• 제목/요약/키워드: Underground power transmission system

검색결과 114건 처리시간 0.032초

방식층 보호장치의 설치에 따른 지중송전케이블 시스 유기전압 해석 (Analysis of Sheath Induced Voltage in Transmission Power Cable Connected with CCPU)

  • 이준성;이종범;김영
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권1호
    • /
    • pp.19-25
    • /
    • 2000
  • This paper describes the sheath induced voltage in underground transmission cable system which will be operated with cable cover protection unit(CCPU). Simulation was carried out to analyze the sheath induced voltage in the real cable system which was installed by 154㎸ CV cable in the case with and without CCPU. The sheath induced voltage will be also analyzed according to the change of grounding method, fault resistance and fault angle. Simulation was performed using EMTP and ATP Draw, the simulation results show whether the CCPU in necessary or not in underground transmission power cable system.

  • PDF

345kV 미금${\sim}$성동변전소간 장거리 지중송전선로 준공 (The first installation of 345kV long-length transmission line between Mikyum and Sungdong substation in Korea)

  • 김영;성정규;고창성;한기종
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 E
    • /
    • pp.1731-1733
    • /
    • 1997
  • The first 150lkV underground transmission line of Korea was installed between Danginri and Yongsan substation in 1974. Since then, the underground transmission lines of about 720 circuit-km had been installed up to 1995. As the national economy has been enlarged and the population of city has been rapidly increased, the demand of an electric power has been very increased. Therefore the first 345kV long-length transmission line of Korea was installed between Mikyum and Sungdong substation on Jan., 1997. This paper describes the design of the 345kV oil-filled cable and its accessories, the design of the system, the methods of installation, field tests, and the future trends of the underground transmission line in Korea.

  • PDF

고온초전도 전력케이블 적용효과 검토 (A Study on the Application Effects of HTS Power Cable)

  • 성기철;조전욱;김해종;권영길;최상봉;류강식;김봉태;유인근
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제2권2호
    • /
    • pp.32-36
    • /
    • 2000
  • In this study, we performed the long-term expansion planning for the conceptual design of HTS power cable in Seoul area. In Korea, underground power cable has been required gradually with increasing demand of electric power transmission density and low loss characteristics in the comparison with a conventional power cables, so we assumed that the HTS power cable is applied between the downtown area and the outskirts of the city for the large power transmission capacity. This paper is to show the effects of HTS power cables in Seoul based on the power system analysis.

  • PDF

Impedance Calculation of an Underground Transmission Cable System Installed with a Sheath Current Reduction Device

  • Jung, Chae-Kyun;Lee, Jong-Beom;Kang, Ji-Won;Wang, Xin Heng;Song, Yong Hua
    • KIEE International Transactions on Power Engineering
    • /
    • 제4A권4호
    • /
    • pp.236-242
    • /
    • 2004
  • Previous research results indicated that the designed current reduction device could effectively reduce the sheath circulating current and that its RDP protection device could shield it against both fault and lightning strokes. In this paper, cable impedance is analyzed using wavelet analysis and distance relay algorithm following the installation of these devices so that the operation of distance relay can be estimated. The test results confirm that in these devices, the fault inception angle and SVL bonding types have no impact on the change of cable impedance. In other words, the conventional distance relay can be used without a new relay setting. Thus we can finally assert that the designed current reduction device and its protection device are effective and can be safely installed on the cable transmission system without disturbance.

지중케이블 선로 임피던스 실측 및 분석 (Measurement and Analysis of Line Impedance in Underground Cables)

  • 하체웅;김정년
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.205-207
    • /
    • 2003
  • The line impedance is important data that is applied in all analysis fields of electric power system like power flow, fault current, stability and relay calculation etc. Usually, impedance can be accurately calculated in case of overhead line. However, in case of power cables or combined transmission lines, impedance can not be accurately calculated because cable systems have the sheath, grounding wires, and earth resistance. Therefore, if there is a fault in cable system, these terms will severely be caused much error to calculation of impedance. Therefore, the line impedance were measured for this study in an actual power system of underground cables, and were analyzed by a generalized circuit analysis program EMTP for comparison with the measured value. These analysis result is considered to become foundation of impedance calculation for underground cable.

