An Application of Value Engineering to Design-Build Projects at Design Development Phase (설계${\cdot}$시공일괄 사업의 실시설계단계 VE적용 방안에 관한 연구)

  • Jung Jae-Jin;Kim Jae-Hyun;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.294-298
    • /
    • 2003
  • Recently, Design-build project as delivery system public construction sector tends to be increased according to the Masterplan for promotion of construction technologies, and construction projects are increasing their complexity, variety and scale. And owner's requirements become various. Preliminary design for design eligibility judging of design-build has been designed excessively to get a good point and this tendency includes the elements which is capable of wasting the budget. Because of excessive design, owners require to apply VE study into the design development phase but in the Design-build system, VE application has not been of no effect that owners expect, owing to the characters of lum-sum contracts. The purpose of this study is to propose the plan for effective application of VE in the design development phase in order to solve the problems such as excessive design of preliminary design in the design-build project. This study established plans for VE application through investigating and analyzing VE application case and then proposed the applications in the aspect of regulations and contracts, parties participated in project, VE operation through research for verification of usefulness.

  • PDF

A study on the value improving of electrical design by VE case analysis (설계VE(Value Engineering)사례 분석을 통한 전기설계 가치향상 방안)

  • Yu, Jae-Jin;Kim, In-Su;Chae, Ji-Seok;Chang, Jeong-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2015.07a
    • /
    • pp.1467-1468
    • /
    • 2015
  • 과거 높은 수익 창출을 통하여 지속적인 상승세를 이어왔던 국내 건설 산업은 계속되는 경기불황으로 건설침체가 가속화 되고, 이로 인해 공공기관 건설공사의 발주물량이 점차 감소되고 있는 실정이다. 건설업은 이제 성장기를 지나 포화기, 더 나아가서는 침체기에 접어들었다는 전문가들의 의견도 나오고 있다. 이러한 상황을 타개하고자 발주기관에서는 예산절감과 품질향상을 도모하기 위해 가치공학 즉, VE(Value Engineering)를 활용하여 예산을 절감하면서 고품질의 건설 목적물을 완성하고 VE를 가치창출을 위한 주요한 도구로 활용하고 있다. 본 논문에서는 특히 가치공학이 전기설계 부문에 있어서 적용된 사례를 분석하고 가치향상 방안에 대하여 고찰하고자 한다.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

The Influence Analysis of Value Engineering for the Public Empoyer's Decision Marking - Focused on the Project Life Cycle - (공공발주자 의사결정에 미치는 가치공학(VE)의 영향력 분석 - 프로젝트 생애주기를 중심으로 -)

  • Park, Jongsoon;Chun, Jaeyoul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.2
    • /
    • pp.12-20
    • /
    • 2015
  • The public employers are faced the mounting importance of decision process to settle the optimum VE delivery system of such public facilities buildings and etc. The elements of decision process of the public employer are formed in the various relationships of the concerned and when the projects are coming into effect, the decision process in the VE delivery method and the selection of contractor will be the name of the game. The decision process in the VE delivery method and the selection of contractor are created a case to be one and the same as well as initiates a consistency for the performance. However, the function and role of the public employer are projective accordingly to the organization of employer and the employer especially no system is equal to the capability of perfect evaluation and verification of the ability of the employer. Especially the lowest bidder policy that started with justification to increase the competitiveness and technical capability of the contractors through the completion in between contractors has been providing the hotbed for insolvency, irregularity and irrationality as a result. From this point of view it is declared that the buildup the edifice of supporting system in the process of decision to recover the mutual trust and respect of the concerned in the VE delivery system with the technostress and the systematization based on drawing the elements which affect the decision process of public employer.

Evaluation of Best Value for Safety Facilities on Highway Using Risk-based VE Approach - A Case Study of Median Barrier - (위험도기반 가치공학적 기법을 적용한 고속도로 교통안전시설 최고가치평가 : 중앙분리대 적용사레를 중심으로)

  • Ji, Dong-Han;O, Young-Tae;Choi, Hyun-Ho;Kim, Sung-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.143-154
    • /
    • 2008
  • Since the concerns for safety of highway traffic safety facilities inherent in various environmental risk is increased, systematic performance, cost, and effect analysis process is needed for this. In case of median barrier among various traffic safety facilities, quantitative risk assessment is inevitable because it has lots of direct/indirect risk factors. Thus, this study suggests an advanced VE(Value Engineering) approach incorporating quantitative risk analysis. For the applicability, suggested VE approach considering alternative 1(140cm) and 2(127cm) is applied to median barrier in fields. Also, major improvement objects are extracted from governing factors of cost and performance based on functional analysis. It is concluded that the proposed risk assessment methodology will provide rational and practical solutions for best value and the approach could effectively applied for various traffic safety facilities by slight modification of suggest process.

