, the half recovery and the full recovery of respective physiological signal in this study have been determined and statistically compared between variations from different emotions. The significant tendencies in TDP were shown between emotions. Therefore, TDP may provide useful measurements with emotion recognition.

  • PDF

Estimation of delay time between precipitation and groundwater level in the middle mountain area of Pyoseon watershed in Jeju Island using moving average method and cross correlation coefficient (이동평균법과 교차상관계수를 이용한 제주도 표선유역 중산간지역의 강수량과 지하수위 간의 지체시간 추정)

  • Shin, Mun-Ju;Moon, Soo-Hyoung;Koh, Gi-Won;Moon, Duk-Chul
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.7
    • /
    • pp.533-543
    • /
    • 2020
  • In order to provide information for proper management of groundwater resources, it is necessary to estimate the rise time of groundwater level by calculating the delay time between the time series of precipitation and groundwater level and to understand the characteristics of groundwater level variation. In this study, total delay time (TDT) and cross correlation coefficient between the moving averaged precipitation generated by using the moving average method to take into account the preceding precipitation and the groundwater level were calculated and analyzed for the nine groundwater level monitoring wells in the Pyoseon watershed in the southeast of Jeju Island. As a result, when the moving averaged precipitation was used, the correlation with the groundwater level was higher in all monitoring wells than in the case of using the raw precipitation, so that it was possible to more clearly estimate the delay time between precipitation and groundwater level. When using the moving averaged precipitation, it had cross correlation coefficients of up to 0.57 ~ 0.58 with the time series data of the groundwater level, and had a relatively high correlation when considering the preceding precipitation of about 24 days on average. The TDT was about 32 days on average, and it was confirmed that the consideration of preceding precipitation plays an important role in estimating the TDT because the days of moving averaged precipitation greatly influences the calculation of the TDT. In addition, through the use of moving averaged precipitation, we found an error in estimating the TDT due to the use of raw precipitation. Through the method of estimating the TDT used in this study and the use of the R code for estimating the TDT presented in the appendix of this paper, it will be possible to estimate the TDT for other regions in the future relatively easily.

Efficient QP-per-frame Assignment Method for Low-delay HEVC Encoder (저지연 HEVC 부호화기를 위한 효율적인 프레임별 양자화 파라미터 할당 방법)

  • Park, Sang-hyo;Jang, Euee S.
    • Journal of Broadcast Engineering
    • /
    • v.21 no.3
    • /
    • pp.349-356
    • /
    • 2016
  • In this paper, we propose an efficient assignment method that assigns quantization parameter (QP) in accordance with group of picture (GOP) structure given in HEVC encoder. Each video frames can have difference QP values based on given GOP configuration for HEVC encoding. Particularly, for important frames we can assign low QP values, and vice versa. However, there has not been thorough investigation on efficient QP assignment method by far. Even in HEVC reference software encoder, only monotonic QP assignment method is employed. Thus, the proposed method assign adaptive QP values to each GOP so that temporal dynamic activity between GOPs can be exploited. Through the experiment, the proposed method showed a 7.3% gain of compression performance in terms of BD-rate compared to HEVC test model (HM) in low-delay configuration, and outperformed the existing QP assignment study on average.

Frame Skipping Algorithm for Minimization of Video Quality Variation (영상 품질 변화를 최소화하는 프레임 생략 알고리즘)

  • Park, Sang-Hyun;Lee, Sung-Keun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.11 no.8
    • /
    • pp.1582-1588
    • /
    • 2007
  • According to recently presented QoS architecture by 3GPP, a traffic conditioner may be deployed to provide conformance of the negotiated QoS. In this paper, a real-time frame-layer rate control method which can be applied to the traffic conditioner of 3GPP is proposed. The proposed rate control method uses an efficient frame skipping algorithm method for low computational complexity, and performs bit allocation at the frame level to minimize the average distortion over an entire sequence as well as variations in distortion between frames. The proposed algorithm does not produce time delay from encoding, and is suitable for real-time low-complexity video encoder.

A Construction and Operation Analysis of Group Management Network about Control Devices based on CIM Level 3 (CIM 계층 3에서 제어 기기들의 그룹 관리 네트워크 구축과 운영 해석)

  • 김정호
    • The Journal of Society for e-Business Studies
    • /
    • v.4 no.1
    • /
    • pp.87-101
    • /
    • 1999
  • To operate the automatic devices of manufacturing process more effectively and to solve the needs of the resource sharing, network technology is applied to the control devices located in common manufacturing zone and operated by connecting them. In this paper, functional standard of the network layers are set as physical and data link layer of IEEE 802.2, 802.4, and VMD application layer and ISO-CIM reference model. Then, they are divided as minimized architecture, designed as group objects which perform group management and service objects which organizes and operates the group. For the stability in this network, this paper measures the variation of data packet length and node number and analyzes the variated value of the waiting time for the network operation. For the method of the analysis, non-exhausted service method are selected, and the arrival rates of the each data packet to the nodes that are assumed to form a Poission distribution. Then, queue model is set as M/G/1, and the analysis equation for waiting time is found. For the evalution of the performance, the length of the data packet varies from 10 bytes to 100 bytes in the operation of the group management network, the variation of the wating time is less than 10 msec. Since the waiting time in this case is less than 10 msec, response time is fast enough. Furthermore, to evaluate the real time processing of the group management network, it shows if the number of nodes is less than 40, and the average arrival time is less than 40 packet/sec, it can perform stable operation even taking the overhead such as software delay time, indicated packet service, and transmissin safety margin.

