• Title/Summary/Keyword: Turn-on

Search Result 5,405, Processing Time 0.037 seconds

A Study on Analyzing Effect of Claim Factoy to Prevent Claim in Early Stage for Construction Project - Focusing on Turn-Key Project - (건설 프로젝트 초기단계에서의 클레임 방지를 위한 클레임 요인 영향도 분석에 관한 연구 - 턴키공사 사레 중심으로 -)

  • Yoon Jun-Seon;Seo Choon-Taek
    • Journal of Arbitration Studies
    • /
    • v.15 no.1
    • /
    • pp.95-112
    • /
    • 2005
  • In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of pre-construction(from a bid to a contract) owing to the specialties of the turn key constructions. So the claim factors of the Korean turn key constructions were abstracted in antecedent paper. When the technicians meeting the interior turn key constructions for the first time and working here now are well acquainted with only these factors, many claims will be prevented. By analysing the degree of claims by claims factors through the questionnaires to the experts about the abstracted factors and surveying the amount of the claims through the case studies, what factors exerted how much of influence on the claims was tested and analyzed. Studying and Managing the factors affecting the claims much led the technicians in charge of internal turn key constructions to the prevention and the proper solution of the site claims.

  • PDF

Automatic Turn-off Angle Control for High Speed SRM Drives

  • Nashed Maged N.F.;Ohyama Kazuhiro;Aso Kenichi;Fujii Hiroaki;Uehara Hitoshi
    • Journal of Power Electronics
    • /
    • v.7 no.1
    • /
    • pp.81-88
    • /
    • 2007
  • This paper presents a new approach to the automatic control of the turn-off angle used to excite the Switched Reluctance Motor (SRM) employed in electric vehicles (EV). The controller selects the turn-off angle that supports and improves the performance of the motor drive system. This control scheme consisting of classical current control and speed control depends on a lookup table to take the best result of the motor. The turn-on angle of the main switches of the inverter is fixed at $0^{\circ}C$ and the turn-off angle is variable depending on the reference speed. The motor, inverter and control system are modeled in Simulink to demonstrate the operation of the system.

Design of 4.5kV/1.5kA IGCT (4.5kV/1.5kA급 IGCT 설계 및 특성분석)

  • Kim, Hyoung-Woo;Kim, Sang-Cheol;Seo, Kil-Su;Kim, Eun-Dong
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2003.07a
    • /
    • pp.357-360
    • /
    • 2003
  • In this paper, we designed 4.5kV/1.5kA IGCT devices. GCT thyristor has many superior characteristics compared with GTO thyristor, for examples; snubberless turn-off capability, short storage time, high turn-on capability, small turn-off gate charge and low total power loss of the application system containing device and peripheral parts such as anode reactor and snubber capacitance. In this paper we designed GCT thyristor devices, and analyzed static and dynamic characteristics of GCT thyristor depending on the minority carrier lifetime, n-base thickness and doping concentration of n-base region, respectively. Especially, turn-on and turn-off characteristics are very important characteristics for GCT thyristor devices. So, we considered above characteristic for design and analysis of GCT devices.

  • PDF

The Switching Characteristics of Series-Connected Power Transistors (전력용 트랜지스터의 직렬연결시 스윗칭 특성)

  • 서범석;이택기;현동석
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.41 no.6
    • /
    • pp.600-606
    • /
    • 1992
  • The series connection of power switching semiconductor elements is essential when a high voltage converter is made, so researches are being conducted to further develop this technology. In the series connection of power switching semiconductor elements, the main problem is that simultaneous conduction at turn-on and simultaneous blocking at turn-off together with voltage balancing are unattainable because of the difference of their switching characteristics. In this paper a novel series connection algorithm is proposed, which can implement not only the synchronization of the points of turn-on and turn-off time but the dynamic voltage balancing in spite of the difference of each switching characteristics. The proposed method is that the compensated control signal is attained from the voltage feedback signal and applied to the series-connected power transistors independently. Computer simulation and experimental results verify its validity.

  • PDF

Development of Optimal Path Algorithm for Advanced Traveler Information System (첨단교통정보시스템의 최적경로 알고리즘 개발)

  • Kim, Sung-Soo;Cha, Young-Min
    • Journal of Industrial Technology
    • /
    • v.21 no.A
    • /
    • pp.241-249
    • /
    • 2001
  • The objective of this paper is to develop the optimal path algorithm for dynamic route guidance system in advanced traveler information system (ATIS). The travel time is forecasted in each path between network nodes. Floyd-Warshall algorithm is used to find the optimal route based on this forecasted travel time in dynamic traffic network. This algorithm is modified to apply the real traffic network that has left-turn restriction, U-turn, and P-turn. A big value is assigned to one of arcs in turn restriction and a virtual node is used to consider U-turn and P-turn for Floyd-Warshall algorithm.

