VE of the scripture season enterprises and it respected LCC analyzes from the research which it sees and to use AHP techniques and definite LCC techniques and probabilistic LCC techniques selects the optimum route the case study which it executed. It presented the quality rating model in about the resultant most route lascivious at the time of VE evaluation, in order to select the alternative of optimum AHP techniques which are one in decision-making technique and an evaluation item by weight and a grade it applied the mountaintop it did. Also the definite LCC analyzer law departments of existing together it applied the probabilistic LCC techniques which use Monte Carlo Simulation in about analytical prices and reliability height boil. The economical efficiency was excellent with VE/LCC analytical resultant route and facility size abridgment, the rivers most it will be able to minimize an environmental effect with short distance traverse, the selection this hit preparation LCC which separates from the land use side decreased, the value (V) above 22.0% with the fact that it improves. And, the reliability of the probabilistic LCC analytical resultant analytical results in compliance with Monte Carlo Simulation with 90.3% was very analyzed with the fact that it is a high level.
Primary cardiac lipoma is an extremely rare condition. We reports a case of primary lipoma located mainly in the right atrium of the heart in a 58-year-old male patient. The initial presenting symptoms were dyspnea followed by rapidly progress!ve congestive heart failure. Echocardiogram revealed huge mass on right atrium with stalk arising from septum. Under cardiopulmonary bypass the mass was removed and revealed characteristic findings of lipoma on microscope. The patient was recovered without any problem. We would like to describe this case of rare tumor with the review of literatures.
양산 부산대학교병원 건립공사는 종합병원 의료타운 신축 프로젝트이다. 계획단계부터 건설사업관리자(CMr)가 참가하여 설계 시공일괄사업자를 선정한 후, 실시설계 진행과정을 거쳐 시공단계, 시공이후단계에 이르기까지 프로젝트의 모든 단계에 건설사업관리(CM) 업무를 일관적으로 적용한 사례이다. 또한 설계와 시공의 추진에 Fast Track을 도입하여 공기단축에 성공한 것에 그 의미를 찾을 수 있다. 본 사례는 설계 이전단계에 설계시공일관업체를 선정하였으며, Fast Track수법의 적용을 염두에 둔 설계 및 공사일정계획, 설계단계의 설계관리, Fast Track에 입각한 단계별 공사발주 및 계약관리, 기본설계 실시설계단계의 VE 수행, 시공단계에서의 설계변경 관리, 시공 후 유지관리 단계의 운용관리 등 건설사업관리 업무가 모든 단계에서 다각적으로 제공되었다. 본 보고에서는 상기와 같은 건설사업관리 적용상의 과제와 개선방향, 특히 설계 시공일괄사업에서 효율적으로 CM 업무를 수행할 수 있는 방안을 제시하여, 초대형 턴키(Turnkey) 프로젝트의 CM적용에 기여하고자 한다.
본 논문에서는 가상 환경(VE; Virtual Environment)에서 이동기술을 사용성평가 하기 위한 평가모델을 제안하고 사례연구를 통해 검증하고자 한다. 이를 위한 순서는 첫째, VR상에서 이동기술에 대한 이론적인 접근을 통해 분석하기 위한 요소를 도출한다. 둘째, VR상에서의 이동기술과 사용성 평가에 대한 정의 및 개념을 통해 이론적으로 정립하여 문헌조사를 통해 VE에 대한 이론적인 접근을 통해 분석하기 위한 요소를 도출한다. 셋째, 이를 바탕으로 VE에서의 이동기술을 평가하기 위한 사용성 평가 모델을 제안한다. 마지막으로, 문헌조사에서 도출한 세 가지 이동기술을 적용한 기존의 VR 게임을 실험 및 분석하여 결과를 도출한다. 본 논문을 통해 VR상에서의 이동기술은 각각의 방법을 별도로 사용하는 것이 아니라 사용성 평가를 통해 접근 및 분석하면 VR 게임 콘텐츠 성격에 부합하는 이동기술을 제안할 수 있다는 것을 알 수 있었다. 본 논문은 VR 콘텐츠의 제작 단계에서 이동기술의 문제점을 도출할 수 있고 기준을 제안할 수 있는 유의미한 자료라 사료된다.
