1 |
ANSYS, Inc. (2010), ANSYS AUTODYN, Ver. 13, ANSYS Inc., USA.
|
2 |
Cho, J.W., Yu, S.H., Jeon, S.W., Chang, S.H. (2008), "Numerical study on rock fragmentation by TBM disc cutter", Journal of Korea Tunnelling Association, Vol. 10, No. 2, pp. 139-152.
과학기술학회마을
|
3 |
Gerber, E., Scheidegger, A.E. (1974), "On the dynamics of scree slopes", Rock Mechanics, Vol. 6, No. 1, pp. 25-38.
DOI
|
4 |
Go, D.C., Jung, B.R., Kim, J.M., Jung, W.G., Ryu, D.H., Song, C.R. (2010), "The study of advanced mucking method for tunnelling", The 2010 Annual Conference of Korea Tunnelling Association, pp. 212-231.
|
5 |
Kim, J.Y., Jeong, K.H., Song, C.H., Yoo, C.S. (2008), "A study on the influence of blasting-induced vibration in both adjacent rock and the concrete center wall in a 2-Arch tunnel", The 2008 Annual Conference of Korea Tunnelling Association, pp. 261-274.
|
6 |
Kim, S.R. (2003), Understanding of the classes for the mensuration by parts with using Mathematica, Pusan University of Foreign Studies, Graduate School, Master's Degree Thesis, p. 25.
|
7 |
Konya, C.J., Walter, E.J. (1991), Rock blasting and overbreak control, National highway institute, p. 430.
|
8 |
Korea Institute of Construction Technology (2011), 2011 Standard of construction estimate, Korea Institute of Construction Technology, p. 1361.
|
9 |
Korean Society for Rock Mechanics (2007), Slope engineering, Gunsul-jungbo Co., p. 525.
|
10 |
Nam, K.C., Kim, Y.S., Kim, C.H., You, K.H., Kim, S.H., Kang, B.S., Kim, J.M., Choi, J.S. (2010), Civil construction management for actual work (6 edition), Hansol Academy Publishing Co., p. 880.
|
11 |
Park, J.W. (2012), Analysis of structure subjected to blast load using parallel and domain, Hanyang University, Graduate School, Master's Degree Thesis, p. 50.
|
12 |
Riedel, W., Thoma, K., Hiermaier, S., Schmolinske, E. (1999), "Penetration of reinforced concrete by BETAB-500 numerical analysis using a new macroscopic concrete model for hydrocodes" The 9th Int. Sym. on Interaction of the Effects of Munitions with Structures, Berlin, Germany, pp. 315-322.
|
13 |
Seol, J.S., Kim, H.C., Kim, S.S., Lim, K.W., Kim, H.C., Kim, D.S., Kim, J.S., Lee, M.J., Chun, B.S., Lee, K.I., Yoon, I.S., Choi, H.S., Bae, E.H., Park, J.H., Kim, H.M., Kim, Y.N., Jeon, M.I., Cho, Y.H., Lee, K.H., Lee, S.H., Ma, S.J., Jeon, S.W., Kim, S.R., Lee, E.T., Park, Y.S., Park, G.Y., Han, M.Y., Cho, Y.W., Roh, B.G., Jung, B.R., Kang, L.S. (2009), Construction management for actual work (2 edition), Goomibook Inc., p. 1112.
|
14 |
SolidWorks Co. (2011), SolidWorks 3D, Ver. 2011, SolidWorks Co, Massachusetts, USA.
|
15 |
You, K.H., Jeon, S.W. (2012), "Prediction of rehabilitation time for a tunnel damaged by blasting", DAPS2012, The 4th International Conference on Design and Analysis of Protective Structures, Hyatt Regency, Jeju, Korea, P-T3-1.
|
16 |
Yoon, H.K. (2009), Analytic study on controlled blasting by pre-cracked notch, Inha University, Graduate School, Master's Degree Thesis, p. 116.
|
17 |
You, K.H., Kim, D.H. (2012), "A study on the influence of blasting location on tunnel fragmentation zone", 2012 Korean Geotechnical Society, Geo Expo, pp. 1611-1615.
|