A Study on the Improvement for Design VE Job Plan through the Benchmarking (벤치마킹을 통한 설계VE 추진절차 개선에 관한 연구)

  • Um Ik-Jun;Jung Young-Il;Kim Chul-Woong;Hyun Chang-Teak
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.88-95
    • /
    • 2001
  • To convert the construction industry from 'the high cost, the low efficiency' to 'the low cost, the high efficiency and value-added industry' and to enhance the performance and quality of products while reducing the cost, the related law and guideline were established and promulgated, which regulate that value engineering workshop during the preliminary design and the detail design stage should be a mandatory process. But VE practitioners are still confusing in choosing the proper value engineering process, because processes those are described in the various references use the different terms, steps and activities, even though they have their own specific characteristics. To resolve these confusions, the existing steps and activities of three kinds of the literature, four kinds of the organization's policy and other four kinds of study examples relating to the design VE were examined. And then, the differences and expecting problems were extracted through the comparison and analysis of those materials. After that, VE specialists' opinion through the questionnaire survey were grasped. Based on those studies the improved design VE Job Plan and activity statements were suggested.

  • PDF

A study on the effective propulsion method of design VE that used TRIZ (TRIZ를 활용한 설계VE의 효율적 추진방안)

  • Oh, Jae-Won;Kim, Kwang-Soo
    • Asia-Pacific Journal of Business Venturing and Entrepreneurship
    • /
    • v.7 no.1
    • /
    • pp.177-187
    • /
    • 2012
  • Design VE is a kind of contradictive administrating that pursue both value improvement and cost reduction, whereas TRIZ is a method used to solve contradiction based on its invention principal. This paper comprehended the problems regarding the object through design VE using function analysis, and presented a number of methods to solve this by using the principal of TRIZ. This study compared the characteristics of Design VE and TRIZ, and suggested a procedure that integrates both Design VE and TRIZ.

  • PDF

Understanding of Nondestructive Testing Technique (건설공사의 Value Engineering Study)

  • 최춘배
    • Journal of the Korean Professional Engineers Association
    • /
    • v.34 no.1
    • /
    • pp.53-58
    • /
    • 2001
  • Value Engineering (VE) is an organized process with an impressive history of improving value and quality. VE can be applied to the construction projects with having good study results. The VE study in construction projects gives identification of opportunities to remove unnecessary costs while assuring quality, performance, reliability, and other factors will meet or exceed the clients needs. VE techniques can save money, reduce time, and improve quality, reliability, maintainability, and performance. VE can also make improving of human factors (altitudes, creativity), and team work. According to the results of VE study in recent USA, 5∼35% reduction in initial costs have been made for the construction projects (ROI ranges : 100∼1000). To have successful work results, if possible, VE study shall be considered at project planning stage or basic design stage later than field work stage with application of VE JOB PLAN, multi-disciplinary approach, and proper techniques in respective study phases (pre-workshop / information gathering / function analysis / creativity / judgement and evaluation / development / presentation and implementation) among the detail techniques in many.

  • PDF

A Study on the Risk Evaluation of Apartment Development Project based on VE (VE기반 공동주택 개발사업 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.14-25
    • /
    • 2009
  • Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.

Considering Performance Measurement and Life-Cycle Costs for Andong Culture & Art Center BTL Project (VE기법을 적용한 안동문화예술회관 민간투자사업의 성능개선 사례연구)

  • Kim, Seong-Il;Lee, Kwang-Mo;Choi, Seok-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1005-1010
    • /
    • 2007
  • According to revision of Construction Technology Management Act (2005), the government ordering construction which cost is more than 10billion won should investigate the value engineering(VE) of a construction. In this sense, the government actively promote plans in 2008 after identifying the examining standards of the investigation on the VE(2007). It is substantial issue to introduce Pre-Qualification(PQ) in oder to restrain unlicensed VE consulting companies or VE consultants. This system will contribute to the quality and the settlement of the value engineering in our country. The reason why the Korea VE Society founded in 2006 is one of the afore-mentioned reasons. Therefore, we try to establish the value engineering of Build-Transfer-Lease Scheme by providing the practical application of construction value engineering and definite procedures through the example of Andong Culture and Art Center's research in one of the various construction fields.

