• Title/Summary/Keyword: Underground Power Cable

Search Result 321, Processing Time 0.028 seconds

Performance and Design of Cable Termination for 154kV Class (154kV 케이블 콘넥터의 설계와 특성 평가 연구)

  • Cho, Han-Goo;Kim, Kyang-Young;Lee, Cheol-Ho;Lee, Yong-Sun
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2010.06a
    • /
    • pp.112-112
    • /
    • 2010
  • The purpose of development is to localize a connector for connection of cable and GIS for underground transmission system. The cable connector for GIS provides electrical insulation of GIS housing part and makes connection of ultra high voltage electrical apparatus and power cable by controlling electrical stress between electrodes of power cable termination. Generally Korean switchgear makers are using a connector for GIS made by foreign companies. We manufactured sample by best structure design of great capacity conductor connecting part and then modified the design by analysis of shape and section. We completed the suitable sample for current cycling test condition of conductor connecting part sample and ensured surge characteristics of line by short-time current test.

  • PDF

A fault location algorithm for underground cable by Distributed Parameter Circuit Analysis (분포정수회로 해석을 통한 지중케이블 고장거리 알고리즘 연구)

  • Yang, Xia;Bae, Y.J.;Choi, M.S.;Lee, S.J.;Kang, S.H.
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.171-173
    • /
    • 2003
  • This paper presents a new fault location algorithm for 3 phase underground cable based on distributed parameter circuit analysis, by which we establish the basic equations for each of core and sheath currents and voltages considering cross-bonding sheaths. The proposed algorithm need simulate by EMTP, and then the EMTP data need be compared with the calculation result in Matlab.

  • PDF

A Study on Modeling Methods for Cable Covering Protective Unit on Underground Power Cable Systems (지중송전계통 절연통보호장치 모델링 기법에 관한 연구)

  • Choi, Kyung-Kyu;Jang, Tae-In;Yoon, Hyung-Hee;Jung, Chae-Kyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.12
    • /
    • pp.2098-2102
    • /
    • 2007
  • The conventional CCPU(Cable Covering Protective Unit) modeling methods which are used by Type 99 and Type 92 in EMTP simulation are firstly discussed in this paper, and then some problems of them are also investigated. Modeling method using Type 99 causes unstable characteristic at initial transient of CCPU operation. Time delay has also effect on the output of CCPU modeling. So, in this paper, a new modeling method for CCPU is designed by DBM(Data Base Module) of EMTP. The characteristic of Type 92 is used for the new modeling method. The reliability of this one is proved by comparing simulation with measured data. Specially, at initial transient, the waveform of the new method shows more stable result than that of conventional method using Type 99. Also, the peak value is similar to measured data.

Application of Supervisory System in Extra High Voltage Cable (초고압 케이블의 송전 감시 시스템 소개 및 기술동향)

  • Kwon, Byung-Il;Nam, Jeong-Se;Kang, Deok-Hwan
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1791-1793
    • /
    • 1997
  • Since Korea was initiated a industrialization, many transmission lines have been installed to meet the increasing demand for the electric power. In large city, underground transmission lines were widely installed because of the environmental issue. But there have been appeared many failures on the lines, such as the external scar of cable, a fire in the culvert, overheating of cable, and so on. There have been many studies to monitor them and improve the reliability of the power supply. As a method monitoring the lines, a DTS(Distributed Temperature Sensor) system is developed and applied. This system monitors the lines and predicts the failures, using a optical fiber sensor. This paper describes this DTS system and its application for the underground transmission lines.

  • PDF

A Study on the Optimum Cooling Span of the Underground Power Transmission Cable Equipped by a Forced Cooling System (전력구내 지중케이블 강제냉각에서의 적정냉각구간에 관한 연구)

  • Lee, J.H.;Chung, S.H.;Kim, J.G.;Park, M.H.
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.2 no.1
    • /
    • pp.49-62
    • /
    • 1990
  • The forced cooling system has been widely applied to passing more electric current in the underground power transmission cable technology. In this paper, the optimum cooling span of the in-trough-indirect water cooling method within an electric tunnel was investigated. A parametric study was performed for the cable currents, the coolant flow rates, and the coolant inlet temperatures. As a result, the temperature of the inlet air has been found as the most important parameter in determination of the optimum cooling span.