  • PDF

Critical Chain Project Management as a New Paradigm for Reducing the Project Delivery Time (프로젝트 일정 단축을 위한 새로운 경영 패러다임 Critical Chain Project Management(CCPM))

  • Jang, Seong-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.68-74
    • /
    • 2007
  • Critical Chain Project Management(CCPM) is a new project management system paradigm which maintains the advantages of PERT/CPM and improves the shortcomings of it. In CCPM the task durations are determined as 50% time estimates, ie average time discarding the their contingency. CCPM determines the critical chain the constraint of a projects considering the logical precedence relationship and resource conflict resolution. Project buffer is located at the end of critical chain to absorb the variations of critical chain. The size of project buffer is usually calculated as the half of the sum of critical chain length. Also feeding buffer is inserted after each non-critical chain which feeding into the critical chain to prevent the time delay of critical chain from uncertainties of non-critical chains. Resource buffer can be utilized to improve the availability of resources of critical chain. Buffer management is a project execution and control mechanism. Buffers are classified into 3 zones. They are OK zone, Watch and Plan zone and Expediting zone. If the project status is within Watch and Plan zone, contingency plan is established. And if it changes into Expediting zone, the preplanned contingency plan are executed to recover the time delay. In CCPM the workers are asked to work with relay runner work mechanism that they work fast if possible and report their completion to project manager for the succeeding task to start as soon as possible. The task durations are not considered as the promised time schedule. The multi-tasking is prohibited.

  • PDF

Polyphenol Content and Yield Variation of Red-colored Cultivars Depends on Transplanting Date in Southern Plain Region of Korea (남부평야지에서 적미 품종의 이앙시기에 따른 폴리페놀 함량 및 수량변이)

  • Bae, Hyun Kyung;Oh, Seong Hwan;Hwang, Jung Dong;Seo, Jong Ho;Kim, Sang Yeol;Oh, Myung Kyu
    • KOREAN JOURNAL OF CROP SCIENCE
    • /
    • v.62 no.3
    • /
    • pp.166-171
    • /
    • 2017
  • For high-quality colored rice production, the cultivation environment is a critical factor. The major environmental factor is temperature, which includes the accumulated and average temperature during vegetative and reproductive stages. Generally, during the cultivation period, the temperature can be controlled by shifting the transplanting date. This study was carried out to determine the optimum transplanting date for high-quality red-colored rice production. Four red-colored rice varieties (Jeokjinju, Jeokjinjuchal, Hongjinju, and Gunganghongmi) were used as test materials. The transplanting dates were May 20 and June 5, 20, and 30 in 2015~2016. The most variable factor controlled by the transplanting date was the grain filling rate. The varieties transplanted on June 30 showed low yields owing to the decrease in the grain filling rate. In contrast, the polyphenol content increased with increasing delay in the transplanting date. Collectively, these two results indicate that the optimum transplanting date was June 20. The average temperature for 30 days after the heading date (30DAH) highly affected the polyphenol content. A lower temperature during the 30DAH induced higher polyphenol contents but also caused low yield. The optimum 30DAH temperature for obtaining a higher yield and polyphenol content was $22{\sim}23^{\circ}C$. Using the average 30DAH and accumulated temperatures, the optimum transplanting date was calculated as June 18 to 24 in Miryang region. The optimum transplanting date of Kyeungsangnamdo region was approximately mid-June to early July, and that of Kyeungsangbukdo region was approximately early to mid-June.

Posture Stabilization Control of QuadCopter Using Sensor Fusion and Modified PID Control (진동에 강인한 센서 융합 필터와 개선된 PID 제어 방식을 이용한 쿼드콥터의 자세 제어)

  • Cho, Youngwan;Kim, Hyun-Soo
    • Journal of IKEEE
    • /
    • v.18 no.3
    • /
    • pp.376-382
    • /
    • 2014
  • In this paper, we propose a advanced attitude PID controller and sensor fusion method robust to the vibration of the quadcopter unmanned air vehicle using four BLDC motors. When the gyro sensor and acceleration sensor are fused, a complementary filter is designed to ignore the vibrations generated by the motors and to complement the drawbacks. As a result, we obtain accurate results than using each sensor. Also, it is possible to obtain a low delay results in robust to vibration than the low-pass filter or moving average filter, which is generally used for quadcopter. And we improved D controller, which have being used for attitude control of quadcopter, to quadcopter using gyro sensor. it was confirmed that the attitude is stabilized and error is reduced By using gyro sensor output instead of variation of estimated angle in D control.

Combustion Characteristics of Hinoki Cypress Louver after Pressure Impregnation with Boric Acid, Borax and Ammonium Phosphate (붕사, 붕산 및 인산암모늄을 가압 함침한 편백 루버의 연소특성)

  • Park, Hyung-Ju
    • Fire Science and Engineering
    • /
    • v.29 no.6
    • /
    • pp.1-5
    • /
    • 2015
  • In this study, the combustion characteristics of Hinoki Cypress Louver were measured after performing pressure impregnation with aqueous solution of boric acid, borax, and ammonium phosphate. The characteristics measured include ignition time, critical heat flux, and mass loss rate by incident hear flux (25, 30 and $50kW/m^2$). The samples used for the test were $100{\times}100{\times}10mm$, and the 5 min variation for each incident heat flux was measured 3 times. The results show that the ignition time for incident heat flux of $25kW/m^2$ showed a delay effect of 17.4 to 21.3% except for Type C-H. There was no significant difference at 35 and $50kW/m^2$ in the average mass loss rate in Types A-H and D-H, which had lower rates than Type N-H, which was predicted to be higher than that of Type N-H ($10.7kW/m^2$) by 38.22 to 60.46%. It is thus expected that at the time of initial primary fire, there would be a delay effect against fire spread.