  • PDF

Value Management of Private Finance Initiative Projects (민간투자사업을 위한 VE 적용방안)

  • Lim, Jong-Kwon;Kim, Seoung-Il
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.123-130
    • /
    • 2006
  • Recently, Korean government promotes BTL(Build-Transfer-Lease) for their public construction project to apply private sector's experience and finance initiatives. Many of public buildings and civil infrastructure projects were planned to be delivered by BTL and it helps to continue public projects under tight budget conditions. Since the characteristics of BTL projects, creative ideas for the project function, performance and its LCC (Life Cycle Cost) become more important than usual public work project. This paper introduces the systematic "VE job Plan" application techniques for BTL project and shows the process. This study shows the application of "VE job Plan" for BTL project to help decision making and value improvement. Also, Project cost was estimated by LCC (Life Cycle Cost) analysis. Technical "FAST diagram"was developed and used to find major functions of the project. So, it helps to improve performance of functions and make creative ideas. FAST diagram also help to find relationships between functions and cost. A case study (Daegu Art Gallery BTL Project) was conducted using proposed "VE job Plan. Study demonstrates how value management helps save money and increase functional performance. Researcher found that project can save cost and improve performance of functions significantly by using appropriate VE analysis process at appropriate time.

  • PDF

A Strategy for Developing New Road Projects (경관도로 등 신개념의 도로사업 개발에 관한 연구)

  • Kim, Eung-Cheol
    • International Journal of Highway Engineering
    • /
    • v.9 no.2 s.32
    • /
    • pp.115-127
    • /
    • 2007
  • Developed countries, especially in road construction and management fields, introduce new road porjects such as National Scenic Byways Program(NSBP program) in USA and the Eco-road project in Japan. This study develops a conceptual model for deploying new road projects in Korea. The four step approach is suggested to create new road projects, including foundation of an act based on the existing Road Act, creation of new road project ideas, development of evaluation process and guidelines, and enhancement of an administrative scheme. To create new road projects, three different ways are devised; (1) designation of national roads having uniqueness in overall spectrum, (2) designation of roads having intrinsic values in a different aspect, (3) designation of single structures of engineering outcomes such as bridges, tunnels, new design techniques, considerable Value Engineering output, and well analyzed Life Cycle Cost Analysis practices. For the evaluation process, NSBP program of USA and/or Sustainable City Award program of Korea would be recommended. An administrative scheme and integrated funding process for the new road projects are also suggested based on evaluation of tasks of each team or division of Korea Ministry of Construction and Transportation.

  • PDF

A Study on the Outcome Evaluation Criteria of Executing Negotiation on BTL project -Focused on Cultural Facilities- (BTL사업 협상수행 성과평가 지표에 관한 연구 - 문화시설을 대상으로 -)

  • Lee, Hyun-Chul;Lee, Jae-Hong;GO, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.3-13
    • /
    • 2009
  • When promoting BTL(Build Transfer Lease; below BTL) project, negotiation is a stage of examining observation and reflection of RFP(Request for Proposal below RFP) in terms with facilities, operating and financing. It keeps an important position in whole process. However, there is no consistent guideline or model which helps evaluating the result of negotiation. It is difficult to apprise the quantitative outcome after executing negotiation. Thus, this study presented the Value Engineering -based process and model of estimating the outcome of negotiation for the purpose of estimating and verifying the result of negotiation objectively, Evaluating factors of negotiation were classified into 6 fields, 38 divisions and 135 items, focused on cultural facilities on BTL project. Weight of every factor was estimated, and quantitative checklist was established. This study presented the model which could measure the outcome of negotiation. This result would be a critical checklist before negotiation on BTL project, an index of feedback during negotiation, and also a standard of estimating the outcome after negotiation.

Performance-Oriented Procurement Process and VE/PSC for Private Finance Initiatives (민간투자사업의 성능중심적 발주방식 및 PSC의 활용방안)

  • Lim Jong-Kwon;Park Heung-Min;Jung Kun-Ho;Woo Ji-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.51-58
    • /
    • 2004
  • The input-oriented project promotion system private participation in infrastructure projects currently in use in Korea has encountered difficulties in securing the primary benefits of private sector creativity problem solving and inflow of private capital. As such, the performance (or output)-oriented procurement process implemented in England and other developed countries should be evaluated for introduction. In Korea, private participation projects are currently identified as either solicited or unsolicited projects, each with different promotional procedures, the problem with these procedures is that competition is not pre-activated, the private sectors creativity is under utilized, and the rationality of project evaluations is inconsistent. Korea should, in order to raise the level of private sector creativity and efficiency, go beyond the currently applied Input Specification project promotion system to a Performance-oriented system similar to those implemented in England and other countries. To achieve this, we mate several proposals for the introduction of the performance-oriented system. We divide the main features of our proposals into three categories, including a reformed concessionaire selection system, a performance orientation in preparation of the concession agreement, and a performance orientation in contract management, and discuss each. 1'his study describes performance-oriented promotion systems in an output-focused way As this is an initial study on the introduction of performance orientation in private participation, various key points and proposals were identified. However, in the future, detailed research in technical fields and systems, legal research, and practical projects will be needed for implementation

  • PDF