• Title/Summary/Keyword: Tunnel portal slope

Search Result 22, Processing Time 0.027 seconds

Slope stability analysis and landslide hazard assessment in tunnel portal area (터널 갱구지역 사면안정성 및 산사태 위험도 평가)

  • Jeong, Hae-Geun;Seo, Yong-Seok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.4
    • /
    • pp.387-400
    • /
    • 2013
  • In this study, the slope stability analysis and the landslide hazard assessment in tunnel portal slope were carried out. First, we selected highly vulnerable areas to slope failure using the slope stability analysis and analyzed the slope failure scale. According to analyses results, high vulnerable area to slope failure is located at 485~495 m above sea level. The slope is stable in a dry condition, while it becomes unstable in rainfall condition. The analysis results of slope failure scale show that the depth of slope failure is maximum 2.1 m and the length of slope failure is 18.6 m toward the dip direction of slope. Second, we developed a 3-D simulation program to analyze characteristics of runout behavior of debris flow. The developed program was applied to highly vulnerable areas to slope failure. The result of 3-D simulation shows that debris flow moves toward the central part of the valley with the movement direction of landslide from the upper part to the lower part of the slope. 3-D simulation shows that debris flow moves down to the bottom of mountain slope with a speed of 7.74 m/s and may make damage to the tunnel portal directly after 10 seconds from slope failure.

Study on Statistical Method for Objective Evaluation of Tunnel Portal Slopes (객관적인 터널 갱구사면 평가를 위한 통계기법 연구)

  • Kwon, O-Il;Baek, Yong;Na, Jong-Hwa;Seo, Yong-Seok;Kim, Gyo-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.634-643
    • /
    • 2006
  • This study was intended to develop a high reliable technique by statistically processing on-site data with a general linear model, providing the basic data for construction, analysis of stability and establishment of maintenance measures for tunnel portal slopes in the future. This study evaluated the stability of a tunnel portal slope using a quantified technique, which is based on a general linear model. The important scores of each independent variable were allocated by using the ranges of the quantified values, based on the predicted coefficient of regression and the scores for categories of each independent variable were allocated so that those are equally spaced. The quantification model obtained from the results of evaluating the total data used for the quantification process provided precise results. In addition, it is expected that a more detail subdivision of response variables and sufficient data would produce a better stability evaluation standard.

  • PDF

Study of Stability Analysis and Countermeasure Tunnel Portal Failure using Dipole-Dipole Investigation (쌍극자(Dipole-Dipole)탐사를 활용한 터널붕괴사면 조사 및 대책방안 제시 연구)

  • Baek, Yong;Rhee, Jong-Hyun;Koo, Ho-Bon;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.493-498
    • /
    • 2003
  • In case of slope failure by planted protection is constructed on the slope according to of the choice trend of a recently environmental-friendly countermeasure, there has a limitation about diagnosis and preparation of measure. Also, collapse of tunnel pithead department slope has maximum in construction and countermeasure method of construction choice unlike cut-slope. In this study, analyzed inside circumstance of slope using geophysical exploration for stability analysis and countermeasure inside presentation of tunnel pithead department slope which collapse happens. geophysical exploration used dipole(Dipole-Dipole) method that is based to distribution principle does specific resistance, goes side by side with on-the-spot observation and draws base strength parameter and executed stability analysis, and presented stabilization countermeasure inside of collapse slope on this. I wish to conduce in development and research for use technical development of geophysical exploration technique hereafter by executing geophysical exploration in road collapse spot applying through this study.

  • PDF

Study on collapse mechanism and treatment measures of portal slope of a high-speed railway tunnel