The Case Study on Performance Measurement Weighting for Efficient Value Engineering Study of Sewage Treatment Facliity (하수처리시설의 효율적인 VE수행을 위한 다단계성능평가 분석)

  • Kim, Dongjin;Park, Jaeil;Lee, Jaehun;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.40-47
    • /
    • 2016
  • Recently, the demand of sewage treatment facilities have increased by growing the population growth of city and industrialization. However, most of public sewage treatment facilities lack the preparations of design criteria by increasing sewage water amount in the future. In order to respond to this situation, the government has consistently promoted the sewage treatment construction project. This study conducted a survey targeting residents and sewage treatment facilities, civil engineering a VE project professionals for effectively operating the sewage treatment facilities and improving its value to be built in the future. Based on this survey, this study will introduce the list of performance measurements which can not only save cost but also reflect opinion of users and residents. In addition, using Multi-Level Performance Measurement and AHP analyzed the weights of performance measurement which is more objective than existing things for applying efficient VE process

A Case Study on Developing the Virtual Safety Training System (가상안전 체험관 구축 사례)

  • 기재석
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2001.11a
    • /
    • pp.203-210
    • /
    • 2001
  • In the real environment, it is very limited for the trainees to participate the effective training using actual training equipments by themselves and also to simulate several hazard situations for safety because of the direct exposure to the hazards of the actual system. But the virtual environment(VE) can help the trainees to get the effective training participating by themselves and to simulate all kind of possible situation without the exposure to the hazards of the actual system. In this paper, the nor· developed VE system for safety training is introduced. The system is more effective and economic one than the other system developed in Japan.

  • PDF

A Case Study on Developing the Virtual Safety Training System (가상안전 체험관 구축 사례)

  • 기재석
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.4
    • /
    • pp.35-44
    • /
    • 2001
  • In the real environment, it is very limited for the trainees to participate the effective training using actual training equipments by themselves and also to simulate several hazard situations for safety because of the direct exposure to the hazards of the actual system. But the virtual environment(VE) can help the trainees to get the effective training participating by themselves and to simulate all kind of possible situation without the exposure to the hazards of the actual system. In this paper, the new developed VE system for safety training is introduced. The system is more effective and economic one than the other system developed in Japan.

  • PDF

A case study on the selection process of cutoff wall for ground-water using VE/LCC analysis (VE/LCC 기법을 활용한 차수공법 선정사례 연구)

  • Cho Yong-Wan;Chang Jun-Ho;Kim Jin-Man;Ha Jae-In
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.279-291
    • /
    • 2006
  • This study shows decision-making process for selection of cutoff wall on a wastewater treatment project. There are 10 different cut-off wall methods So, we examine the site to gather information for find appropriate methods. After using that information, 10 cutoff wall methods are reviewed for analysis. Through brainstorming, four alternatives are selected for design VE item. Following the standard VE process, we established performance criteria and evaluated function score(F) using questionnaire. The questionnaires, brainstorming and AHP method for weighting on performance criteria and evaluate function score increased the reliability of this selection process. Water Jet method, one of four methods, has the best function score(F=92.71) and the lease construction cost(as cost index 1,000). The value score also highest as 92.7, so we select the method. The result is value innovation type In addition, the authors try to calculate the environmental burden in selection process using LCA. We cannot conduct the full LCA as defined ISO, so perform Simple LCA In LCA result, the cut-off grouting has the least environmental burden as index 9.09E+01 and Water Jet method has following as the second. To selection best method to specific area and purpose, design VE/LCG process used as useful tool and it is needed to develop integrated method that evaluate VEILCC and LCA as one-set process.

  • PDF

A Conceptual Model of Web-based VE Cost Model Analysis System (웹 기반 VE Cost모델 분석 시스템의 개념적 모형)

  • Lee, Chang-Hong;Oh, Chi-Don;Park, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.416-419
    • /
    • 2007
  • In the case of domestic, related information of expenses in order to draw up cost model at the early stage haven't been stored systematically; moreover, similar projects which were accomplished in the past time have lacked data about actual results connected itself. Accordingly, a reliable object hasn't been selected because validity of cost comparing a main function is difficult to dearly decide. Consequently, This study Cost model who can procures and shares and utilizes, studies that is achieved past Cost information of similarity project and achieves in phase zero for target choice of VE activity to systematic and efficient analysis wishes to present conceptional pattern of available Web-Based VE 'Cost model analysis system (Cost Model Analysis System: CMAS)'.

  • PDF