A Study on Key Factors of Ground Settlement Due to Shield TBM Excavation using Numerical Analysis and Field Measurement Comparison (수치해석과 현장 계측값 비교를 통한 Shield TBM 지표침하 영향요소 검토)

  • Jun, Gychan;Kim, Donghyun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.1
    • /
    • pp.63-72
    • /
    • 2017
  • This study estimates the degree of influence of factors influencing ground surface settlement during tunnel excavation using Shield tunneling trough 3D FE-analyses. Numerical analysis was carried out by considering face pressure, skinplate pressure, excavation length, soil model, element size and soil material properties. Also, Actually constructed shield TBM comparative analysis was conducted by compared with Volume loss model, Pressure model and field measurement data. Skinplate pressure and soil model were the most influential factors, and the analysis results were similar to field measurements when the appropriate skinplate pressure was applied according to the passing stratum.

An Analysis of Wind Force Coefficient Distributions for Optimum Design of Multi-Span Arched Greenhouses (아치형 연동온실의 최적설계를 위한 풍력계수분포도의 분석)

  • 이현우;이석진
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.38 no.2
    • /
    • pp.145-151
    • /
    • 1996
  • Wind force coefficients of multi-span arched greenhouses with respect to wind direction of $0^{\circ}$ and $30^{\circ}$ were estimated to give more reasonable coefficient. The conventional and subdivided division types of wind force coefficient distribution diagrams were constructed by using the wind tunnel experimental data. Bending moments on the greenhouses were determined through structural analysis using obtained wind force coefficients, and were analyzed. Because actual wind pressure values on a face of greenhouse varied with locations, the more divisions of wind force coefficient distribution were subdivided, the better distribution type was coincided with actual state. In order to calculate the more accurate section force occurred on the arched greenhouse by the wind loads, it was recommendable that the wind force coefficient distribution should take more subdivision type. The maximum bending moment at the multi-span greenhouse frame at wind direction of $30^{\circ}$ was greater than that at O。, therefore the wind force coefficient at inclined wind direction to the wall was needed to be considered for the multi-span greenhouse structural design.

  • PDF

A study on the determination of shear strength and the support design of pre-failed rock slope (일차파괴된 암반사면의 전단강도 및 보강설계법 고찰)

  • 조태진;김영호
    • Tunnel and Underground Space
    • /
    • v.5 no.2
    • /
    • pp.104-113
    • /
    • 1995
  • Shear strength of the discontinuity on which the pre-failure of rock slope was occurred during surface excavation was measured through the direct shear test using core samples obtained in-situ. Internal friction angle was increased as the roughness of discontinuity surface(JRC) was increased. Results of the tilt test using core samples of higher JRC also showed very similar trend as those of the direct shear test. When the samples replicated from natural cores were used int he tilt test, results of friction angles showed almost perfect continuation of the residual friction angles from the direct shear test. However, when the gouge material existed in the discontinuity the internal friction angle strongly depended upon the rate of filling thickness to the height of asperity irrespective of the JRC. Based on the results of both direct shear test and tilt test internal friction angle and cohesion of discontinuity, which reflect the in-situ conditions fo pre-sliding failure and also can be used for the optimum design of support system, were assessed. Two kinds of support measures which were expected to increase the stability of rock slope were considered; lowering of slope face angle and installation of rock cable. But, it was found that the first method might lead to more unstable conditions of rock slope when the cohesion of discontinuity plane was negligibly low and in that case the support systems of any kind which could exert actual resisting force were needed to ensure the permanent stability of rock slope.

  • PDF

Geological and Geophysical Surveys for Determining Causes of Rack Slides (암반사면 사태의 원인규명을 위한 지질조사 및 전기비저항 탐사)

  • 황학수;이태섭;기원서;박종오;문창규;최정환
    • The Journal of Engineering Geology
    • /
    • v.11 no.3
    • /
    • pp.295-301
    • /
    • 2001
  • Geological and geophysical surveys were performed to examined the cause of the rock-mass slide occurred at the opening site of the Wanglim tunnel of the Seoul-Pusan High Speed Railway. The results of geophygical survey and geometrical analysis for the geological structures indicate that the rock-mass slide was triggered by the heavy rainfall which increases the groundwater level and results in high pore pressure in the N60$^{\circ}$ E-trending major fractured zone of the slope, and that the foliation dipping toward the vertical open face of the slope acted as a main sliding plane during movement.