  • PDF

지중 송전 케이블 선로임피던스 계산 및 실측 (The line impedance calculation and measurement of the underground transmission cable)

  • 김남열;김정년;허회덕;이수길
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.405-407
    • /
    • 2006
  • The power system analysis based on the accurate impedance of the individual underground cable, which is the inter connected to a large power system, is required. A study on calculation method of impedance allowable current for underground cables. furthermore, various methods of bonding and earthing the sheath have been used for the purpose of eliminating or reducing the sheath losses. the effectes of bonding and earthing must be includied in impedances. therefore, the subject of predicting thermal performance of soil and cable systems has been received increasing attension. for these problems, this paper describes a general formulation of impedance that is based on the effect of crossbonding and earthing of the sheath on the 66kV, 132kV and 220kV underground cable systems. also the work is presented, for calculating the temperature rise of power cable and soil.

  • PDF

지중송전 시스템의 병행지선 설치 방안 연구 (Methodology of Parallel Ground Conductor Installation on Underground Transmission System)

  • 홍동석;박성민;한광현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.470-471
    • /
    • 2008
  • SVL is installed at underground transmission system to protect cables and insulation joint-box from overvoltages caused by lightning, switching, and line-to-ground fault. Domestic underground power system adopts cross bonding type to reduce the induced voltage at sheath, but single-point bonding is required depending the system installation configuration. SVL can be easily broken by overvoltages induced at joint-box because single-point bonding has uneffective system structure to extract fault current. ANSI/IEEE recommends Parallel Ground Continuity Conductor(PGCC) to prevent SVL breakdown. In this paper, EMTP simulation is performed to analyze effects on SVL under PGCC installation when single-line-to-ground fault occurs. The result shows that PGCC and short single-point bonding distance can reduce overvoltages at SVL.

  • PDF

Insulation Design and Reliability Evaluation of ±80kV HVDC XLPE Cables

  • Jung, Chae-Kyun;Park, Hung-Sok;Kang, Ji-Won
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권3호
    • /
    • pp.1002-1008
    • /
    • 2014
  • This paper describes insulation design and its reliability evaluation of ${\pm}80kV$ HVDC XLPE cable. Recently, the construction of HVDC transmission system, which is combined overhead line with underground cable, has been completed. This system is installed with existing 154 kV AC transmission line on the same tower. In this paper, the lightning transient analysis is firstly reviewed for selection of basic impulse insulation level and nominal insulation thickness. Then the electrical performance tests including load cycle test and superimposed impulse test based on CIGRE TB 496 are performed to evaluate the reliability of newly designed HVDC cable. There is no breakdown for ${\pm}80kV$ HVDC XLPE cable during electrical performance test. Finally, this system is installed in Jeju island based on successful electrical performance test (Type test). After installation tests are also successfully completed.

암반 앵커기초로 시공된 송전철탑 구조물의 거동특성에 관한 연구 (Behavior of Electric Transmission Tower with Rock Anchor Foundation)

  • 김경열;홍성연;이대수
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.605-614
    • /
    • 2010
  • In this paper, the initial behavior of transmission tower was analyzed. This tower was firstly constructed by rock anchor foundation in domestic 154 kV transmission line and wireless real-time monitoring system was installed to obtain the measured data for analysis of the structure behavior. For this purpose, 16 strain gauges was installed in anchors of foundation and strain gauges, clinometers, anemoscope and settlement sensors was installed at superstructure. As the results, the main factor which influence the behavior of superstructure is wind velocity, wind direction, rainfall and temperature change. Especially, the uplift load at stub of transmission structure revealed about 35.4 percentages of design load. Hereafter the long term stability will be analyzed.

  • PDF

불평형 요소 변화에 따른 지중 송전선로의 시스순환전류 분석 (Analysis of Sheath Circulating Current in Underground Transmission Power Cables according to Unbalanced Factor)

  • 최수현;김규호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.294-295
    • /
    • 2015
  • Many unbalanced factors of underground transmission power cable, such as burying types and the length difference of the cable between each minor section, etc will cause the impedance unbalance and excessive circulating current between cables. So this paper presents the analysis of sheath circulating current in accordance with the distance between the center conductors and phase arrangement. ground resistance value changes on 154kV transmission system. Based on these simulation results, this paper will contribute to the reduction method of sheath circulation current.

  • PDF