Browse > Article

Improved Method for VE Items Selection by Analysing the Required Items of Stakeholder on the Apartment in Design Phase  

Jeong, Ho-Geun ((주)ITM 코퍼레이션 CM사업본부)
Yang, Jin-Kook ((주)거성ENG건축사사무소 감리CM본부)
Lee, Sang-Beom (동의대학교 건축공학과)
Publication Information
Korean Journal of Construction Engineering and Management / v.9, no.4, 2008 , pp. 111-119 More about this Journal
Abstract
VE is one of the most effective and systematic tool available to achieve the required function at minimum cost and manage in many industrial fields. The purpose of the preparation phase VE job plan is to establish a cooperation system referring to groups for the successful implementation of VE, and to achieve a common objective to collect sufficient materials required in the analysis phase. The Quality Model is used to measure the requirement of shareholders(users and owners)in the project. It also offers a guideline on decision making when executing the function definition, function arrangement, function evaluation, and the idea evaluation of VE. However, the current the preparation phase business confirms that the required items of owners and users has not suggested definite goals and directions. This study analyzes the problems of current work in the preparation phase from case study, survey and interviews of experts. It then proposes a new process after understanding the required items of owners, users and experts.
Keywords
Design Phase VE; Quality Model; Required Items of Stakeholder; AHP;
Citations & Related Records
연도 인용수 순위
  • Reference
1 신찬호(2007). 설계VE에서 아이디어 및 최적대안 선정방법 개선, 부경대학교 석사학위논문, pp. 8-11
2 한국건설기술연구원(2000). 건설사업 VE기술 도입방안, 건설교통부
3 가치누리연구실(2006). 가치공학(Value Engineering), pp. 25-27
4 이상범 외(2005). 'VE대상선정을 위한 평가항목의 가중치 결정방법에 관한 연구', 한국건축시공학회
5 건설교통부(2006). 설계VE 업무메뉴얼 & 공공건설사업 VE 적용 사례집, pp. 01
6 Arratia, B.a(1998). 'A FAST-Driven approach to new production planning', SAVE International Annual Conference Proceedings
7 Alphonse, DellIsola(1999). Value Engineering : Practice Applications for Design, Construction, Maintenance & Operations. Roberts Means Co, pp.55-56
8 전재열(2003). 건축'설계초기단계에서 VE대상선정방법 개선방안에 관한 연구', 대한건축학회
9 황재우(2007). 설계시공일괄입찰공사에서 설계변경 클레임 요인의 분석에 관한 연구, 동의대학교 석사학위논문, pp. 55
10 양진국.김수용(2005). '품질기능전개(QFD)기법을 적용한 건설프로젝트 설계VE 준비단계 업무 개선 및 체계화', 한국건설관리학회논문집, pp. 123-124