  • PDF

Wind turbine testing methods and application of hybrid testing: A review

  • Lalonde, Eric R.;Dai, Kaoshan;Lu, Wensheng;Bitsuamlak, Girma
    • Wind and Structures
    • /
    • v.29 no.3
    • /
    • pp.195-207
    • /
    • 2019
  • This paper presents an overview of wind turbine research techniques including the recent application of hybrid testing. Wind turbines are complex structures as they are large, slender, and dynamic with many different operational states, which limits applicable research techniques. Traditionally, numerical simulation is widely used to study turbines while experimental tests are rarer and often face cost and equipment restrictions. Hybrid testing is a relatively new simulation method that combines numerical and experimental techniques to accurately capture unknown or complex behaviour by modelling portions of the structure experimentally while numerically simulating the remainder. This can allow for increased detail, scope, and feasibility in wind turbine tests. Hybrid testing appears to be an effective tool for future wind turbine research, and the few studies that have applied it have shown promising results. This paper presents a literature review of experimental and numerical wind turbine testing, hybrid testing in structural engineering, and hybrid testing of wind turbines. Finally, several applications of hybrid testing for future wind turbine studies are proposed including multi-hazard loading, damped turbines, and turbine failure.

Effects of structural characteristics of screw conveyor on spewing during EPB shield tunnelling

  • Xiaochun Zhong;Siyuan Huang;Rongguo Huai;Yikang Hu;Xuquan Chen
    • Geomechanics and Engineering
    • /
    • v.35 no.6
    • /
    • pp.571-580
    • /
    • 2023
  • During EPB shield tunnelling, construction speed and safety are severely affected by spewing. In this study, a theoretical seepage model is established to capture of the effects of screw conveyor geometry and turbulent flow on spewing. Experimental test results are used to verify the proposed theoretical seepage model. It is found that the seepage is greatly affected by the length of screw conveyor and soil permeability. The proposed model can increase the screw conveyor length and reduce soil discharge sections simultaneously, the permeability of treated muck thus decreases by one order of magnitude. By using the proposed theoretical seepage model, the criterion of critical soil permeability used to identify spewing is proposed. When the water head applied at tunnel face reaches 40 m and 50 m, the critical permeability coefficients of treated muck should be less than 10-5 m/s and 10-6 m/s to avoid spewing. For a given permeability coefficient of soil, the water flow rate is overestimated if structural characteristics of screw conveyor is not considered. Consequently, the occurrence of spewing is greatly overestimated, which increases construction cost substantially.

Application of Seismic Tomography to the Inverstigation of Underground Structure in Gupo Train Accident Area (구포 기차 전복사고 지역의 지반상태 파악을 위한 탄성파 토모그래피 응용)

  • 김중열;장현삼;김유성;현혜자;김기석
    • The Journal of Engineering Geology
    • /
    • v.5 no.1
    • /
    • pp.1-20
    • /
    • 1995
  • A train overturn accident occurred on March 1993 in the Gupo area, northern part of Pusan, unfortunately had taken a heavy toll of lives and caused a great loss of property as well. The reasons for the subsidence of the basement under the railroads, which presumed to be the main cause of the accident, have been investigated from many different angles, including conventional geotechnical investigation methods. The deduced nuin reasons of the subsidence were: 1. blasting for tunnel excavation (NATM) at about 39 meter under the railroads, and 2. unexpected change of bedrock conditions along the direction of tunnel. But this accident was derived nrranlv from the lack of geological and geotechnical information under railroad area because it was impossible to drill beneath the railroads. This paper introduces a new geophysical survey techniqueseisrnic geotomography, and shows some results of the method applying to investigate the underground structure of the accident area. This method not only overcomes the unfavourable environment which many conventional investigation methods cannot face, but produces an image of underground structure with high resolution. Furthermore, the outputs from geotomogaphic analysis could provide very valuable in-situ basic parameters (like seismic velocities, elastic moduli, etc.) which is essential to the design and construction.

