VE Alternative Verification Method Using KANO Model (카노모델을 활용한 VE대안 검증방법)

  • Liu, Jun-Nan;Qiao, Le;Park, Jin-Young;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.6
    • /
    • pp.923-932
    • /
    • 2019
  • VE is used as a powerful tool to add value to facilities by improving functionality and reducing costs. By identifying the client's requirements in the VE process and reflecting them in the quality model, the developed alternatives meet the client's requirements. However, there is no process to verify how the developed alternatives reflect the needs of the client through functional analysis, idea generation and evaluation. The purpose of this study was to develop, verify, and prove the effectiveness of a methodology for evaluating client satisfaction with alternatives developed during the VE Job Plan. The KANO model, which can identify the satisfaction and dissatisfaction of requirements in product planning, was set as a methodology for alternative verification procedures of VE, and was improved and applied to the purpose of this study. As a result, the alternative evaluation method developed in this study was found to be useful. It is expected that the KANO model will be used to evaluate the satisfaction of VE alternatives in the VE Job Plan analysis.

Standard Establishment Model for Value Engineering Work in Construction Projects (건설 프로젝트 VE업무 기준 수립 모델)

  • Kim, Soo-Yong;In, Chi-Sung;Yang, Jin-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.483-486
    • /
    • 2006
  • The value engineering(VE) in construction projects is systematic method which improve quality as well as reduction input cost and as construction VE work extends the range of application, the importance is rising. For this reason studies are needed to enforce design value engineering work systemically and effectively. In this study, we analyzed the problem of the present construction VE processing and deduced the model to be most suitable the work efficiency. As suggested model reflects systemically requirement item of owner and user, it will make approaching direction and standard establishment possible. So it will increase the following function analysis in analyzing step and the effectiveness of creating idea and make successful VE result.

  • PDF

Project Participants Cooperative Decision Making Model with QFD-based VE Technique (프로젝트 참여자의 협력적 의사결정이 가능한 QFD 기반 VE 모델)

  • Lim, Chulhee;Chun, Jaeyoul;Lee, Jongsik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.3-12
    • /
    • 2019
  • VE analysis is a method to secure definite functions and performance by defining user's various requirements clearly and propose alternatives to reduce cost. However, the present domestic VE project has difficulty in defining design function analysis clearly due to time constraints as well as difficulty in effective and efficient communication between project stakeholder. Domestic results of VE were largely focused on reducing cost while maintaining the functions of the existing facility. Therefore, this study aims to secure the optimal functions for users according to the original intent of user requirements through QFD-VE model which project VE participants can make collective and cooperative decision making. QFD-VE is a technique that first, it can make collaborative decision making in defining and modifying of design function and setting the importance of requirement function. Second, it allow project VE participants to check design interference and conflict between neighbor systems. This study also provided a mathematical model for implementing the computer system using QFD-VE in the future.

A Systematization Model of the Design Phase VE Selection by the Analysis of the Required Items in the Apartment (공동주택 설계VE의 요구항목 분석을 통한 대상선정 체계화 모델)

  • Jung, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.1015-1018
    • /
    • 2007
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

  • PDF

The Conceptual Model of Web-Based Information System for Value Engineering(WISE) in Construction Projects (건설사업 웹 기반 VE 정보시스템의 개념 모델)

  • Lee Jae-ho;Park Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.3 s.25
    • /
    • pp.167-177
    • /
    • 2005
  • Value Engineering(VE) Workshop executes many tasks with VE team members from various experts of construction field on the basis of VE Job Plan for a short period of time. However, the VE team members are not useful with using VE information until now because it is not systematic in the accumulation and application of VE information. Especially, these problems constitute the obstacles to communication, reliability and quickness of VE information. It also causes an increase of time and cost at VE Workshop. Therefore, the results of this study suggests the conceptual model of Web-Based Information System for VE(WISE) in order to improve the effectiveness of VE Workshop and solve the problem as is stated above.

Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility (건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립)

  • Kim, Myung-Jin;Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.903-913
    • /
    • 2016
  • Paris Agreement of Climate Change seem affect to Korea eco-policy. Meanwhile the eco-design for reduce carbon emission have been applied in design phase of construction. However eco-design have applied passively except the project of eco-building system. For reflect eco-component in design, design VE that be appling to basic design and executing design phase of all construction project of over 10 billion should be use. But present applying VE Job Plan is reflecting partly eco-component, so the effect is small. Therefor new eco-VE development that reflect eco-elements to exist VE need. As the result of this study, the concept of environmental cost is defined to accounting. The calculation of the cost was using methods that apply $CO_2$ emission trading price, WTP, carbon productivity concept and carbon tax based on $CO_2$ emission. However, in order to apply eco-friendly VE at design phase, the model of new concept included carbon productivity concept is necessary. The eco-friendly VE model of new concept is model using $CO_2$ emission and potential environmental pollution index (PEPI). This study tried define eco-value model and environmental cost definition that become the major axle of eco-VE.

Consecutive Design VE Process Emphasized on Follow-up Activities (Follow-up 활동을 강조한 연속적 설계VE 프로세스)

  • Yang, Jin Kook;Moon, Sung Woo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.2D
    • /
    • pp.235-244
    • /
    • 2009
  • Design Value Engineering (VE) has become an import part of the daily design process since it has been introduced in the construction industry. Design VE is usually conducted in the general and execution design stages respectively. In order to increase the effectiveness of the VE process, the outcome from the general design VE activities should be integrated into execution design. The outcome from the execution design should be used again for construction. In this study, a consecutive VE process model has been presented as a way to improve the current practice of design VE activities in the construction industry. In the presented model, follow-up activities are emphasized to increase values from the life-cycle perspective of a construction project. The model was tested in a case study of an actual design VE process. The result of the study demonstrates that the model can: 1) effectively incorporate owners requirements; 2) assist decision making in selecting better construction; 3) increase the interface between general and execution design stages; and 4) trace the value flow more efficiently. Overall, the study results indicates that a the consecutive VE process model can be effectively applied when construction project are contracted for the life-cycle management of construction projects.

VE/LCC Analysis Models of Breakwaters by Fuzzy Reliability Approach (퍼지 신뢰성 이론에 의한 방파제의 VE/LCC 분석모델)

  • Ahn, Jong-Pil;Park, Ju-Won;Yu, Deog-Chan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.159-167
    • /
    • 2007
  • In this study, the concepts of integrated VE analysis assessment is introduced in order to achieve "Design for Deterioration performance" in design VE phase. For this purpose, a framework for fuzzy reliability based LCC and value analysis model using fuzzy logic based approach for breakwaters Projects is suggested. It is anticipated that the methodology Proposed in this paper can also be utilized in the design and maintenance phase of other facilities where decision making is made for the fuzzy reliability based life cycle cost and value analysis.

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase (공동주택의 설계VE단계에서 주체별 요구항목 분석을 통한 대상선정 개선방안)

  • Jeong, Ho-Geun;Yang, Jin-Kook;Lee, Sang-Beom
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.111-119
    • /
    • 2008
  • VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.

Potential Value Improvement Target Choice Methodology (PVTCM) in Construction Projects (건설 프로젝트의 잠재적 가치개선 대상 선정 방법론(PVTCM))

  • Yang, Jinkook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.11-19
    • /
    • 2014
  • Construction VE activities has occupies an important position as a key tool of the project in terms of budget and performance improvements. Reflecting this situation, VE application scope is being expanded than before. Thus, construction projects are required the continued research and development for effective use of construction VE. VE target choice method is the central part in the construction VE work. But, this has a problem with low utilization in practical terms. Accordingly, this study was developed the new methodology(PVTCM) for VE target selection of the construction VE work. Its contents are as follows: First, to analyze practical problem for VE target choice method through VE practical data. Second, to extract the high potential VE object based on the cost model and ideas similarity by excellent VE cases analysis. Third, to implement standardized VE object item by using affinity diagram for each construction type items. This research were conducted to experts interviews for comparison analysis with the cost model as one of a representative target selection method. As a result, proposed method were implemented significantly higher performance in terms of practical effectiveness than conventional method.