  • PDF

A Study on Left-turn Queues Analysis using Queueing Theory under Permissive Left-turn Signal System (비보호좌회전 신호체계운영에 따른 좌회전 대기행렬분석에 관한 연구)

  • Kim, Kap Soo;Jung, Ja Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.5D
    • /
    • pp.663-669
    • /
    • 2011
  • In this study, the optimal length of left-turn lane in permissive left-turn signal system at the signalized intersection which has a left-turn bay is estimated. It is a simulation analysis using the queueing theory that estimate the length of left-turn lane. Traffic density conform to the standards of operating a permissive left-turn system of the Practical Manual Traffic Safety Facilities. And each of a left-turn arrival rate, a left-turn service rate, left-turn average queueing time, for green time average queueing vehicle, for red time average queueing vehicle and average queueing vehicle cycle is calculated. As a result of this study, we would learn how much the space should be secured at the signalized intersection which has a left-turn bay. The methodology using the queueing theory to work out the optimal length of waiting lane in the permissive left-turn signal system was presented.

Investigation of Dual-Spin Turn and Attitude Acquisition of Satellite (위성의 Dual-Spin Turn 방법 분석 및 자세획득)

  • Seo, Hyeon-Ho
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.34 no.2
    • /
    • pp.36-47
    • /
    • 2006
  • The process of dual spin turn maneuver is introduced for attitude acquisition or recovery from flat spin state of a satellite. The physical principle of momentum transfer during dual spin turn is explained clearly. The case studies of special dual spin turn, in addition to the conventional dual spin turn, that are known as an acceptable cases, are performed to investigate the principle of dual spin turn and to provide a physical insight as well as the solution of dual spin turn. This study is done based on case-study simulation, which includes two-state control scheme composed of open-loop maneuver and energy dissipation device. Furthermore, we investigate the stability for the verification of all control cases after implementing two-stage control. We also provide the simulation scenario of flat spin recovery using dual spin turn method as an example.

A Study of Abstracting Dispute Factor to Prevent Dispute in Early Stage for Construction Project - Focusing on Turn-Key Project - (프로젝트 초기 단계에서의 분쟁방지를 위한 분쟁요인 추출에 관한 연구 - 턴키공사 사례 중심으로 -)

  • Yoon Jun-Seon;Kwon Gi-Beom;Seo Choon-Taek;Paek Joon-Hong
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.315-344
    • /
    • 2004
  • Although we try to increase the order of turn key construction for the international competitiveness strengthening, the construction quality advancement and the productivity enhancement of the public sectors, the problems of the domestic turn key systems are causing the hardships of all the participants and many possible disputes. The home turn key constructions have been activated since 1997. A lot of trial and error had been experienced in these days, and the turn key systems have been changed little by little. But the bases are continuously kept because of their reflecting all the participants' opinions. In the inner turn key constructions the problems of uniform types are repeatedly occurred, and, especially, many problems happen up to the stage of early stage owing to the specialties of the turn key construction. So the dispute factors of the Korean turn key constructions were abstracted through the literature searches, the site document examinations, the case studies and the interviews with the experts. When the technicians meeting the interior turn key construction for the first time and working here now are well acquainted with only these factors, many disputes will be prevented.

  • PDF

A Study on the Operational Method of Urban Arterial With U-Turn (U-Turn을 이용한 간선도로 운영방안)

  • 박용진;손한철
    • Journal of Korean Society of Transportation
    • /
    • v.18 no.1
    • /
    • pp.17-26
    • /
    • 2000
  • U-turns are allowed widely at the intersections by local police department while the left-turn Phases have been gradually Prohibited. However, any strategies for U-turn movements at signalized intersections are unavailable. Therefore, the Purpose of this study is to Propose the efficient operational method of Urban arterial adopting U-turn strategies. Four alternatives are evaluated they are, 1) U-turn movements are allowed at the adjacent intersection with exclusive U-turn lane while the major or the minor approach is Prohibited, 2) U-turn movements are allowed at the adjacent mid-block Pedestrian crossing with exclusive U-turn lane while the major approach is Prohibited. 3) U-turn movements are allowed at the adjacent mid-block Pedestrian crossing with exclusive U-turn lane while the minor approach is prohibited and 4) Comparative one between alternative 3 and 4. From the results of this study, it concludes that the method of U-turn movements allowed at the adjacent mid-block pedestrian crossing with exclusive U-turn lane is the most effective strategy among those alternatives. The strategies of alternative 1 and 4 are Proposed by the boundary based on the major through and left-turn volumes and the minor left-turn volume.

  • PDF

Effectiveness Analysis on the Installation of Right-Turn Bypass Lane in Roundabout (회전교차로 우회전 별도차로 설치 효과 검토)

  • Lim, Jin-Kang;Kim, Kyung-Hwan;Park, Byung-Ho
    • International Journal of Highway Engineering
    • /
    • v.12 no.4
    • /
    • pp.29-37
    • /
    • 2010
  • This study deals with the Right-Turn Bypass Lane in Roundabout. The purpose of the study is to comparatively analysis the effectiveness questions on the installation of right-turn bypass lane in roundabout. In pursuing the above, this study analyzed after and before of the right turn bypass lane plan by VISSIM software. The right turn bypass lane is formed by control type of yield and control type of joint were compared and analyzed the effects of the operation. The main results analyzed are as follows. First, after Right-Turn Bypass Lane is Installed, the traffic volume rate of the right-turn increasing by average delay time per vehicle is on the gradual decrease, maximum average about 28% with the fact that decreases. Second, control type of yield and control type of joint are both average delay time per vehicle decreasing by the traffic volume rate of the right-turn is on the gradual increase. Control type of joint was analyzed with the fact that has the maximum average about 18% delay decrement efficiency.