  • PDF

A study for recycling plan of excavated soil and filter cake of slurry shield TBM for road construction (도로공사 이수식 쉴드 TBM 굴착토 및 필터케이크 재활용방안 연구)

  • Nam, Sung-min;Park, Seo-young;Ahn, Byung-cheol
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.599-615
    • /
    • 2022
  • In order to excavate underground tunnel most safely such as Han river, the slurry shield TBM method is applied to cope with face of high water pressure for many metro projects. In downtown subway project most of excavated soil is discharged externally whereas in road construction excavated soil is used as filling materials so it becomes important factor for success of the project. After excavated soil, weathered rock and soft rock are discharged with bentonite through discharge pipe to slurry treatment plant then those soils are separated in separation plant according to those size. Fine grained soil has been discarded together with filter cake but it is not toxic and can be mixed with coarse aggregate in proper ratio so this study is performed to find use of qualified filling material to meet quality standard. Therefore, in this study, legal standards and quality standards for the utilization of excavated soil of the slurry shield TBM method were examined and test was conducted to derive recycling way for filter cake and aggregate. And a plan for using it as a filling material for road construction was derived. Because bentonite is a clay composed of montmorillonite, and the excavated soil in the tunnel is also non-toxic, disposal of this material can waste social cost so it is expected to be helpful in the underground space development project that carries out the TBM project by recycling it as a valuable resource.

Effect of seawater on the applicability of a slurry shield TBM (해수가 슬러리 쉴드 TBM 공법 적용성에 미치는 영향)

  • Ryu, Young-Moo;Kim, Hae-Mahn;Kim, Do-Hyung;Lee, In-Mo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.2
    • /
    • pp.243-256
    • /
    • 2019
  • Formation of filter cake with little slurry penetration into the tunnel face ground is an essential factor to successfully apply the slurry shield tunnel boring machine (TBM) for tunnelling work. However, when the bentonite slurry is in contact with seawater, it is not easy to guarantee the filter cake formation due to decrease of the swelling volume and viscosity of the slurry. In this study, in order to evaluate the effect of the seawater on the applicability of the slurry shield TBM method, the slurry injection tests were carried out with the variation of seawater percentage contained in the slurry samples as well as the variation of soil types. And then, the effect of these two factors on the slurry clogging phenomena was theoretically and experimentally figure out. As a result, it was found that the value of the slurry clogging criteria (SCC) indicating the applicability of the slurry shield TBM significantly decreases up to 67% as the percentage of seawater increases from 0% up to 20%. In addition, it was found to be necessary to take into account both the characteristics of slurry and soil types together when judging the applicability of the slurry shield TBM method by assessing the slurry penetration characteristics that will occur during tunnelling work.

Numerical analysis on the estimation of optimal disc cutter angle in transition cutter zone (전이 구간(트렌지션 커터존)의 최적 디스크커터 각도 산정에 관한 수치해석 연구)

  • Lee, Sang Yun;Song, Ki-il
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.1
    • /
    • pp.1-12
    • /
    • 2021
  • In the design of a tunnel boring machine (TBM), the excavation efficiency of the equipment depends on the design of the cutter head, which is directly in contact with the ground. Especially, the allocation of disc cutter is crucial issue. Disc cutters can be divided into center cutter zone, inner cutter zone and transition cutter zone depending on where they are placed. Many studies have been conducted to identify optimal cutting conditions for face cutters. However, research to determine the optimal cutting conditions for the transition cutter has been relatively incomplete. In this study, to identify the optimal cutting conditions for the transition cutter, numerical analysis using discrete element method was performed, and the specific energy curve according to the angle between the transition cutters was drawn to find out the optimum cutting conditions. The results show that the angle between the transition cutters showing minimum specific energy in the transition cutter zone is 9°. Transition cutter zone was divided into three sections according to the slope angle of the transition cutter. It is also found that, the greater the slope angle of the transition cutter. This finding shows good agreement with the present design of transition cutter zone.