• Title/Summary/Keyword: Underground power cables

Search Result 192, Processing Time 0.031 seconds

Implementation of Power Cable Diagnostic Simulator using VLF (VLF를 활용한 전력케이블 진단 시뮬레이터 구현)

  • Kim, Kuk;Eo, Ik-soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.593-602
    • /
    • 2020
  • Power cables installed in domestic factories or underground can cause accidents depending on the manufacturing process, installation, and environmental conditions during use. When an accident occurs in a power cable, it can cause enormous economic loss and social confusion. Hence, the importance of preventive management of the cable through diagnosis is increasing to prevent it. Therefore, in this paper, a diagnostic sample cable was produced by simulating a part that could be a problem due to the installation, manufacturing defects, or deterioration of cables that can occur in the field. Dielectric loss Tangent (tan 𝛿; TD), and Partial Discharge(PD) tests were performed. Partial discharge and AC (60Hz) withstand voltage equipment using High-Frequency Current Transformer (HFCT) were applied After applying a VLF (Very Low Frequency) power supply with a frequency of 0.1Hz was applied. As a result, B and C phase defect samples at a 2.0U0 voltage through the VLF could measure the internal partial discharge in the A-phase normal sample cable from the noise at a 0.5U0 to 2.0U0 voltage. In addition, the 1.5U0 voltage was measured through the AC (60Hz) withstand voltage equipment of the commercial frequency to verify its effectiveness. Partial discharge in the run-off state was measured at a voltage of 1.0U0, and there was a risk when installing the equipment. AC power equipment showed a difficulty of movement by volume or weight. The diagnostic method, through the VLF of the quadrant state, revealed its safety and effectiveness.

Analysis of Induced Voltage on the Gas Pipeline at the Fault in a Underground Power Cables (지중전력케이블에서 고장발생시 인근 가스배관에 유도되는 전압 해석)

  • Bae J. H.;Kim D. K.;Kim K. J.
    • Journal of the Korean Institute of Gas
    • /
    • v.4 no.3 s.11
    • /
    • pp.26-32
    • /
    • 2000
  • Because of the continuous growth of energy consumption, and also the tendency to site power lines and pipelines along the same routes, the close proximity of high voltage structures and metallic pipelines has become more and more frequent. Moreover, normal steady state and fault currents become higher as electric networks increase in size and power Therefore, there has been and still is a growing concern(safety of people marking contact with pipeline, risk of damage to the pipeline coating, the metal and equipment connected to pipeline, especially cathodic protection system) about possible hazards resulting from the influence of high voltage power system on metallic structures(gas pipeline, oil pipeline and water pipeline etc.). Therefore, we analyze the interference problems when the gas pipeline is buried with power cable in the same submarine tunnel. This paper present the results of the study about interference mechanism, AC corrosion limitation of safety voltage and analysis of induction voltage.

  • PDF

Mechanical and Electrical Performance of 180kV HVDC Submarine Cable System (180kV HVDC 해저케이블 기계적/전기적 특성 평가)

  • Kim, N.Y.;Lee, T.H.;Lee, S.J.;Ji, B.K.;Kim, J.N.;Jeon, S.I.;Yun, H.S.;Joung, S.K.;Kang, C.H.;An, Y.H.
    • Proceedings of the KIEE Conference
    • /
    • 2007.07a
    • /
    • pp.616-618
    • /
    • 2007
  • This paper describes the mechanical and electrical test on HVDC submarine cable, Flexible Repair Joint and termination for 180kV. This HVDC submarine cable was manufactured using LS cable's unique skill and would be applied the HVDC submarine cable system in korea. The performance test consist of mechanical test and electrical test. The tensile bending test and tensile test was done as the mechanical test and Electrical test is DC voltage and Impulse test. The tensile bending test carried out 6 times(double of specified times) for maximum reliability. The DC test voltage is $\pm$400kV/1hr. We estimate the lower limit of DC breakdown voltage is 600kV. The impulse test voltage is $\pm$800kV/10shots. The type of developed cables is the MI type. Its insulation consist of paper tapes impregnated with a high viscosity oil. The development of new HVDC cable is available for HVDC underground or submarine power transmission. The developed HVDC cable, FRJ and termination have passed the mechanical and electrical test successfully and showed excellent performance.

