• 제목/요약/키워드: Using Facility

검색결과 4,143건 처리시간 0.031초

u-기반 시설물 관리 시스템 설계 및 구현 (Design and Implementation of facility Management System based Ubiquitous)

  • 김정재;박찬길
    • 디지털산업정보학회논문지
    • /
    • 제4권4호
    • /
    • pp.1-8
    • /
    • 2008
  • The USN is important in technique, unmanned observation using wireless network camera, detection technique that use intrusion detection sensor. But these encrypted data transmission and processing technique through sensor network, method of the staff's location recognition and arrangement aren't serviced still as a integrated system in facility security industry. This paper proposed that improve facility management, the staff present recognition and system efficiency using RFID, USN and wireless camera.

저장능력이 무한대인 장소입지문제에 벤더즈 분해기법과 GAMS의 적용 (Solution method of the uncapacitated facility location problem using GAMS and Benders' decomposition approach)

  • 이상진
    • 경영과학
    • /
    • 제12권2호
    • /
    • pp.63-75
    • /
    • 1995
  • The uncapacitated facility location problem considered here is to determine facility location sites, minimizing the total cost of establishing facilities and serving customer demand points which require primary and back-up services. To solve this problem effectively, we propose two things in this study. First, we propose an idea of Benders' decomposition approach as a solution method of the problem. Second, we implement the problem on GAMS. Using GAMS (general Algebraic Modeling System) can utilize an mixed-integer programming solver such as ZOOM/XMP and provide a completely general automated implementation with a proposed solution method.

  • PDF

부패상품 임시물류센터에 대한 위치 문제 개선 (Improvement for Facility Location Problem of Perishable Commodities)

  • 이상운
    • 한국인터넷방송통신학회논문지
    • /
    • 제18권3호
    • /
    • pp.209-214
    • /
    • 2018
  • 본 논문은 부패상품의 수송시간 제약조건 $L^*$이내로 총 수송비용을 최소화시키는 물류센터 위치를 결정하는 문제의 단순한 알고리즘을 제안하였다. 이 문제에 대해 Lee[4]는 후보 물류센터 위치를 선정하고, 각 물류센터의 총 수송비용을 구한 후, 상위 2개 물류센터에 대해 최적의 위치로 이동시키는 복잡한 방법을 제안하였다. 반면에 본 논문에서는 서브트리 개념을 도입하여 $L^*$ 이내가 되는 후보 물류센터의 위치를 간단히 결정하고, 근방 개념을 도입하여 요구량이 집중화된 지역 상위 2개 지역에 대해 총 수송비용이 최소화되는 지점을 단순히 최적의 위치로 결정하였다.

차세대 반도체 펩을 위한 육각형 물류 구조의 설계 (Hexagonal Material Flow Pattern for Next Generation Semiconductor Fabrication)

  • 정재우;서정대
    • 대한산업공학회지
    • /
    • 제36권1호
    • /
    • pp.42-51
    • /
    • 2010
  • The semiconductor industry is highly capital and technology intensive. Technology advancement on circuit design and process improvement requires chip makers continuously to invest a new fabrication facility that costs more than 3 billion US dollars. Especially major semiconductor companies recently started to discuss 450mm fabrication substituting existing 300mm fabrication of which facilities were initiated to build in 1998. If the plan is consolidated, the yield of 450mm facility would be more than doubled compared to existing 300mm facility. In steps of this important investment, facility layout has been acknowledged as one of the most important factors to be competitive in the market. This research proposes a new concept of semiconductor facility layout using hexagonal floor plan and its compatible material flow pattern. The main objective of this proposal is to improve the productivity of the unified layout that has been popularly used to build existing facilities. In this research, practical characteristics of the semiconductor fabrication are taken into account to develop a new layout alternative based on the analysis of Chung and Tanchoco (2009). The performance of the proposed layout alternative is analyzed using computer simulation and the results show that the new layout alternative outperforms the existing layout alternative, unified layout. However, a few questions on space efficiency to the new alternative were raised in communication with industry practitioners. These questions are left for a future study.

모바일 GIS를 활용한 도로시설물 DB구축의 효율성 향상 (The Improvement of the Road Facility Database Creation Using a Mobile GIS)

  • 이현직;김현태
    • 대한공간정보학회지
    • /
    • 제11권4호
    • /
    • pp.53-60
    • /
    • 2003
  • GIS는 복잡하고 다양한 시설물의 공간정보를 체계적, 과학적으로 관리하는데 유용하여, 최근에는 정보와 통신기술의 급속한 발전에 힘입어 모바일 GIS로 추세가 확산되고 있다. 그러나, 이러한 모바일 GIS 기술은 각종 시설물의 유지관리에는 도입되고 있으나, 현장성 및 이동성이 요구되는 시설물 DB구축에는 사용이 미흡한 실정이다. 따라서, 본 연구에서는 여러 가지 시설물중 도로시설물을 대상으로, DB구축 작업공정을 분석하여 모바일 GIS를 활용한 개선된 작업공정을 도출하였다. 그리고, 실험을 통해 기존방법 및 개선된 방법에 의한 도로시설물 DB구축 과정을 비교 분석함으로써, 모바일 GIS를 활용하여 도로시설물 DB구축의 효율성을 향상시키고자 하였다.

