Browse > Article

A Study on the Estimating Strategy for the Design Phase VE Consulting Fee  

Kim Chul-Woong (서울시립대학교 대학원)
Jung Young Il (서울시립대학교 대학원)
Kim Yang-Taek (서울시립대학교 대학원)
Hyun Chang-Taek (서울시립대학교 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.3, no.1, 2002 , pp. 97-106 More about this Journal
Abstract
at the design phase and the effective design phase VE application, it is not sufficient to implement VE study at the design phase in the domestic construction industry. The method for estimating design phase VE consulting Fee regulated in current guideline and the insufficient incentive system according to the result of design phase VE application are major problems among the problems related to the roadblock of the active implementation Design phase VE. In this paper, firstly the current methods for estimating Engineering business consulting fee analogous to design phase VE and the domestic and foreign design VE consulting fee were examined, and detailed problems related to the method for estimating design VE consulting fee were indicated, and the Improvement direction were established. Secondly, the estimating strategy for the design phase VE consulting fee and the payment strategy of incentive according to the result of savings were proposed. Finally, the strategies were verified by interview with the experts.
Keywords
Design Phase VE; Consulting Fee; Level of Effort; Consulting Fee Correction Factor; Incentive;
Citations & Related Records
연도 인용수 순위
  • Reference
1 이복남 외(2001). 건설사업관리비용산정, 한국건설산업연구원
2 Hyun, C. T.(2001). Suggestions for the Effective VE Application at the Design Phase in the Korean Construction Industry , SAVE International Proceedings, Society of American Value Engineers, Vol.36, Florida
3 Dell’ Isola, A J. (1997). Value Engineering: Practical Applications for Design, Construction, Maintenance & Operation, R.S. Means, Kingstone, RS Means
4 建設大臣 技術調査室, 1998. ‘建設VE, 米國VEのすべで’, 國際建設技術協會, 東京
5 조희종 (1994), 韓國의 辯護士, 범원사
6 건설교통부 (1999), 시설물의 안전점검 및 정밀안전진단 지침, 건설교통부 고시 제1999-409호