A Comparative Study of Two-phase Heuristic Approaches to General Job Shop Scheduling Problem  

Sun, Ji Ung (School of Industrial and Managment Engineering Hankuk University of Foreign Studies)
Publication Information
Industrial Engineering and Management Systems / v.7, no.2, 2008 , pp. 84-92 More about this Journal
Abstract
Scheduling is one of the most important issues in the planning and operation of production systems. This paper investigates a general job shop scheduling problem with reentrant work flows and sequence dependent setup times. The disjunctive graph representation is used to capture the interactions between machines in job shop. Based on this representation, four two-phase heuristic procedures are proposed to obtain near optimal solutions for this problem. The obtained solutions in the first phase are substantially improved by reversing the direction of some critical disjunctive arcs of the graph in the second phase. A comparative study is conducted to examine the performance of these proposed algorithms.
Keywords
Two-phase Heuristics; Job Shop Scheduling; Reentrant Work Flows; Sequence Dependent Setup Times;
Citations & Related Records
연도 인용수 순위
  • Reference
1 Balas, E. (1969), Machine sequencing via disjunctive graphs: an implicit enumeration approach, Operations Research, 17, 941-957.   DOI   ScienceOn
2 Kagr, L. L. and Thompson, G. L. (1964), A heuristic approach to the traveling salesman, Management Science, 11, 225-248.
3 Artigues, C. and Roubellat, F. (2002), An efficient algorithm for operation insertion in a multi-resource jobshop schedule with sequence-dependent setup times, Production Planning and Control, 13, 175-186.   DOI   ScienceOn
4 Asano, M. and Ohta, H. (1999), Scheduling with shutdowns and sequence dependent set-up times, International Journal of Production Research, 37, 1661- 1676.   DOI   ScienceOn
5 Uzsoy, R. and Wang, C. S. (2000), Performance of decomposition procedures for job shop scheduling problems with bottleneck machines, International Journal of Production Research, 38, 1271-1286.   DOI   ScienceOn
6 Ovacik, I. M. and Uzsoy, R. (1995), Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times, International Journal of Production Research, 33, 3173-3192   DOI   ScienceOn
7 Radhakrishnan, S. and Ventura, J. A. (2000), Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times, International Journal of Production Research, 38, 2233-2252.   DOI   ScienceOn
8 Blanco, L., Dell'olmo, P., and Giordani, S. (1999), Flow shop no-wait scheduling with sequence dependent set-up times and release dates, INFOR Journal, 37, 3-11.
9 Zhu, X. and Wilhelm, W. (2006), Scheduling and lot sizing with sequence-dependent setup: A literature review. IIE Transactions, 38, 987-1007.   DOI   ScienceOn
10 Chu, C., Proth, J. M., and Wang, C. (1998), Improving job-shop schedules through critical pairwise exchanges, International Journal of Production Research, 36, 683-694.   DOI   ScienceOn
11 Wilbrecht, J. K. and Prescott, E. (1969), The influence of set-up time on job shop performance, Management Science, 16, 274-280.   DOI
12 Gupta, J. N. D. (1986), The two machine sequence dependent flow shop scheduling problem, European Journal of Operations Research, 24, 439-446.   DOI   ScienceOn
13 Sun, X., Noble, J. S., and Klein, C. M. (1999), Singlemachine scheduling with sequence dependent setup to minimize total weighted squared tardiness, IIE Transactions, 31, 113-124.
14 Balas, E., Lenstra, J. K., and Vazacopoulos, E. (1995), The one machine problem with delayed precedence constraints and its use in job shop scheduling, Management Science, 41, 94-109.   DOI   ScienceOn
15 Norman, B. A. (1999), Scheduling flowshops with finite buffers and sequence-dependent setup times, Computers and Industrial Engineering, 36, 163-177.   DOI   ScienceOn
16 Flynn, B. B. (1987), Repetitive lots: the use of a sequence-dependent set-up time scheduling procedure in group technology and traditional shops, Journal of Operations Management, 7, 203-216.   DOI   ScienceOn
17 Gupta, J. N. D. (2002), An excursion in scheduling theory: an overview of scheduling research in the twentieth century, Production Planning and Control, 13, 105- 116.   DOI   ScienceOn
18 Ovacik, I. M. and Uzsoy, R. (1997), Decomposition Methods for Complex Factory Scheduling Problems, Norwell, MA: Kluwer Academic.
19 Uskup, E. and Smith, S. B. (1975), A branch-and-bound algorithm for two-stage production-sequencing problems, Operations Research, 23, 118-136.   DOI   ScienceOn
20 Kim, S. C. and Bobrowski, P. M. (1994), Impact of sequence- dependent setup time on job shop scheduling performance, International Journal of Production Research, 32, 1503-1520.   DOI   ScienceOn
21 Gupta, S. K. (1982), N jobs and m machines job-shop problems with sequence dependent setup times, International Journal of Production Research, 20, 643-656.   DOI   ScienceOn
22 Corwin, B. D. and Esogbue, A. O. (1974), Two machine flow shop scheduling problems with sequence dependent setup times : A dynamic programming approach, Naval Research Logistics Quarterly, 21, 515-524.   DOI   ScienceOn
23 Conway, R. W., Maxwell W. L., and Miller L. W. (1967), Theory of Scheduling, Addison-Wesley, Reading, MA.
24 Sun, J. U. and Hwang, H. (2001), Scheduling problem in a two-machine flow line with the N-step prior-jobdependent set-up times, International Journal of Systems Science, 32, 375-385.   DOI   ScienceOn
25 Ahn, S. H. (1995), A study on algorithm to minimize makespan of sequenc-dependent jobs, Journal of the Korean Institute of Management Science, 12, 77-87.
26 Adams, J., Balas, E., and Zawack, D. (1988), The shifting bottleneck procedure for job shop scheduling, Management Science, 3, 391-401.
27 Hwang, H. and Sun, J. U. (1998), Production sequencing problem with re-entrant work flows and sequence dependent setup times, International Journal of Production Research, 36, 2435-2450.   DOI   ScienceOn
28 Zoghby, J., Barnes, J. W., and Hasenbein, J. J. (2005), Modeling the reentrant job shop scheduling problem with setups for metaheuristic searches. European Journal of Operational Research, 167, 336-348.   DOI   ScienceOn