  • Guoping Hu;Yingzhi Xia;Lianggen Zhong;Xiaoxue Ruan;Hui Li
    • Geomechanics and Engineering
    • /
    • v.32 no.1
    • /
    • pp.111-123
    • /
    • 2023
  • The slope of an open cut tunnel is located above the exit of the Leijia tunnel on the Changgan high-speed railway. During the excavation of the open cut tunnel foundation pit, the slope slipped twice, a large landslide of 92500 m3 formed. The landslide body and unstable slope body not only caused the foundation pit of the open cut tunnel to be buried and the anchor piles to be damaged but also directly threatened the operational safety of the later high-speed railway. Therefore, to study the stability change in the slope of the open cut tunnel under heavy rain and excavation conditions, a 3D numerical calculation model of the slope is carried out by Midas GTS software, the deformation mechanism is analyzed, anti-sliding measures are proposed, and the effectiveness of the anti-sliding measures is analyzed according to the field monitoring results. The results show that when rainfall occurs, rainwater collects in the open cut tunnel area, resulting in a transient saturation zone on the slope on the right side of the open cut tunnel, which reduces the shear strength of the slope soil; the excavation at the slope toe reduces the anti-sliding capacity of the slope toe. Under the combined action of excavation and rainfall, when the soil above the top of the anchor pile is excavated, two potential sliding surfaces are bounded by the top of the excavation area, and the shear outlet is located at the top of the anchor pile. After the excavation of the open cut tunnel, the potential sliding surface is mainly concentrated at the lower part of the downhill area, and the shear outlet moves down to the bottom of the open cut tunnel. Based on the deformation characteristics and the failure mechanism of the landslides, comprehensive control measures, including interim emergency mitigation measures and long-term mitigation measures, are proposed. The field monitoring results further verify the accuracy of the anti-sliding mechanism analysis and the effectiveness of anti-sliding measures.

Safety Assessment to Construction Position of Constructed Steel Structures under Declinating Earth Pressure (편토압을 받는 파형강판 구조물의 시공위치별 안전성 평가)

  • Lee, Sang-Hyun;Lim, Heui-Dae
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.1
    • /
    • pp.28-34
    • /
    • 2008
  • The corrugated steel plate structures is applied to the construction of mountain tunnel portal part with shallow depth, the tunnel on the outskirts of urban areas and ecology move passage. In this study, A finite element method is used for research the behavior of corrugated steel plate structures due to construction position under declinating earth pressure and excavation depth. A finite element method were performed varying construction position(10, 15, 20 and 25m) from slope and excavation depth from surface. The hoop thrust and moment, displacement of corrugated steel plate subjected to construction position and excavation depth is determined from a finite element method. From results of finite element method, it was found that the increase of thrust and the decrease of displacement as the amount of distance increase from slope with construction position. But the thrust and moment, displacement has not different value with excavation depth.

A Case Study on the Field Investigation and Stability Analysis of the Collapsed Cut-Slope in Tunnel Portal, Danyang (단양 지역 터널입구부 붕괴절토사면 현장조사 및 안정성 해석 사례 연구)

  • Kim, Seung-Hyun;Koo, Ho-Bon;Kim, Seung-Hee
    • The Journal of Engineering Geology
    • /
    • v.19 no.3
    • /
    • pp.401-408
    • /
    • 2009
  • Old national Road No. 59 that connects Danyang and Gagok has 35 dangerous cut slopes. It is relatively narrow and has a poor alignment. The torrential rains in 2002 and 2006 has caused numerous slope collapses, landslides and road settlements in this area. The old road's high risk level lead to the planning and construction of a new national road. During the construction of the new road in December 2006, the right side of Dugcheon Tunnel entrance has collapsed and tension cracks were observed on the district road above the tunnel. In order to determine the cause of failure, intensive field investigation and monitoring cracks were performed together with Lower Hemisphere Projection Analysis, Limit Equilibrium Analysis and Finite Difference Analysis.

Soft Sedimentary Rock Slopes Design of Diversion Tunnel

  • Jee, Warren Wangryul
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2007.10a
    • /
    • pp.63-79
    • /
    • 2007
  • Several remedial works were attempted to stabilize the collapsed area of the inlet slopes of diversion tunnel, but prevention of any further movement was being only carried out at beginning stage by filling the area with aggregates and rock debris, after several cracks had been initiated and developed around the area. The extra specialty developed folding zone is consisted with highly weathered Greywacke and Black shale. The suggested solution is to improve the properties of the rock mass of failed area by choosing the optimum level of reinforcement through the increment of slope rock support design so as to control the movement of slopes during the re-excavation. The Bakun hydroelectric project includes the construction of a hydroelectric power plant with an installed capacity of 2,520MW and a power transmission system connecting to the existing transmission networks in Sarawak and Western Malaysia. The power station will consist of a 210m height Concrete Faced Rockfill Dam. During the construction of the dam and the power facilities the Balui River has to be diverted of the tunnels is 12m and the tunnel width is 16m at the portal area. This paper describes the stability analysis and design methods for the open cut rock slopes in the inlet area of the diversion tunnels. The geotechnical parameters employed in stability calculations were given as a function of four defined Rock Mass Type (RMT) which were based on RMR system from Bieniawski. The stability calculations procedure of the rock slopes are divided into two stages. In the first stage, it is calculated for the stability of each "global" slope without any rock support and shotcrete system. In the second stage, it is calculated for each "local" slope stability with berms and supported with rock bolts and shotcrete. The monitoring instrumentation was performed continuously and some of the design modification was carried out in order to increase the safety of failed area based on the unforeseen geological risks during the open cut excavation.

