• Title/Summary/Keyword: Tunnel portal

Search Result 94, Processing Time 0.022 seconds

New methodology to prevent blasting damages for shallow tunnel

  • Ozacar, Vehbi
    • Geomechanics and Engineering
    • /
    • v.15 no.6
    • /
    • pp.1227-1236
    • /
    • 2018
  • From all of the environmental problems, blast-induced vibrations often cause concern to surrounding residents. It is often claimed that damage to building superstructures is due to blasting, and sometimes the building owner files a lawsuit against the company that perform blasting operations. The blast-vibration problem has been thoroughly investigated in the past and continues to be the subject of ongoing research. In this study, a tunnel construction has been performed by a construction company, according to their contract they must have used drilling & blasting method for excavation in tunnel inlet and outlet portal. The population is very condensed with almost tunnel below in the vicinity houses of one or two floors, typically built with stone masonry and concrete. This situation forces the company to take extreme precautions when they are designing blasts so that the blast effects, which are mainly vibration and aerial waves, do not disturb their surrounding neighbors. For this purpose, the vibration measurement and analysis have been carried out and a new methodology in minimizing the blast induced ground vibrations at the target location, was also applied. Peak particle velocity and dominant frequencies were taken into consideration in analyzing the blast-induced ground vibration. The methodology aims to employ the most suitable time delays among blast-hole groupings to render destructive interference of surface waves at the target location.

Application of SFRC as a lining material in tunnels (터널라이닝 구조재로서 SFRC 적용에 관한 연구)

  • Yi, Sang-Keun;Kim, Dong-In;Jo, Gyu-Seung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.3 no.4
    • /
    • pp.25-34
    • /
    • 2001
  • As the topography of Korea consists of mountains at about seventy percent, there is necessarily an increasing demand for tunnel construction according to the expansion of the existing highway and construction of new highway. The concrete lining of tunnel portals has been designed with reinforced concrete to resist the cracking due to the difference in temperature in the inside and outside of tunnel. In the paper, the application of steel fiber reinforcement concrete was analyzed as the lining concrete at tunnel portals and through structure analysis and field model test the suitability of the steel fiber reinforcement concrete was assessed as the lining member of tunnel portal.

  • PDF

Hauling time prediction of the muck generated by a blasting around a tunnel (터널 주변 폭발로 인해 발생된 버력의 처리시간 예측)

  • You, Kwang-Ho;Son, Myung-Kyun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.15 no.1
    • /
    • pp.33-47
    • /
    • 2013
  • When a bomb explodes near a tunnel, generated muck should be quickly moved outside for rehabilitation of the tunnel. In this study, the amount of muck generated by an explosion was estimated and a methodology was presented for the prediction of the muck hauling time. To this end, 3D-meshes were made by using SoildWorks and blasting analyses were performed by using AUTODYN. A method was suggested to calculate theoretically the amount of muck which inflows into a tunnel based on the relationship between the tunnel and the fragmentation zone obtained from the analysis results. Also, muck hauling times were predicted based on the selection of construction equipment and the results were compared and analyzed. As a result, it was convinced that the amount of muck flowing into the tunnel could be effectively calculated by classifying the relationship between a tunnel and the fragmentation zone into 4 cases and using the mensuration by parts. Also it was confirmed that the closer blasting location is to the portal and the excavation surface of a tunnel, and the more blasting location deviates from the center line of the tunnel, the lesser amount of muck occurs and thus the muck hauling time decreases as well.

The Surgical Results of Carpal Tunnel Syndrome - Open Versus Endoscopic Method - (수근관증후군의 수술방법에 따른 성적 - 내시경수술과 개방절개술 -)

  • Lee, Han Young;Kim, Il-Man;Lee, Jang Chull;Lee, Chang Young;Son, Eun Ik;Kim, Dong Won;Yim, Man Bin
    • Journal of Korean Neurosurgical Society
    • /
    • v.29 no.11
    • /
    • pp.1451-1455
    • /
    • 2000
  • Objective : The goal of this study is to present whether endoscopic release(ER) is superior to open release(OR) for the treatment of carpal tunnel syndrome(CTS). Method and Material : Fifty-nine wrists in 43 patients who had clnical signs and symptoms consistent with CTS, not responded to non-operative management, were entered into the study. Authors retrospectively compared 27 wrists treated with ER(February 1999-June 1999) with 32 wrists treated with OR(October 1997-March 1999). We performed conventional open surgery in 25 patients(mean age ; 46 years) and Brown's two-portal technique in 18 patients(mean age ; 53 years) under intravenous regional block or general anesthesia. Results : Sixteen patients had CTS on both hands and left hands were affected more frequently than right hand, 34 and 25 respectively. Successful and poor results of ER were similar to those of OR. For patients in OR group, mean duration of symptoms was 5 years(range 1 month-30 years), and postoperative outcome was good in 27(84.4%) of wrists and poor in 5(15.6%). For patients in ER group, mean duration of symptoms was 7 months (range 2 months-25 years), outcome was good in 23(85.2%) of wrists and poor in 4(14.8%). The average time for complete relief of pain was 1.3 weeks and 7.6 weeks, respectively for OR and ER groups. No complication was noted in either group. Conclusion : This preliminary analysis suggests that faster relief of pain was achieved when the endoscopic method was used, although there were no significant differences in their efficacies regarding the improvement of symptoms.