  • PDF

Development of optimal cross-section design methods for bored utility tunnels: case study of overseas typical cross-sections and design criteria (터널식 공동구 최적단면 설계기술 개발: 해외 표준단면 사례 및 설계기준 분석)

  • Park, Kwang-Joon;Yun, Kyoung-Yeol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1073-1090
    • /
    • 2018
  • Since the domestic utility tunnels were built mainly in the development project of the new city, they are all in the form of cut-and-cover box tunnel. But, in the case of overseas construction of utility tunnels for existing urban areas, the bored tunnel types are mainly adopted. It is reasonable to install bored tunnels in a downtown area because it is difficult to block the roads or install bypass roads due to heavy traffic and civil complaints. In order to activate the utility tunnels in bored type, it is necessary to secure optimized cross-sectional design technology considering the optimal supplying capacity and mutual influencing factors (Thermal Interference, electrolytic corrosion, efficiency of the maintenance, etc.) of utilities (power cables, telecommunication cables, water pipes, etc.). The optimal cross-section design method for bored utility tunnels is ultimately to derive the optimal arrangement technique for the utilities. In order to develop the design methods, firstly, the cases of tunnel cross-section (Shield TBM, Conventional Tunneling) in overseas shall be investigated to analyze the characteristics of the installation of utilities in the section and installation of auxiliary facilities, It is necessary to sort out and analyze the criteria related to the inner cross-section design (arrangement) presented in the standards and guidelines.

Analysis of Geological Factors for Risk Assessment in Deep Rock Excavation in South Korea (한국의 대심도 암반 굴착 위험도 산정을 위한 인자 분석)

  • Ihm, Myeong Hyeok;Lee, Hana
    • Tunnel and Underground Space
    • /
    • v.31 no.4
    • /
    • pp.211-220
    • /
    • 2021
  • Tunnel collapse often occurs during deep underground tunneling (> 40 m depth) in South Korea. Natural cavities as well as water supply pipes, sewer pipes, electric power cables, artificial cavities created by subway construction are complexly distributed in the artificial ground in the shallow depths of the urban area. For deep tunnel excavation, it is necessary to understand the properties of the ground which is characterized by porous elements and various geological structures, and their influence on the stability of the ground. This study analyzed geological factors for risk assessment in deep excavation in South Korea based on domestic and overseas case study. As a result, a total of 7 categories and 38 factors were derived. Factors with high weights were fault and fault clay, differential stress, rock type, groundwater and mud inrush, uniaxial compressive strength, cross-sectional area of tunnel, overburden thickness, karst and valley terrain, fold, limestone alternation, fluctuation of groundwater table, tunnel depth, dyke, RQD, joint characteristics, anisotropy, rockburst and so forth.

A Study on the DC Leakage Current Test for Power Cable of Private Electrical Facilities considering Lightning Arrester (피뢰기를 고려한 자가용 전기설비 인입선로의 직류누설전류시험에 관한 연구)

  • Jeong, Ki-Seok;Gil, Hyoung-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.142-147
    • /
    • 2018
  • Private electrical facilities are judged whether it is suitable for the insulation aging condition of their incoming underground cables using DC leakage current test method. In the case where the service point of utility is the secondary side of cut out switch installed in the electric pole, there is a problem that it is difficult to separate the lightning arresters(LA) because of their high position of the pole. Therefore, the field test voltage is applied at value lower than DC 30 kV, which are stated in the inspection guideline. However, this test could reduced the insulation performance of the LA by accelerating the electrical stress of the metal oxide varistor element in the pre-breakdown region. In this study, we analyzed the relationship between the DC test voltage and the leakage current using the non-destructive DC high voltage equipment with leakage current measurement function. The results show that the leakage current increases sharply above the specified test voltage. As a consequence, it could be contributed to improve insulation aging inspection method by selecting the possible test area on the VI characteristic curve of the pre-breakdown area of the LA.

Pulse Waveform Simulation of Partial Discharges for HV XLPE Cable Joints (초고압 XLPE 케이블 접속함의 부분방전 펄스파형 시뮬레이션)

  • Kim, Jeong-Tae
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.75-81
    • /
    • 2018
  • In this study, the simulation of partial discharge pulse waveform have been performed for the typical joints such as EBA and PMJ in the HV underground transmission XLPE cable system in order to improve the understanding of partial discharge pulse waveform and the on-site measurement accuracy of partial discharges. FDTD simulation technique was adopted for the simulation and has been shown to be suitable for partial discharge simulation of power cables in terms of pulse propagation characteristics and waveform formation. The simulation results for the EBA showed that the second not-so-large opposite polarity peak appeared after the first negative polarity peak and the measurement sensitivity was the highest near the bottom of the EBA copper box. In the analysis results for PMJ, the magnitude of the second opposite polarity peak was large enough to compare with the first peak, and the measurement sensitivity at the end of the PMJ copper box was the highest. These simulation results show considerable similarity with the on-site measurement, and it would be very useful for the partial discharge measurement of HV XLPE cable systems.

