• 제목/요약/키워드: Turn-key based contract

검색결과 6건 처리시간 0.032초

시스템엔지니어링을 이용한 턴키방식 플랜트 건설계약의 기술적 위험요인 효과적 분석 및 관리 (An Effective Analysis and Management of Technical Risk to Turn-key based Plant Construction Contracts using Systems Engineering)

  • 홍대근;변희철;서석환
    • 시스템엔지니어링학술지
    • /
    • 제10권2호
    • /
    • pp.59-69
    • /
    • 2014
  • In the bidding stage of turn-key based plant construction contracts, owners provide design and performance basis for contractors instead of giving design drawing. To win the bid for a plant construction, the contractors should be obliged to satisfy and ensure owners'requirements such as design and performance basis in a plant construction project, In other words, owners imposes technical risk of the design to the contractors by specifying responsibility for the analysis and verification of the plant construction. Thus, it is very important that contracters make accurate and realistic basic design plan in a short period of time. To deal with such a situation, we propose a systems engineering approach for the analysis and management of the technical risk. Specifically, we first: 1) Analyzes technical risk related with the plant design information for the bidders, followed by 2) Developing stakeholder requirements for the basic engineering design, and 3) System requirements for dealing with technical risk. Also, in this paper, we proposed converting method from MOE(Measure of Effectiveness) to MOP(Measure of Performance) in the risk analysis. To show the effectiveness of the proposed method, we carried out a case study.

토목공사 수주현황 분석을 통한 턴키${\cdot}$대안입찰제도의 문제점 및 개선방안 연구 (Improvement of Turn-key Contract System through the Analysis of Present Ordering Condition in Civil Engineering Projects)

  • 이양규;강인석;박종혁;전성철
    • 한국철도학회논문집
    • /
    • 제8권5호
    • /
    • pp.460-469
    • /
    • 2005
  • Turnkey contract system is an effective ordering system for the ordering organizations that technical engineers are insufficient for their construction projects. It is possible to reduce project duration and to improve project quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system including railway projects. The result includes various methods for improving the system based on the analysis of bid price and selection procedure.

CBR(Case-Based Reasoning)을 활용한 턴키 공사 실시설계관리 방안 (Working Design Management of the Design Build Projects Using CBR)

  • 박세근;김영재;김경래;신동우
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2002년도 학술대회지
    • /
    • pp.432-437
    • /
    • 2002
  • 턴키 공사의 실시설계 단계는 기본설계 이후 최종 계약을 위한 준비 단계로써, 수행하여야 할 업무가 많을 뿐만 아니라, 그러한 업무의 결과가 실제 계약서류에 대한 근거가 되므로 턴키 사업 수행자 입장에서는 철저한 관리가 필요한 단계이다. 그러나 국내 건설회사의 경우, 최근까지 단순히 시공 주체로써의 능력만을 키워왔으며 턴키 사업에 대한 경험이 미비하여, 실시설계 단계의 프로세스와 기존사례가 체계화되어 있지 않아 현장관리자가 해당 프로세스에서 업무를 수행하는 데 어려움이 있었다. 이를 해결하기 위해, 먼저 턴키 사업의 이론적 고찰을 통하여 연구의 근거와 필요성을 제시하고, 현장관리자 면담을 통해 실시설계 단계에서 수행하여야 할 업무와 그에 따르는 제반사항에 대해 파악한 후, 실제 발생하였던 의사결정 사항들과 그에 대한 대처방안 및 예방방안에 대해 조사하였다. 그리고 면담조사 결과를 바탕으로 턴키 공사의 실시설계 단계 프로세스 모델과 CBR(Case-Based Reasoning)을 활용한 실시설계관리 방안을 제시하였다.

  • PDF

턴키계약체결시 국제적 강행규정에 의한 준거법 제한에 관한 사례연구 - Clough Engineering Ltd v Oil & Natural Gas Corp Ltd 사건을 중심으로 - (A Case Study on the Limitations of the Choice of Law caused by Internationally Mandatory Rules in Entering into the Turn-Key Contracts)