  • PDF

Optimization of long span portal frames using spatially distributed surrogates

  • Zhang, Zhifang;Pan, Jingwen;Fu, Jiyang;Singh, Hemant Kumar;Pi, Yong-Lin;Wu, Jiurong;Rao, Rui
    • Steel and Composite Structures
    • /
    • v.24 no.2
    • /
    • pp.227-237
    • /
    • 2017
  • This paper presents optimization of a long-span portal steel frame under dynamic wind loads using a surrogate-assisted evolutionary algorithm. Long-span portal steel frames are often used in low-rise industrial and commercial buildings. The structure needs be able to resist the wind loads, and at the same time it should be as light as possible in order to be cost-effective. In this work, numerical model of a portal steel frame is constructed using structural analysis program (SAP2000), with the web-heights at five locations of I-sections of the columns and rafters as the decision variables. In order to evaluate the performance of a given design under dynamic wind loading, the equivalent static wind load (ESWL) is obtained from a database of wind pressures measured in wind tunnel tests. A modified formulation of the problem compared to the one available in the literature is also presented, considering additional design constraints for practicality. Evolutionary algorithms (EA) are often used to solve such non-linear, black-box problems, but when each design evaluation is computationally expensive (e.g., in this case a SAP2000 simulation), the time taken for optimization using EAs becomes untenable. To overcome this challenge, we employ a surrogate-assisted evolutionary algorithm (SAEA) to expedite the convergence towards the optimum design. The presented SAEA uses multiple spatially distributed surrogate models to approximate the simulations more accurately in lieu of commonly used single global surrogate models. Through rigorous numerical experiments, improvements in results and time savings obtained using SAEA over EA are demonstrated.

Femoral Tunnel Obliquity between the Transtibial and Anteromedial Portal Technique in Single Bundle Anterior Cruciate Ligament Reconstruction (전방십자인대 단일 다발 재건술에서 경경골 술기 및 전내측 삽입구를 이용한 대퇴골 터널의 기울기)

  • Lee, Ju-Hong;Park, Jong-Hyuk;Bae, Hyeon-Kyeong;Kim, Jong-Gil;Wang, Sung-Il
    • Journal of Korean Orthopaedic Sports Medicine
    • /
    • v.9 no.1
    • /
    • pp.41-47
    • /
    • 2010
  • Purpose: To compare the obliquity of femoral tunnels prepared with transtibial (TT) versus anteromedial portal technique (AM) using x-ray in single-bundle anterior cruciate ligament (ACL) reconstruction. Materials and Methods: Among one-hundred thirty two patients who were undergoing ACL reconstruction from January 2007 to December 2009, thirty patients using TT and twenty patients using AM, those who had single-bundle ACL reconstruction, were evaluated with plain radiographs including anteroposterior, intercondylar notch and lateral view to compare the obliquity of bone tunnels. Results: The mean coronal obliquity of femoral tunnel for TT was $71^{\circ}$ (range; $65^{\circ}{\sim}77^{\circ}$), while for AM was $51^{\circ}$ (range; $39^{\circ}{\sim}60^{\circ}$) and the mean sagittal obliquity of femoral tunnel for TT was $22.7^{\circ}{\pm}7.8$, while for AM was $30.2^{\circ}{\pm}6.9$, their differences between them were statistically significant (P<0.05). However, there were no differences between two techniques on the tibial tunnel obliquity in coronal and sagittal plane. Conclusion: Anterior cruciate ligament reconstruction using AM portal technique allows more horizontally oriented and divergent femoral tunnel compared to that of transtibial technique. This seems to enable the graft placement into the femoral footprint and preserve the posterior cortical wall.