  • PDF

Monitoring System of Rock Mass Displacement and Temperature Variation for KURT using Optical Sensor Cable (광섬유센서케이블을 이용한 지하연구시설의 지반변위 및 온도변화 감시시스템 구축)

  • Kim, Kyung-Su;Bae, Dae-Seok;Koh, Yong-Kwon;Kim, Jung-Yul
    • The Journal of Engineering Geology
    • /
    • v.19 no.1
    • /
    • pp.63-70
    • /
    • 2009
  • The optical fiber cable acting as a sensor was embedded in the underground research tunnel and portal area in order to monitor their stability and the spatial temperature variation. This system includes two types of sensing function to monitor the distributed strain and temperature along the line, where sensor cable is installed, not a point sensing. According to the results of one year monitoring around the KURT, there is no significant displacement or movement at the tunnel wall and portal slope. However, it would be able to aware of some phenomena as an advance notice at the tunnel wall which indicates the fracturing in rockmass and shotcrete fragmentation before rock falls accidently as well as movement of earth slope. The measurement resolution for rock mass displacement is 1 mm per 1 m and it covers 30 km length with every 1m interval in minimum. In temperature, the cable measures the range of $-160{\sim}600^{\circ}C$ with $0.01^{\circ}C$ resolution according to the cable types. This means that it would be applicable to monitoring system for the safe operation of various kinds of facilities having static and/or dynamic characteristics, such as chemical plant, pipeline, rail, huge building, long and slim structures, bridge, subway and marine vessel. etc.

A Case Study of Soil-Cement Fill for Tunneling (소일시멘트 복토후 터널굴착에 대한 사례 연구)

  • Shin Il-Jae;Kang Jun-Ho;Suh Young-Ho
    • Tunnel and Underground Space
    • /
    • v.15 no.5 s.58
    • /
    • pp.359-368
    • /
    • 2005
  • In case the overburden of a tunnel is too low to adopt NATM, cut and cover method generally can be chosen as alternative. However, in tunneling some area with very low or no overburden between two mountains, the cut and cover method requires additional construction of a couple of tunnel portals and the maintenance of portal slopes until backfilling is completed. As a solution for this problem, increasing the tunnel overburden by raising the ground level can be effective. This paper presents the case study for tunneling at C240 site in Taiwan High Speed Railway(THSR) in which soil-cement filling method was used for pre-banking before tunnel excavation. Cement content of filling material was $2\~4\%$ and thickness of filling a round was $130\~250\;mm$. The stability evaluation for the soil-cement slope and concrete lining of low cover tunnel was conducted by numerical analysis.

A Case Study of Collapse at Tunnel Portal adjacent to the Large Cut Slope (대절토사면과 인접한 터널갱구부의 붕괴사례연구)

  • Koo, Ho-Bon;Kim, Seung-Hee;Rhee, Jong-Hyun;Kim, Jin-Hwan
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.573-576
    • /
    • 2008
  • 절토사면 및 천심도 터널의 경우 불연속면을 따른 블록의 미끄러짐 및 회전 등이 안정성에 큰 영향을 미친다. 국도나 지방도 등을 확장 공사함에 따라 산악이 많은 우리나라 지형의 특성상 절토사면이 많이 발생하게 되고, 경우에 따라서는 이러한 절토사면에 터널이 위치하게 된다. 이런 상황의 터널갱구부 및 인접한 절토사면부에서 붕괴 및 균열이 빈번하게 발생되고 있다. 본 연구에서는 대절토사면과 인접한 터널갱구부에 대하여 편토압이 균열의 주원인인지를 결정하기 위하여 변위 및 응력 패턴을 분석한 사례연구를 제시하였다. 조사대상지역은 울진군에 위치한 터널굴진 현장이고, 붕괴는 터널갱구부와 인접한 절토사면부에서 발생하였으며 터널갱구부 상단의 숏크리트 타설지역에서 다수의 균열이 관찰되었다. 언급한 터널갱구부의 변위 및 응력패턴을 모사하기 위하여 유한차분법에 근거한 플랙을 사용하였으며, 세밀한 수치해석을 위해 편재절리모델을 도입하였다. 마지막으로, 터널갱구부의 균열에 영향을 미친 주원인에 대한 고찰을 다루었다.

  • PDF