• Title/Summary/Keyword: Unit method

Search Result 7,017, Processing Time 0.038 seconds

Thermoeconomics to divided the energetic cost into each working fluid (CGAM problem analysis) (엑서지 단가를 각 작동유체별로 나눈 열경제학 (CGAM 문제해석))

  • Kim, Deok-Bong;Kim, Deok-Jin
    • Proceedings of the KSME Conference
    • /
    • 2000.11b
    • /
    • pp.222-227
    • /
    • 2000
  • At representative thermoeconomic theory to determine the unit cost of multiple products, there are the $\ulcorner$SPECO$\lrcorner$ method of Tsatsaronis's study group and the $\ulcorner$MOPSA$\lrcorner$ method of chung-ang university phase laboratory. Against this theory, we propose new theory called $\ulcorner$Thermoeconomics to divide the exergetic cost into each working fluid$\lrcorner$ in this study. Also, we apply new thermoeconomic theory to CGAM problem (30MW-grade imaginary gas turbine cogeneration power plant) that it is representative power system in thermoeconomics theory, and we fixed to interpreted the unit cost of electricity on the part of gas turbine and the unit cost of steam exergy(enthalpy) on the part of HRSG.

  • PDF

An Innovative Scalp-Dyeing Technique with Gentian Violet Solution During Follicular Unit Extraction for White-Haired Follicular Units

  • Moon, Min Seon;Choi, Jong Pil
    • Archives of Plastic Surgery
    • /
    • v.44 no.2
    • /
    • pp.170-172
    • /
    • 2017
  • There exist some restrictions and difficulties in performing follicular unit extraction (FUE) in white-haired patients, for several reasons. In this paper, we introduce a novel technique for visualizing white hair during the punching procedure and graft preparation in FUE for white-haired patients. In white-haired older male patients, we dyed the surrounding scalp skin purple with a gentian violet solution-stained toothpick. Our method has several advantages: surgeons can easily focus on the center of the follicular unit and rapidly perform punching, they can recognize the condition of the harvested follicular units during FUE, and the hair transplant team can secure a clear view for trimming and loading into the implanter. We suggest that scalp dyeing in difficult FUE procedures, especially in patients with white hair, may be a simple method that provides a good visualization for donor site harvesting and for microdissection.

A design of a floating point unit with 3 stages for a 3D graphics shader engine

  • Lee, Kwang-Yeob
    • Journal of IKEEE
    • /
    • v.11 no.4
    • /
    • pp.358-363
    • /
    • 2007
  • This paper presents a floating point unit(FPU) with 3 stages for a 3D graphics shader engine. It targeted to accelerate 3D graphics in portable device environments. In order to design a balanced architecture for a shader engine, we analyzed shader assembly instructions and estimated the performance of FPU with the method we propose. The proposed unit handles 4-dimensional data through separated two paths that are lead to general operation module and special function module. The proposed FPU is compiled as a form of the cascade FPU with 3 stages to efficiently handle a matrix operation with relatively low hardware overhead. Except some complex instructions that are executed using macro instructions, all instructions complete an operation in a single instruction cycle at 100MHz frequency. A special function module performs all operations in a single clock cycle using the Newton Raphson method with the look-up table.

  • PDF

Regression Model-Based Fault Detection of an Air-Handling Unit (회귀기준식 이용 공조기 부위별 고장검출)

  • 이원용;이봉도
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.12 no.7
    • /
    • pp.688-696
    • /
    • 2000
  • A scheme for fault detection on the subsystem level is presented. The method uses analytical redundancy and consists in generating residuals by comparing each measurement with an estimate computed from the reference models. In this study regression neural network models are used as reference models. The regression neural network is memory-based feed forward network that provides estimates of continuous variables. The simulation result demonstrated that the proposed method can effectively detect faults in an air handling unit(AHU). The results show that the regression models are accurate and reliable estimators of the highly nonlinear and complex AHU.

