A Study of Improving the Reliability of VE Process (건설 VE 평가 신뢰도 향상 방안에 관한 연구)

  • Shin, Sung-In;Woo, Sungkwon;Jin, Sung-Ho;Choi, Seok-In
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.881-889
    • /
    • 2016
  • The VE evaluation process, in which the value is composed of the cost and the function, should have a characteristic of quantitative analysis based on specific figures rather than qualitative approach. However, most of the VE evaluation performed domestically have a problem of having no systematic process of quantification of the function, even though the cost is estimated and analyzed quantitatively. Moreover, in addition to the tendency of strong practical experience, the VE evaluation has the problem of limited application of practical scientific analysis caused by declining the suggestion of creative opinions by over quantification or over objectification. This paper presents the suggestions for improvement of VE evaluation processes, which satisfies the aspects of simplification and objectification, without hindering the essence of the evaluation in the practical business point of view.

Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors (핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구)

  • Park, Heedae;Han, Seung Heon;Kim, Sung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.399-408
    • /
    • 2009
  • The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

A Study on the Improvement for Design VE Job Plan through the Benchmarking (벤치마킹을 통한 설계VE 추진절차 개선에 관한 연구)

  • Um Ik-Jun;Jung Young-Il;Kim Chul-Woong;Hyun Chang-Teak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.88-95
    • /
    • 2001
  • To convert the construction industry from 'the high cost, the low efficiency' to 'the low cost, the high efficiency and value-added industry' and to enhance the performance and quality of products while reducing the cost, the related law and guideline were established and promulgated, which regulate that value engineering workshop during the preliminary design and the detail design stage should be a mandatory process. But VE practitioners are still confusing in choosing the proper value engineering process, because processes those are described in the various references use the different terms, steps and activities, even though they have their own specific characteristics. To resolve these confusions, the existing steps and activities of three kinds of the literature, four kinds of the organization's policy and other four kinds of study examples relating to the design VE were examined. And then, the differences and expecting problems were extracted through the comparison and analysis of those materials. After that, VE specialists' opinion through the questionnaire survey were grasped. Based on those studies the improved design VE Job Plan and activity statements were suggested.

  • PDF

A Case Study on the VE/LCC for selection on Improvement of Soft Soil Ground (연약지반처리공법 선정을 위한 VE/LCC 사례 분석)

  • Kim, Yong-Deuk;Lee, Young-Dae;Acharya, Nirmal Kumar
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.271-273
    • /
    • 2006
  • Because effect of value elevation is great as it is fast that construction VE is enforcement, VE at the design phase is more and more important more than construction process phase. But, is exerting negative impact for construction process phase by various problem that happen at design phase, and is causing discord to between project partners. Therefore, quality security in design phase is important first of all. Hereupon, this study emphasized that need VE at the design phase of extension plan forward more and more because achieved process that derive conceptional estimation by quantitative value calculating value index (V) through provision of design function point (F) and LCC expense (C) by comparison method of construction and chooses optimum method of construction through VE/LCC analysis example in improvement of soft soil ground method choice process of design phase.

  • PDF

A Study on Developing the Actual cases Database of Value Engineering of Building Construction (건축 VE 실적사례 데이터베이스(DB) 구축 연구)

  • Seo, Yong-Chil;Woo, Yu-mi;Lee, Seung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.2
    • /
    • pp.67-73
    • /
    • 2010
  • The results of VE (Value Engineering) analyses are highly feasible proposals that are produced by utilizing the experience and knowledge of professionals from a variety of fields. As such, the results of past similar projects can be useful in new projects. On this basis, it is vital to accumulate the historical data of the results on VE analyses performed at every stage, which are functions, ideas, and proposals. In this research, a data formational system for collecting this historic data was established by categorizing 'Item,' 'Function,' 'Idea,' and 'Proposal' according to VE process, and the data retrieval and the adjusting process were proposed. If the historic data of these are accumulated using the suggested method, it is expected to be useful at the stage of VE process.

A Basic Study for Building VET/CM Leading Construction VE Process (VET/CM 주도형 시공VE 프로세스 구축을 위한 기초연구)

  • Song, Hyun-Jang;Cha, Yong-Woon;Lee, Hyun-Jong;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.233-234
    • /
    • 2016
  • Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.

  • PDF

Procedures and Strategies for a Function Definition in the Design Phase VE (설계VE에서 기능정의를 위한 절차 및 방안)

  • Lee, Hyun-Jong;Park, In-Woo;Hyun, Chang-Taek;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.151-156
    • /
    • 2007
  • 2006년부터 VE 대상프로젝트가 확대되고, 기본설계와 실시설계단계에 각 1회씩 설계VE를 적용토록 규정되어 설계단계별로 VE가 각각 적용되는 프로젝트가 늘어나고 있다. 그리고 원가절감과 성능향상으로 프로젝트 가치를 높인 설계VE 사례도 많아지고 있다. 하지만 기본설계와 실시설계단계의 조건에 적합한 VE 수행방안에 대한 연구가 미진하고 참여자들의 경험과 이해가 부족하여 단계별 설계VE를 효율적으로 수행하는데 많은 어려움이 있다. 본 연구에서는 기본설계단계와 실시설계단계로 나누어 VE를 수행한 실무사례를 분석하여 기능정의와 아이디어 창출간의 연관관계 및 각 설계단계에서 기능정의를 수행할 때 발생하는 문제점을 도출하였다. 문제점을 해결하고 효과적인 설계VE를 수행하기 위하여 다음과 같은 개선방안을 제시하였다. 첫째, 설계프로세스의 흐름에 맞추어 기본설계에는 공간기능에 대하여하고 실시설계에는 부위에 대하여 기능정의를 수행한다. 이때 상위의 레벨에는 하위의 레벨의 기능정의가 연계되는 기능분류체계 (FBS : Function Breakdown Structure)를 제안하였다. 둘째, 기본설계와 실시설계단계의 기능정의를 수행하는 프로세스 (FDP : Function Definition Process)를 제안하였다. 셋째, 실시설계단계에서는 부위별 요구 성능 평가 매트릭스 (EFM : Element Function Matrix)를 적용하여 기능정의와 아이디어 창출이 연계되도록 하였다. 설계VE의 주요 부분인 기능정의 과정에 대한 문제점을 도출하여 해결방안을 제시함으로써, 보다 효과적인 설계VE의 수행을 기대할 수 있다.

  • PDF

Alternative Evaluation Method of GFI-based Construction Value Engineering (GFI를 활용한 건설공사 시공VE 대안평가 방법)

  • Kim, Sooyong;Lee, Youngrok;Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.3-10
    • /
    • 2015
  • Value engineering (VE) of the construction project is classified into design phase value engineering and construction phase value engineering. Design phase value engineering must apply to over 10 billion public construction projects by government law. Therefore, the design value engineering apply to actively in construction projects. In contrast, the construction value engineering apply to a limited certain construction project. The reason is that construction value engineering process can not reflect practical demands quality. The construction value engineering can implement to positive impact through the feasibility verification for constructability. In this research, we propose a method of construction value engineering that reflect the practical demands. This method is experts alternative evaluation of using by GFI-based. And, this study was applied to the practical cases to verify the applicability of the proposed method. As a result, proposed alternative evaluation method were analyzed highly efficient in terms of applying the process as well as the method compare to the conventional method.