  • 오원석;김용일
    • 무역상무연구
    • /
    • 제54권
    • /
    • pp.145-166
    • /
    • 2012
  • This article examines the limitations of the choice of law caused by Internationally Mandatory Rules in Entering into the Turn-Key Contracts. In June 2007, Clough Engineering, a corporation based in Western Australia, approached the Federal Court of Australia seeking injunctive relief and leave to commence proceedings against an entity located outside Australia, the Oil & Natural Gas Corp of India (ONGC). Clough had contracted with ONGC to provide a range of services in relation to the construction of gas and oil wells off the coast of India. The contract was governed by Indian law, and included a clause by which the parties agreed to submit their disputes to arbitration. Yet the Federal Court assumed jurisdiction over the dispute, principally because Clough had framed its claim as a plea for relief for contraventions of Australia's Trade Practices Act 1974. The result of this cases that it is possible for an arbitral tribunal to hear a claim made under the Trade Practices Act even if that claim arises "in connection with"a contract the proper law of which is not the law of Australia. However, in Transfield Philippines Inc v Pacific Hydro Ltd, the turnkey contract included a choice of law provision, selecting the law of the Philippines, and a clause providing that all disputes arising out of or in connection with the agreement were to be arbitrated under the ICC Rules, with the seat in Singapore. Hearings were in fact conducted in Melbourne, Australia, although all awards were published in Singapore. The result of this cases that it would not be appropriate for an Australian court to adjudicate claims for misrepresentation under Australian statutes dealing with misleading and deceptive conduct, once the arbitral tribunal had determined, applying appropriate choice of law rules, that such claims are governed by the law of the Philippines. To do so would lead to a multiplicity of proceedings, usurp the jurisdiction of the tribunal and deny the intention of the parties as expressed by them in the arbitration agreement. In short, the Internationally Mandatory Rules as an active part of public order create limitation of party autonomy in choice of law rules in a different way. The court is fully entitled to refuse to use those rules of law applicable on the contract which are in the contradiction to the internationally mandatory rules of law of the forum. And the court may give an effect to those Internationally Mandatory Rules that form a part of a law of foreign country when deciding about applicability of certain rules of applicable law.

  • PDF

공공 건설공사 발주방식에 따른 비용성과 비교연구 (Comparison of Cost Performance for Delivery Methods on Public Construction Projects)

  • 이유섭;강태경;신은영;박원영
    • 대한토목학회논문집
    • /
    • 제33권6호
    • /
    • pp.2575-2582
    • /
    • 2013
  • 공공건설공사 발주제도 운영에 있어 기술경쟁을 지향하는 턴키 및 대안방식 등 설계 시공일괄방식의 경우, 시설물의 품질향상 및 건설기술 발전에 기여하였음에도 불구, 계약되는 공사비가 설계 시공 분리발주방식을 적용하는 공사보다 높아 예산낭비 우려가 있다는 지적과 함께 수주독점, 입찰담합, 심의비리 등의 문제가 쟁점이 되고 있다. 그러나 실제 발주방식별 사업성과와 효과에 대해 정밀 비교분석한 사례가 없는 실정이며, 단순히 낙찰률 등 사업의 한정된 일반적 정보만으로 사업효과를 논의하고 판단하는 것은 자칫 오류를 범할 우려가 있다. 이에 공공 건설공사를 대상으로 계약에서 준공에 이르기까지 실제 집행한 공사비 자료를 광범위하게 조사하여 비용의 투입구조 및 변동추세 등 발주방식별 특성을 비교분석하고 공공건설공사 발주제도의 올바른 이해와 효율적 운영을 도모하고자 한다.

설계시공일괄방식 사업의 진행단계별 업무프로세스 모델 (Business Process Model for Progress Phase of Design-Build Project)

  • 송영웅;손보식;전재열;최윤기
    • 한국건설관리학회논문집
    • /
    • 제10권4호
    • /
    • pp.38-49
    • /
    • 2009
  • 최근 정부 공사를 중심으로 기술경쟁이 가능한 설계시공일괄 입찰방식이 확대 적용되고 있는 추세이며 이러한 시장의 변화에 따라서 그 중요성이 더욱 증가할 것으로 예상된다. 일반적으로 설계시공일괄방식의 단위 건설사업 생애주기는 기획, 기본 설계, 입찰, 계약, 상세설계, 착공, 시공, 준공, 평가의 진행단계를 가지게 된다. 계약자의 측면에서 주무부서의 잦은 변화로 효율적인 프로젝트 관리와 일관성 있는 정보의 공유가 어려워지는 문제점이 드러나고 있다. 이러한 문제점을 해결하기 위해 기존의 주무부서에 따른 기능 중심의 관리 체계에서, 프로젝트 중심의 관리 프로세스 체계로의 전환이 필요하다. 본 연구에서는 이러한 필요성에 따라 단위 프로젝트의 진행단계별 관리 프로세스 모델 개발을 목적으로 하였다. 이를 위해서 설계시공일괄방식의 진행단계별 주요 관리 쟁점과 의사결정 사항, 업무 분석을 하였고, 진행단계별 관리 주제의 책임 및 권한과 주요 관리 포인트의 변화를 분석하여 체계화 하였다. 프로젝트 특성별 및 진행단계별 연결고리가 되는 핵심 정보를 정의 하고 정보의 흐름을 분석하였으며, 이를 바탕으로 최종적으로 발주계획 수립 단계부터 실시설계 심의 단계까지의 업무 프로세스를 모델링하고 각 수행 주체별 업무프로세스를 모델링 하여 단위 프로젝트의 진행단계별 관리 프로세스 모델을 개발하였다.