1 |
Chnag, S.B. (2015), A Study of Shield TBM Tunnelling-induced Volume Loss Estimation Considering Shield Machine Configurations and Driving Data, TUNNEL & UNDERGROUND SPACE Vol.25, No.5.
|
2 |
Cho, J.S. (2008), Analysis of ground movements and lining segment in shield TBM based on three dimensional finite element method, Pukyong National University.
|
3 |
FHWA, 2009, Road Tunnel Manual (FHWA-NHI-09-010)
|
4 |
Jun, G.C., Kim, D.H. (2016), A Intercomparison on the estimating shield TBM tunnel face pressure through analytical and numerical analysis, J of Korean Tunn Undergr Sp Assoc, Vol.18 No.3.
|
5 |
Jun, G.C., Kim, D.H. (2015), A study on key factors of ground surface settlement due to shield TBM.
|
6 |
LIM KEN CHAI (2003), Three-dimensional finite element analysis of earth pressure balance tunnelling, National university of singapore.
|
7 |
Park, H.K., Chang, S.B., and Lee, S.B. (2015), A Study of Shield TBM Tunnelling-induced Volume Loss Estimation Considering Shield Machine Configurations and Driving Data, Samsung C&T Corp. excavation using 3-dimension numerical analysis, J of Korean Tunn Undergr Sp Assoc, Vol.17 No.3
|
8 |
SVEN CHRISTIAN MOLLER. (2006), Tunnel induced settlements and structural forces in linings, Eigenverlag des Instituts fur Geotechnik.
|