  • PDF

Optimization of design parameters on the shroud of air conditioner outdoor unit (실외기 shroud 형상 최적 설계)

  • Ryu, Ki-Jung;Ye, Huee-Youl;Lee, Sang-Bong;Lee, Kwan-Soo;Cha, Woo-Ho
    • Proceedings of the SAREK Conference
    • /
    • 2009.06a
    • /
    • pp.453-458
    • /
    • 2009
  • This paper presents a numerical evaluation of the flow rate of air conditioner outdoor unit as function of shroud design parameters. To determine the optimal design parameters, we investigated the flow rate by changing bell mouth height, fan height, fan guide height, fan width. The evaluation of the relative priority of the design parameters was performed to choose three important parameters in order to use a response surface method. The flow rate of the optimum model, compared to that of the base model, was increased by about 6.25%.

  • PDF

Redundancy resolution method of omni-directional mobile manipulator system (전방향 이동 머니퓰레이터 시스템의 여유자유도 최적화 방법)

  • Kwon, Soon-Jae;Jeong, Jae-Ung
    • Journal of Power System Engineering
    • /
    • v.19 no.3
    • /
    • pp.75-80
    • /
    • 2015
  • Typically, robot system configured by articulated robot manipulator with 1 DOF transfer unit is being applied in automotive manufacturing automation process. Especially, 1 DOF transfer unit is necessary to extend workspace of robot manipulator. In this configuration, because transfer unit works only one direction, robot manipulator only works in one side in case of car body painting or sealing automation process. it is necessary three robot manipulator system at least. In this paper, in order to robot manipulator works effectively in car body sealing automation application, we are suggested omni-directional manipulator system and conducted studying on redundancy resolution method to solve manipulability-optimal problem.

A Study on Large Scale Unit Commitment Using Genetic Algorithm (유전 알고리즘을 이용한 대규모의 발전기 기동정지계획에 관한 연구)

  • Kim, H.S.;Mun, K.J.;Hwang, G.H.;Park, J.H.;Jung, J.W.;Kim, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 1997.11a
    • /
    • pp.174-176
    • /
    • 1997
  • This paper proposes a unit commitment scheduling method based on hybrid genetic algorithm(GA). When the systems are scaled up, conventional genetic algorithms suffer from computational time limitations because of the growth of the search space. So greatly reduce the search space of the GA and to efficiently deal with the constraints of the problem, priority list unit ordering scheme are incorporated as the initial solution and the minimum up and down time constraints of the units are included. The violations of other constraints are handled by integrating penalty factors. To show the effectiveness of the proposed method. test results for system of 10 units is compared with results obtained using other methods.

  • PDF

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

A Study on the Unit System of Hybrid System Using the Membrane and Tensegrity (막과 텐세그러티를 이용한 하이브리드 구조물의 단위 구조 제안)

  • Sur, Sam-Yeol;Ko, Kwang-Ung
    • Journal of Korean Association for Spatial Structures
    • /
    • v.5 no.2 s.16
    • /
    • pp.81-87
    • /
    • 2005
  • The Space structures may have large freedom in scale and form. And especially Hybrid structures are received much attention from the view points of their light weight and aesthetics. Hybrid systems are stable structures which are reticulated spatial structures composed of compressive straight members, struts and cables and Membranes. In this paper, The Hybrid Unit System are suggested using the Membrane and Cable elements based on the Tensegrity Unit system. Also, The Hybrid System of double-layered single curvature is presented. We analyze the force density method allowing form-finding for Tensegrity systems. And We analyze the shape analysis by the LARSH which is the program for nonlinear analysis.

  • PDF

Modified Design of Floating Type Photovoltaic Energy Generation System (부유식 태양광 에너지 발전시설의 수정설계)

  • Lee, Young-Geun;Joo, Hyung-Joong;Nam, Jeong-Hun;Yoon, Soon-Jong
    • Journal of the Korean Society for Advanced Composite Structures
    • /
    • v.1 no.4
    • /
    • pp.18-27
    • /
    • 2010
  • We had designed and constructed floating type photovoltaic energy generation system. In this paper, we present the result of investigations pertaining to the development of links between unit modules of the floating type photovoltaic energy generation system. The link system installed between the unit modules is made of pultruded FRP, tire, and polyethilene synthetic fiber rope. The link system is analized by the finite element method. The floating type photovoltaic energy generation system consisted of unit modules connected by link system is installed successfully at sea site. In addition, we present the modified design of the floating type photovoltaic energy generation system based on the proto type system.

  • PDF