• Title/Summary/Keyword: Two-phase Heuristics

Search Result 8, Processing Time 0.019 seconds

Heuristics for Scheduling Wafer Lots at the Deposition Workstation in a Semiconductor Wafer Fab (반도체 웨이퍼 팹의 흡착공정에서 웨이퍼 로트들의 스케쥴링 알고리듬)

  • Choi, Seong-Woo;Lim, Tae-Kyu;Kim, Yeong-Dae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.36 no.2
    • /
    • pp.125-137
    • /
    • 2010
  • This study focuses on the problem of scheduling wafer lots of several product families in the deposition workstation in a semiconductor wafer fabrication facility. There are multiple identical parallel machines in the deposition workstation, and two types of setups, record-dependent setup and family setup, may be required at the deposition machines. A record-dependent setup is needed to find optimal operational conditions for a wafer lot on a machine, and a family setup is needed between processings of different families. We suggest two-phase heuristic algorithms in which a priority-rule-based scheduling algorithm is used to generate an initial schedule in the first phase and the schedule is improved in the second phase. Results of computational tests on randomly generated test problems show that the suggested algorithms outperform a scheduling method used in a real manufacturing system in terms of the sum of weighted flowtimes of the wafer lots.

A Comparative Study of Two-phase Heuristic Approaches to General Job Shop Scheduling Problem

  • Sun, Ji Ung
    • Industrial Engineering and Management Systems
    • /
    • v.7 no.2
    • /
    • pp.84-92
    • /
    • 2008
  • Scheduling is one of the most important issues in the planning and operation of production systems. This paper investigates a general job shop scheduling problem with reentrant work flows and sequence dependent setup times. The disjunctive graph representation is used to capture the interactions between machines in job shop. Based on this representation, four two-phase heuristic procedures are proposed to obtain near optimal solutions for this problem. The obtained solutions in the first phase are substantially improved by reversing the direction of some critical disjunctive arcs of the graph in the second phase. A comparative study is conducted to examine the performance of these proposed algorithms.

A Geometrical Center based Two-way Search Heuristic Algorithm for Vehicle Routing Problem with Pickups and Deliveries

  • Shin, Kwang-Cheol
    • Journal of Information Processing Systems
    • /
    • v.5 no.4
    • /
    • pp.237-242
    • /
    • 2009
  • The classical vehicle routing problem (VRP) can be extended by including customers who want to send goods to the depot. This type of VRP is called the vehicle routing problem with pickups and deliveries (VRPPD). This study proposes a novel way to solve VRPPD by introducing a two-phase heuristic routing algorithm which consists of a clustering phase and uses the geometrical center of a cluster and route establishment phase by applying a two-way search of each route after applying the TSP algorithm on each route. Experimental results show that the suggested algorithm can generate better initial solutions for more computer-intensive meta-heuristics than other existing methods such as the giant-tour-based partitioning method or the insertion-based method.

An Efficient Two-Phase Heuristic Policy for Acceptance Control in IaaS Cloud Service (IaaS 클라우드 서비스 수락제어를 위한 효율적인 2단계 휴리스틱 정책)

  • Kim, Moon Kyung;Choi, Jin Young
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.38 no.2
    • /
    • pp.91-100
    • /
    • 2015
  • In this study, we propose an efficient two-phase heuristic policy, called an acceptance tolerance control policy, for Infrastructure as a Service (IaaS) cloud services that considers both the service provider and customer in terms of profit and satisfaction, respectively. Each time an IaaS cloud service is requested, this policy determines whether the service is accepted or rejected by calculating the potential for realizing the two performance objectives. Moreover, it uses acceptance tolerance to identify the possibility for error with the chosen decision while compensating for both future fluctuations in customer demand and error possibilities based on past decisions. We conducted a numerical experiment to verify the performance of the proposed policy using several actual IaaS cloud service specifications and comparing it with other heuristics.