  • PDF

AN ASSESSMENT SYSTEM OF ECO-FRIENDLINESS OF CONSTRUCTED FACILITY IN THE DESIGN PHASE USING VALUE ENGINEERING

  • Byung-Soo, Kim;Dong-Eun, Lee;Suk-Hyun, Kwon;Min-Kwon, Choe
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1625-1629
    • /
    • 2009
  • The new paradigm called 'Low Carbon Green Growth' involved in reducing greenhouse gas is on the rise as a critical issue worldwide. The essential of Kyoto protocol issued in 1997 is to achieve the sustainable economic growth environments by converting existing production system to eco-friendly one. The protocol imposes the liability to reduce greenhouse gas to the countries joined to it. The paradigm is directly involved in the energy consumption and environmental pollution caused by construction activities. Value Engineering which are mainly applied in the design phase in practice is a measure to improve the value of a constructed facility by analyzing and/or appraising the functions and costs of it. However, an appropriate method which assesses eco-friendliness of constructed facility has not been propose by researchers. This paper proposes a method which assesses the performance involved in eco-friendliness of constructed facility using Value Engineering (VE) in the design phase. The method estimates the environmental cost relative to the amounts of energy consumption and environmental pollution occurred over the entire project life cycle. The database called "Life Cycle Inventory DB", which stores information about the amounts of environmental pollution, is used. The algorithm which retrieves the amounts of environmental pollutions from the DB and converts them into environmental costs is developed. The algorithm is implemented into a system which quantifies the eco-friendliness of constructed facility in the design phase using VE.

  • PDF

수요가 불확실한 경우의 장소입지 결정모형 연구 (A Study of Facility Location Model Under Uncertain Demand)

  • 이상진
    • 경영과학
    • /
    • 제15권1호
    • /
    • pp.33-47
    • /
    • 1998
  • The facility location problem considered here is to determine facility location sites under future's uncertain demand. The objective of this paper is to propose a solution method and algorithm for a two-stage stochastic facility location problem. utilizing the Benders decomposition method. As a two-stage stochastic facility location problem is a large-scale and complex to solve, it is usually attempted to use a mean value problem rather than using a stochastic problem. Thus, the other objective is to study the relative error of objective function values between a stochastic problem and a mean value problem. The simulation result shows that the relative error of objective function values between two problems is relatively small, when a feasibility constraint is added to a facility location model.

  • PDF

시설물 유지관리를 위한 BIM데이터 전달의 문제점 (The problem of using BIM data for facility management)

  • 안효경;이슬기;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.139-140
    • /
    • 2012
  • Facility Management (FM) is a project phase to maintenance and to increase the qualities of product which is planned on the design phase and ensured on the construction phase. In addition, since the approximate time occupied in operation and maintenance phase is the longest from construction project as total approximate cost is about 85% of whole the project, it could be managed and realized primarily. The information of facility is not created on the specific point of project, but it might be created on the whole process of subject project widely. Thus, as the information could not be lost and it can be delivered into computer aided facility management system, it is necessary to manage the facility information. This paper proposed the necessities and the problems of BIM-based data interoperability on the Korean construction projects.

  • PDF

GIS를 이용한 시설물관리시스템 개발에 관한 연구 - 강원대학교를 중심으로- (A Study for Development of Facility Management System Using GIS)

  • 양인태;유영걸;천기선;박재국
    • 산업기술연구
    • /
    • 제23권A호
    • /
    • pp.101-107
    • /
    • 2003
  • In university of Korea, the computerization of facility management is lower level than other management areas such as educational matters, administration, library, computing center, teaching assistance, and teaching methodology. So we need urgently the blueprint for an information-oriented and integrated facility management system. In this research, It is presented and implemented an FMS(Facility Management System) for efficient management of the ground and underground facilities on a campus. This studies is computerized the drawings, protocols, and ledgers. It is used a GIS(Geographic Information System) to get the geographical information of facilities. The data more efficiently could be search and update on this system. The decision making process understanding the present facility condition, and analyzing the condition of location could be performed easily by the GUI(Graphic User Interface) of the system.

  • PDF

Application of The Value Analysis To Redesign Facility Layout

  • Laurent, Eyheraguibel;Jeong, Byung-Ho;Lee, Chan-Gie;Lee, Sang-Young
    • 산업공학
    • /
    • 제10권3호
    • /
    • pp.167-177
    • /
    • 1997
  • This paper deals with an application of process value analysis method for a manufacturing process in order to redesign facility layout in a paper company. We have used the value analysis method which permits an overall and rigorous study of process by a functional approach. Firstly, customer's expectations for the future process are clearly and precisely expressed with specifications of the Functional Extern Analysis. The existing process is analyzed using various tool of the Functional Internal Analysis in the second part. From the results of these analysis, we find out that the main problems of current facility are due to scheduling and facility layout. This paper is devoted to resolve the second problem. We suggest an ideal solution in order to have a reference solution. Nextly, We give realistic choices and the final solution for the facility layout.

  • PDF