The Case Analysis on the Road-Crossroad Design VE Competition (도로교차로 설계VE 경진대회 사례분석)

  • Kim, Ki-Han;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.839-842
    • /
    • 2008
  • Construction VE is the system introduced in order to reduce the life cycle cost and promote the performance of construction facilities, used in architecture and civil construction since apply to construction over 10 billion from december 2005. But yet it is short of VE specialist and it is not a purpose in maximization of value creation through VE but strong better awareness of tool for budget reduce. This study tries to contribute to qualitative advance of design VE by analyze substantial degree of VE Procedure and VE result by Job Plan used widely in domestic an object design VE competition case to crossroad.

  • PDF

An Implementation Analysis of Design VE to Turn-key and Alternative Project (턴키 및 대안입찰사업의 설계VE 성과분석)

  • Kim, Ki-Han;Lee, Hyun-Suk;Lim, Hee-Dong;Kim, Byung-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1011-1014
    • /
    • 2007
  • Design VE system in order to promote the economical efficiency and the functional elevation of construction facilities apply to conatruction over 10 billion from december 2005. But it don't achieve purpose of VE original to maximization of value creation through VE because VE perform formal and result center. This study suggests some idea and analyse implementation of design VE through design VE case of turnkey and alternative project performed in domestic.

  • PDF

Development of Mobile-Based Design Value Engineering(VE) Supporting System for VE Process Improvement (VE프로세스 개선을 위한 모바일 기반의 설계VE 시스템 개발)

  • Song, Chang-Young;Yang, Byong-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.5
    • /
    • pp.433-443
    • /
    • 2021
  • Value Engineering(VE) is an organized effort to create the most value through a functional analysis and creation of alternatives. Depending on the VE job plan, a VE Workshop must be performed in a certain place within a certain period of time. A VE Workshop, which is an organized activity that aims to create the best value through functional analysis and creation of alternatives, should be held in a certain place and at a scheduled time according to the VE job plan. In the Pre-Study, VE Study and Post-Study phases of VE, functional assessments, performance evaluations and idea evaluations are driven by variable management techniques and analysis methods, respectively. Generally, VE is executed for about 3 to 5 days in a particular place to create value. However, there are many problems associated with limiting all VE processes to a specific place and schedule. Moreover, in Korea, VE teams are required to finish all VE processes in a limited time because of the short duration of VE workshops, the necessity of which has been overlooked. Therefore, an efficient VE support system is required to resolve the problem of time and space limitations. In this study, a VE support system based on the Mobile environment was developed to support the VE Workshop process. This VE support system enables participants to review design documents, drawing sheets and all VE-related documents using mobile devices. After the Workshop, participants can conveniently rearrange the result(evaluation of function and ideas) at the workshop. Not only can the members of VE team can review the design documents, drawing sheet and all VE-related documents in the step before the workshop, but also the result(evaluation of function and ideas) of the workshop can be easily rearranged in the phase after the workshop under the developed supporting system using mobile devices.

A Study on the Estimating Strategy for the Design Phase VE Consulting Fee (설계VE 용역대가 산정방안에 관한 연구)

  • Kim Chul-Woong;Jung Young Il;Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.97-106
    • /
    • 2002
  • at the design phase and the effective design phase VE application, it is not sufficient to implement VE study at the design phase in the domestic construction industry. The method for estimating design phase VE consulting Fee regulated in current guideline and the insufficient incentive system according to the result of design phase VE application are major problems among the problems related to the roadblock of the active implementation Design phase VE. In this paper, firstly the current methods for estimating Engineering business consulting fee analogous to design phase VE and the domestic and foreign design VE consulting fee were examined, and detailed problems related to the method for estimating design VE consulting fee were indicated, and the Improvement direction were established. Secondly, the estimating strategy for the design phase VE consulting fee and the payment strategy of incentive according to the result of savings were proposed. Finally, the strategies were verified by interview with the experts.

Process Development and Verification for Construction VE Object Selection of Performance-Oriented (성능중심의 건설VE 대상 선정 프로세스 개발 및 검증)

  • Kim, Soo-Yong;Yang, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.4
    • /
    • pp.25-32
    • /
    • 2012
  • The current VE activity is recognizing the VE object selection in job-plan simply as formal procedure. Therefore, many problems are happening in the process of selecting VE object during the preparatory stage. As a result of trying to analysis problems through literature review and expert interview, the problems were surveyed such as the lack of connectivity between preparatory stage and analytical stage, the temporal cost-based restrictions, and lack of recognition in VE team members in the existing method of selecting subjects centering on the high-cost field. Accordingly, this study suggested the improved method of selecting VE objects in order to solve this problem in the stage of selecting VE objects. An improvement method of selecting VE objects is what selects the secondary VE subjects by applying again Fish-Bone diagram and Worth technique based on the primary VE objects, which were selected by the conventional technique of selecting objects in the high-cost field. To verify effectiveness in the proposed improvement method, it tried to apply it to the actual case of the road construction VE project. As result of, the improvement method was analyzed to be considerably effective in comparison with the existing selection method of VE objects. Therefore, the Improvement method will contribute to increasing the VE performance.