A Possible diagnostic method of cable system using SI-PD measurement (충격파-부분방전(SI-PD) 시험방법을 이용한 케이블 진단에 관한 기초 연구)

  • Kim, J.T.;Koo, J.Y.;Jang, E.;Cho, Y.O.;Kim, S.J.;Song, I.K.;Kim, J.Y.
    • Proceedings of the KIEE Conference
    • /
    • 1996.07c
    • /
    • pp.1774-1777
    • /
    • 1996
  • In this paper, applicability of SI-PD(switching impulse - partial discharge) testing method was put on an attempt as a newly proposed diagnostic method for the underground distribution power cable system in Korea. For this purpose, SI-PD testing equipment was designed, and tests were performed using artificial needle-type defects integrated into the 22.9 kV CN/CV cables in drder to prove its reliability. As a result, arc noises, generated from spark gap, were considerably decreased by use of a pneumatic switch immersed into oil, and artificial needle-type defects were well detected with impulse voltage level under $2U_0$. These results imply that it is likely possible to apply SI-PD measurement method as a the nondistructive test for the 22.9 kV CN/CV cable system in Korea.

  • PDF

High Efficient Inductive Power Supply System Implemented for On Line Electric Vehicles

  • Huh, Jin;Park, Eun-Ha;Jung, Gu-Ho;Rim, Chun-Taek
    • Proceedings of the KIPE Conference
    • /
    • 2009.11a
    • /
    • pp.105-110
    • /
    • 2009
  • The On Line Electric Vehicles(OLEV) that can pick up inductive power from underground coils on driving with high efficiency have been developed this year, and is now proposed in this paper. The IPS(Inductive Power Supply) system consists of power supply inverters, power supply rails, pick up modules, and a regulator. There are 3 generations of IPS have been developed so far, and the $4^{th}$ generation IPS is being developed. The $1^{st}$ generation has been demonstrated this Feb. 27, which is equipped with mechanically auto tracking pick-up module with 1cm air gap, and showed 80% power efficiency. The $2^{nd}$ generation IPS applied to an 120kW (average)/240kW(peak) motor powered electric bus has 17cm air gap with 72% power efficiency. For the $2^{nd}$ generation IPS, the Power supply inverter has 440V, 3phase input and 200A @ 20kHz output. The test power supply rail of 240m long is segmented by 60m each, where newly developed core structure and power cable are constructed under the road covered with asphalt of 5cm thickness. The pick-up modules which consist of core, winding wire, and rectifiers are fixed to the bottom of the bus which can carry more than 40 passengers and can pick up max. 60kW. To remove parasitic component and to transfer maximum power between them resonant circuit topology is applied to the primary and secondary sides. The EMF level is below 62.5mG at 1.75m from the center of the road to meet the regulation. Several effective ways of reducing EMF levels have been developed. In addition, effective ways to solve problems related high frequency power cables buried in ground and it's proof from soil have been studied also. This development shows that the IPS system is capable of supplying enough power to the pick-up of OLEV and can reduce battery size, weight and cost, which means the IPS with OLEV is one of the best candidate for EV.

  • PDF

A Study on the Indirect Benefits of Undergrounding Overhead Power Line Projects in an Urban Area Using Contingent Valuation Method (조건부가치측정법(CVM)을 이용한 도심지 송전선로 지중화사업의 간접편익 추정)

  • Park, Chan-Ho;Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.6D
    • /
    • pp.871-879
    • /
    • 2008
  • Recently, as there are a rise in the standard of living and higher concerns of an electromagnetic wave and environment, undergrounding the aerial cables which are supported by large pylons and generally considered as the least attractive feature of an urban area is on an increasing trend to improve aesthetic benefits and electric reliability. This study applied Contingent Valuation Method (CVM) which is expected to become an effective tool to measure indirect benefit to estimate the substantial benefits of undergrounding overhead power line projects in an urban area. The tunneling construction project of the 345kV Shinsungnam electric power cable in Seongnam city was selected and a hypothetical scenario was given to respondents to determine their levels of Willingness to Pay (WTP) for undergrounding overhead power lines. The result from the estimation of the WTP of undergrounding overhead power lines in Seongnam city was calculated as approximately 17.1 billion won. Placing existing overhead lines underground is difficult to justify economically. Most undergrounding costs appear to be justified by aesthetic and public policy considerations. Therefore, considering the result of this study, undergrounding overhead power lines is of great benefit to public.