Design of intelligent computing networks for a two-phase fluid flow with dusty particles hanging above a stretched cylinder

  • Tayyab Zamir;Farooq Ahmed Shah;Muhammad Shoaib;Atta Ullah
    • Computers and Concrete
    • /
    • v.32 no.4
    • /
    • pp.399-410
    • /
    • 2023
  • This study proposes a novel use of backpropagated Levenberg-Marquardt neural networks based on computational intelligence heuristics to comprehend the examination of hybrid nanoparticles on the flow of dusty liquid via stretched cylinder. A two-phase model is employed in the present work to describe the fluid flow. The use of desulphated nanoparticles of silver and molybdenum suspended in water as base fluid. The mathematical model represented in terms of partial differential equations, Implementing similarity transformationsis model is converted to ordinary differential equations for the analysis . By adjusting the particle mass concentration and curvature parameter, a unique technique is utilized to generate a dataset for the proposed Levenberg-Marquardt neural networks in various nanoparticle circumstances on the flow of dusty liquid via stretched cylinder. The intelligent solver Levenberg-Marquardt neural networks is trained, tested and verified to identify the nanoparticles on the flow of dusty liquid solution for various situations. The Levenberg-Marquardt neural networks approach is applied for the solution of the hybrid nanoparticles on the flow of dusty liquid via stretched cylinder model. It is validated by comparison with the standard solution, regression analysis, histograms, and absolute error analysis. Strong agreement between proposed results and reference solutions as well as accuracy provide an evidence of the framework's validity.

Heuristics for Synchronization of Production and Transportation Planning in the Supply Chain (공급사슬에서 생산 및 물류의 동기화를 위한 발견적 기법)

  • Jeong Jeong-U;Lee Yeong-Hae
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.159-166
    • /
    • 2006
  • The aim of synchronization of production and transportation planning in the supply chain is to increase the flexibility and to decrease various costs. The suggested model in this study synchronizes the timing to supply to a downstream manufacturer directly after production and to be consumed in a downstream manufacturer right after receipt. This model deals with the frequent delivery in small amount which is a new trend of the transportation not governed the economy of scale principle. Moreover, various types of transportation governed by the economy of scale principle or not are considered. Then, the two-phase mathematical model is suggested to obtain optimal job sequence and production quantity for each tasks. But, it is difficult to gain optimal solutions if there is a transportation governed by the economy of scale principle in the supply chain, or the size of the problem is increased. Thus, heuristic algorithms based on simulated annealing and genetic algorithm are suggested to find good solutions in the reasonable time.

  • PDF

A Metaheuristic Approach Towards Enhancement of Network Lifetime in Wireless Sensor Networks

  • J. Samuel Manoharan
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.17 no.4
    • /
    • pp.1276-1295
    • /
    • 2023
  • Sensor networks are now an essential aspect of wireless communication, especially with the introduction of new gadgets and protocols. Their ability to be deployed anywhere, especially where human presence is undesirable, makes them perfect choices for remote observation and control. Despite their vast range of applications from home to hostile territory monitoring, limited battery power remains a limiting factor in their efficacy. To analyze and transmit data, it requires intelligent use of available battery power. Several studies have established effective routing algorithms based on clustering. However, choosing optimal cluster heads and similarity measures for clustering significantly increases computing time and cost. This work proposes and implements a simple two-phase technique of route creation and maintenance to ensure route reliability by employing nature-inspired ant colony optimization followed by the fuzzy decision engine (FDE). Benchmark methods such as PSO, ACO and GWO are compared with the proposed HRCM's performance. The objective has been focused towards establishing the superiority of proposed work amongst existing optimization methods in a standalone configuration. An average of 15% improvement in energy consumption followed by 12% improvement in latency reduction is observed in proposed hybrid model over standalone optimization methods.

A Two-Phase Component Identification Method using Static and Dynamic Relationship between Classes (클래스들 간의 정적ㆍ동적 관계에 의한 2단계 컴포넌트 식별방법)

  • Choi Mi-Sook;Cho Eun-Sook;Park Jai-Nyun;Ha Jong-Sung
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.11 no.1
    • /
    • pp.1-14
    • /
    • 2005
  • It is difficult to identify reusable and independent components in component-based development(CBD) process. Therefore existing methodologies have dealt the problem of component identification based on only developer's intuition and heuristics. As a result, it is difficult to identify the business components by common developers. Therefore, in this paper, we propose a new baseline and technique to identify the business components based on domain model such as use case diagrams, class diagrams, and sequence diagrams. proposed method identifies components through two phases; system component identification and business component identification. Especially, we consider structural characteristics as well as dependency characteristics according to methods call types and directions in identifying components. We also present a case study and comparative analysis and assessment to prove the practical use of our technique.