  • PDF

Endoscopic Carpal Tunnel Release with Transparent Flexible Tube (유연한 투명도관을 이용한 내시경적 수근관 절개술)

  • Chae In-Jung;Park Jung-Ho;Han Seung-Beom;Oh Kwang-Jun;Lee Byung-Taek
    • Journal of the Korean Arthroscopy Society
    • /
    • v.5 no.2
    • /
    • pp.120-123
    • /
    • 2001
  • Purpose : We used transparent flexible tube which had provided the good visual field of median nerve when it was used in endoscopic release of transverse carpal ligament and evaluated the safety of that technique. Materials and Methods : We evaluated the 12 patients(20cases) who had been diagnosed as carpal tunnel syndrome and performed by endoscopic carpal tunnel release between Mar. 1997 and Mar. 2000. We used two portal technique and released the transverse carpal ligament with direct supervision of median nerve. Results : 14 cases$(70\%)$ were revealed excellent or good results and 6 cases$(30\%)$ were fair. No serious complications were shown such as nerve injury. Conclusion : We could avoid the complications of endoscopic carpal tunnel release using the transparent flexible tube which had provided tire good circumferential vision around the median nerve and it is unnecessary to maintain the wrist Joint hyperextension state during operation. Also that tube was easily obtainable in hospital so we need not to purchase the expensive operation apparatus.

  • PDF

Study of Stability Analysis and Countermeasure Tunnel Portal Failure using Dipole-Dipole Investigation (쌍극자(Dipole-Dipole)탐사를 활용한 터널붕괴사면 조사 및 대책방안 제시 연구)

  • Baek, Yong;Rhee, Jong-Hyun;Koo, Ho-Bon;Bae, Gyu-Jin
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2003.03a
    • /
    • pp.493-498
    • /
    • 2003
  • In case of slope failure by planted protection is constructed on the slope according to of the choice trend of a recently environmental-friendly countermeasure, there has a limitation about diagnosis and preparation of measure. Also, collapse of tunnel pithead department slope has maximum in construction and countermeasure method of construction choice unlike cut-slope. In this study, analyzed inside circumstance of slope using geophysical exploration for stability analysis and countermeasure inside presentation of tunnel pithead department slope which collapse happens. geophysical exploration used dipole(Dipole-Dipole) method that is based to distribution principle does specific resistance, goes side by side with on-the-spot observation and draws base strength parameter and executed stability analysis, and presented stabilization countermeasure inside of collapse slope on this. I wish to conduce in development and research for use technical development of geophysical exploration technique hereafter by executing geophysical exploration in road collapse spot applying through this study.

  • PDF

Development of 1/60th Scale Moving Model Rig Using the Compressed Air Launcher and One-Wire Guidance System of Train Model (압축공기 발사기에 단선 와이어 유도방식을 적용한 1/60축척 터널주행 열차모형 시험기 개발에 대한 연구)

  • Kim, Dong-Hyeon;O, Il-Geun
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.25 no.5
    • /
    • pp.634-644
    • /
    • 2001
  • The test facility of a 1/60-scale model for train-tunnel systems has been recently developed to investigate the effects of tunnel portal shapes, hood shapes and air-shafts for reducing the micro-pressure waves radiating towards the surroundings from the tunnel exit. The present test rig has been advanced from a 1/70-scale facility at NLR in Netherlands. The NLR test rig has the two-wise guidance system that needs two ears attached on the external surface of a model train nose. Therefore, their train models have irregular nose shapes. The main characteristics of the present facility are that the train model is guided by only one wire from the compressed air launcher to the absorber parts of test facility and the wire guidance hole is located at the axial center of a train model. In the present test rig, after a train model is launched, the air jet from the launcher does not enter the tunnel model. Experimental results were compared with numerical predictions to prove the performance of the test facility.

The Case of Measurement for Shallow Soil Tunnel with Pre-Supported Nail Method (저토피 토사터널에 적용된 선지보 네일공법의 시공 및 계측사례)

  • Seo, Dong-Hyun;Lee, Seung-Ho
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.11
    • /
    • pp.69-79
    • /
    • 2012
  • This pre-supported nail method is able to decrease ground displacements more than NATM because this method reinforces ground with grouted steels before tunnel excavation. Therefore this method has advantage of being able to increase the stability and workability. This study presents applicability of pre-supported nail method with case of site measurement for shallow tunnel composed with high groundwater level and unconsolidated soil, performs this research the mechanism of new supporting system is compared with the conventional existing supporting system in terms of soil reinforcement. NATM has characteristics that construction stage displacement of the apparent height difference is observed in the step of divided excavation processing. Otherwise it is analyzed that pre-supported nail method is not sensitive in the displacement problem of excavation processing in comparison to NATM. It is found that this method is very applicable in shallow depth tunnel such as portal area, tunnel in soil and weak zone without arching effect.