  • PDF

MV Cable Failure Statistics Analysis and Failure Rate Utilization Method of Prioritization of Diagnosis Targets (지중 배전용케이블 고장통계 분석 및 고장률 활용 진단대상 우선순위 선정방법)

  • Cho, Chong-Eun;Lee, On-You;Kim, Sang-Bong;Kim, Kang-Sik
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.7 no.2
    • /
    • pp.263-268
    • /
    • 2021
  • This paper statistically analyzes the time required for each failure cause and describes a diagnostic method for 159 reports of failure analysis of MV cables that occurred in the distribution system of KEPCO over the past 18 years. In addition, the manufacturer's failure rate compared to 100C-km was calculated using 381 cases of MV cable deterioration failure between 2008 and 2020. It is hoped that this paper will help those in charge of maintaining underground facilities at the business office to use the failure rate to prioritize facility diagnosis.

A Multidiscipline 35 kV Cable Failure Investigation

  • Orton Harry;Furst Gabor;Batho Joe;Rao Avaral;Salvida Candelario de;Morante Moises Gomes
    • KIEE International Transactions on Electrophysics and Applications
    • /
    • v.5C no.2
    • /
    • pp.67-71
    • /
    • 2005
  • Cable failure investigations must evaluate all facets of cable technology to reach a complete understanding of why and how an underground power cable failed. This paper presents the salient points of a recent investigation into an in-service failure after only several weeks of operation.

Analysis and Model Establishment of OF Cable Underneath a Bridge on Underground Power Cable Systems (지중송전계통에서 OF케이블의 교량 첨가시 모델 수립 및 해석)

  • Lee, Hyun-Suk;Lee, Jong-Beom
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.2245-2246
    • /
    • 2008
  • This paper analyses crossbonded cable system underneath a bridge. The simulation is performed under various system configuration such as cable length, iron frame size, lightning surge. The simulation models are established by EMTP/ATPDRraw. In this paper, the crossboneded cable system underneath a bridge is also analyzed for insulation coordination of iron frame and cables.

  • PDF

The first installation of 345kV long-length transmission line between Mikyum and Sungdong substation in Korea (345kV 미금${\sim}$성동변전소간 장거리 지중송전선로 준공)

  • Kim, Y.;Seong, J.K.;Go, C.S.;Han, K.J.
    • Proceedings of the KIEE Conference
    • /
    • 1997.07e
    • /
    • pp.1731-1733
    • /
    • 1997
  • The first 150lkV underground transmission line of Korea was installed between Danginri and Yongsan substation in 1974. Since then, the underground transmission lines of about 720 circuit-km had been installed up to 1995. As the national economy has been enlarged and the population of city has been rapidly increased, the demand of an electric power has been very increased. Therefore the first 345kV long-length transmission line of Korea was installed between Mikyum and Sungdong substation on Jan., 1997. This paper describes the design of the 345kV oil-filled cable and its accessories, the design of the system, the methods of installation, field tests, and the future trends of the underground transmission line in Korea.

  • PDF

Fault Location of Underground Cables Using Travelling Wave (반사파를 이용한 지중케이블의 고장점 탐지연구)

  • Sun, J.H.;Kang, D.S.;Ryoo, H.S.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07c
    • /
    • pp.1972-1974
    • /
    • 2000
  • In this paper, we made an experiment on fault location of underground cables with travelling wave. The 5C2V coaxial cables of 100, 200m length, connected with discharge gap, are used for simplifying model cable lines of power cable. And 100KHz -2MHz CT and HV probe are installed at one side of the ends. We made travelling pulse in discharge gab and then pulse travelled along the cable to the both ends. Therefore, it is detected in CT and HV probe. Measuring the time difference of the pulse start and arrival, we were able to obtain the distance of pulse travelling. Consequently, our experimental results show the possibility to detect fault location of underground cables with travelling wave.

  • PDF