With the paradigm shifting from the principal of manufacturing efficiency to business globalism and rapid adaptation to its environments, more and more enterprises are being virtually organized as manufacturing network of different units in web. The formation of these enterprise called as Virtual Enterprise(VE) is becoming a growing trend as enterprises concentrating on core competence and economic benefit. 13us paper proposes multi-agent based task assignment system for VE, which attempts to address the selection of individually managed partners and the task assignment to them A case example is presented to illustrate how the proposed system can assign the task to partners.
Though the physical environment of life through technological evolution has rapidly improved, the quality of life due to a variety of undesirable environmental issues has been seriously damaging. This study has tried to suggest the positive & sustainable direction of space design which can contribute to improving the quality of human lives by reviving 'place property' which a site itself has, trying to analyze the recycling space which the sustainability has been applied to in a true sense. For this cause, we've tried to draw four 'methods of realizing place property' such as meeting a site, understanding a site, finding the identity of a site, and adding novelty to a site through advanced research. I've tried to suggest the design direction for reviving space which can relieve the artificial aspect of design with pursuing the co-existence with nature on the foundation of realizing 'place property' through case analysis selected on the basis of this, and can express the 'sustainability' through environment-friendly space structures & high efficiency of its function.
We have put considerable time and work to find a proper solution to restore the damaged natural environment due to Dam construction, and to restore the field around Dam on the basis of Environmentally Sound Sustainable Development(E.S.S.D). We've replaced the site which had been used as a equipment space with the natural-oriented park, have made a wildlife corridor for those animals which have been living in the area in a newly constructed road to in an out, and have introduced a streamside plant to organize green-space. We've received incredible favor from visitors and residents for the environment restoration. The natural-oriented park plays a role of giving the citizens to the pleasure and the comfort.
The function-cost matrix table is not constant, but can be changed by many factors including equipment capacity, level of production technique, fluctuation of production volume, and the continuous development of products. Such changes would give the VE analysists additional work burden. By using computer. in this study, much of the time and effort of the function evaluation could be saved, and the efficiency of the analysis could also be enhanced. The application of the function evaluation data of R Company, as a case analysis, to the function evaluation computer program developed in this study resulted in the faster management of function-cost matrix table and function evaluation.
최근 지방자치단체에서 공공공사 발주시 그동안 진행된 CM의 가시적 ${\cdot}$ 긍정적 효과로 인하여 CM용역의 발주가 점차 늘어나고 있는 추세이며, 기획업무를 제외한 사업 추진 전 단계에 걸친 형태의 CM업무가 수행되고 있어 CM이 정착되어 가고 있다고 볼 수 있다. 또한, CM의 발전을 위해서는 기획단계부터의 CM 적용, 현실적인 CM 대가산정 기준 정비, 사업참여주체들의 인식전환, CM 자격 인증화를 동한 전문화 유도 등에 대한 제도적 방안이 마련되어야 한다. 그러나, 사업 추진 단계별 CM 업무 수행 상 예상치 못한 현실적인 문제점들이 도출되고 있으며 이에 대한 대책이 요구되고 있다. 본 연구에서는 수성문화예술회관의 CM적용 사례를 요약하여 설계관리, 설계 VE 수행, 발주자의 요구에 의한 추가 업무 수행 및 공정관리를 통한 공기단축 등에 대한 실무적용상의 문제점과 이에 대한 각각의 개선방안을 제시하여, CM제도의 성공적 정착 및 발전을 위한 방향을 제시하였다.
BTL 사업은 공공시설물에서 민간의 자본과 기술력을 통해 높은 성과를 낼 것으로 기대되고 있지만, VE의 최적 설계안을 선정하고 건물의 유지관리 비용 예측에 사용되는 LCC 분석은 다수의 복잡한 문제점을 가지고 있어 제한적으로 적용되고 있다. 본 연구의 목적은 국내의 BTL 사업에서 LCC 분석의 문제점을 분석하고 그 해결방안을 제안하는 것이다. 이를 위해 BTL 사업에서 주요 사업대상인 교육시설을 중심으로 LCC 분석을 두 가지 수준(대안선정 LCC와 건축 LCC)으로 구분하고, 이들의 주요 특징을 고찰하였다. 그리고 6가지 측면(비용분류체계, 수선정보, 생애주기, 비용의 시간적 가치, 수선정보 데이터베이스, LCC 분석모델)에서 사례연구를 통해 4가지 주요 문제점과 해결방안을 도출하였다. 이 연구의 결과는 민간과 공공분야 참여주체들의 중장기적인 계획과 실행에 의해 해결될 수 있을 것이다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.