Implementation Status and Improvement Strategy of the Value Engineering in Domestic Construction Industry (국내 건설VE 운영현황과 발전방향)

  • Seo, Yong-Chil
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.137-144
    • /
    • 2007
  • In the year of 1980 and 2000, the Korean government institutionalized the Value Engineering methodology in the construction phase and the design phase respectively. While design-phase VE have been applied to construction industry actively, which was institutionalized 7 years ago, construction-phase VE have not been applied to industry frequently, although it was institutionalized 25 years ago. On the other hand, at the time of social demands for VE is increasing, it has been pointed out that VE should be compatible with the delivery system. And the time of VE study, the operational management of VE study, and the maintenance process of the result of the VE study also should be considered. In this study, a scheme to improve VE methodology in the construction industry is proposed based on the literature review and the data analysis of domestic and foreign state of VE.

  • PDF

Evaluating Effectiveness of BIM-based Idea Bank during VE Workshop

  • Kim, Hojun;Park, Heetaek;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.650-651
    • /
    • 2015
  • Value Engineering has been recognized as one of the construction management techniques for improving the value and benefits of whole project. However, due to the lack of the past data and inefficient free-thinking techniques, the idea generation during VE workshop is still inefficient and ineffective. Even though various studies related to theoretical methodology and technical systems relevant to database were conducted, VE team still mainly rely on their experience for idea generation. With this regard, this study suggests an approach of BIM-based idea bank and assesses its effectiveness by interviewing 20 VE experts in the industry. This approach covers the three steps of idea generation, consisting of 1) Developing BIM based VE database, 2) Generating VE ideas, 3) Updating VE ideas. The result showed that the proposed approach has great potentials to support VE team and improve the quality of VE ideas during creativity phase.

  • PDF

Standard Establishment Model for Value Engineering Work in Construction Projects (건설 프로젝트 VE업무 기준 수립 모델)

  • Kim, Soo-Yong;In, Chi-Sung;Yang, Jin-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.483-486
    • /
    • 2006
  • The value engineering(VE) in construction projects is systematic method which improve quality as well as reduction input cost and as construction VE work extends the range of application, the importance is rising. For this reason studies are needed to enforce design value engineering work systemically and effectively. In this study, we analyzed the problem of the present construction VE processing and deduced the model to be most suitable the work efficiency. As suggested model reflects systemically requirement item of owner and user, it will make approaching direction and standard establishment possible. So it will increase the following function analysis in analyzing step and the effectiveness of creating idea and make successful VE result.

  • PDF

A Proposal of NIA Model for Eco VE Decision of Construction Facilities (건설시설물 친환경VE 의사 판단 모델 NIA 제안)

  • Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.35 no.6
    • /
    • pp.1377-1385
    • /
    • 2015
  • Construction industry that was the core driving force of Korean economic growth is now being classified as an industry with the largest environmental load emission. Although various efforts were made accordingly to realize eco-friendliness, its effects is insufficient currently. Based on the understanding that eco effect of construction industry would be significant if Eco VE is applicable in the initial project stage, NIA model for understanding the eco VE decision of project owner was developed with simulations in this paper. Based on the proposal report of a private project to develop the Gyeongbuk Northern Region Environmental Energy Town, 20 questions on eco VE decision were used through simulations. The result showed 50% eco-friendly decision. The result of this study can be used to provide decision-making data for eco design in the initial stage of construction by utilizing NIA upon conducting survey research to deduce eco VE decision.

Development of Web-Based VE Supporting System for Effective Workshop (효율적인 VE워크숍을 위한 웹기반 VE지원시스템 개발에 대한 기초연구)

  • Lim, Jongkwon;Kim, Sunghun;Lee, Min-Jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.71-78
    • /
    • 2014
  • Value Engineering methodology was introduced about 30years ago and has significant achievement in Korea. However, many of workshop still focus on cost down process and do not spend enough time on function analysis and expert cooperation. As a result, limited range of creative ideas were produced. To improve effectiveness of VE workshop, this study developed web-based value engineering process and system. And this study applied it to real case study to evaluate effectiveness of proposed system. Developed VE system also provides automated FAST diagram function and decision-making supporting tools. The authors found that this developed web-based VE system can significantly help to save cost and improve performance of VE workshop by using the appropriate VE process, and quick cooperation between experts. In addition, this study shows an example of a VE case study that applies the web-based VE system process, which led to a very innovative and effective way to lead workshop.