• 제목/요약/키워드: Tunnel boring machine

검색결과 104건 처리시간 0.023초

분당선 철도 한강 하저터널에서 대구경 쉴드장비 선정 (Determination of a large shield TBM for a tunnel under the Han river in the Bundang railway)

  • 김용일;김동현;조상국
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2003년도 추계학술대회 논문집(II)
    • /
    • pp.569-578
    • /
    • 2003
  • In this paper a determination of the optimal excavation method and machine type for a tunnel under the Han river between the Sungsoo-dong, Sungdong-Gu and the Chungdaw-dong, Kangnam-Gu in the Bundang railway. The geological investigation results show that some fractured zones exist locally under the northern boundary of the Han river bed, but the other regions consist mostly of hard rocks of good quality in the tunnel excavation level. Also, a hign water pressure of $5kgf/cm^2$ and a flash inflow of river water due to old boring holes are expected during tunnel excavation. A EPB shield TBM is selected as a optimal excavation machine for the Han river tunnel considering the geological and ,site conditions.

  • PDF

Technology to reduce water ingress for TBM cutterhead intervention

  • Ham, Soo-Kwon;kim, Beom-Ju;Lee, Seok-Won
    • Geomechanics and Engineering
    • /
    • 제29권3호
    • /
    • pp.321-329
    • /
    • 2022
  • Tunnel site where high water pressure is applied, such as subsea tunnel, generally selects the shield TBM (Tunnel Boring Machine) to maintain the tunnel excavation face. The shield TBM has cutters installed, and the cutters wear out during the process of excavation, so it should be checked and replaced regularly. This is called CHI (Cutterhead Intervention). The conventional CHI under high water pressure is very disadvantageous in terms of safety and economics because humans perform work in response to high water pressure and huge water inflow in the chamber. To overcome this disadvantage, this study proposes a new method to dramatically reduce water pressure and water ingress by injecting an appropriate grout solution into the front of the tunnel face through the shield TBM chamber, called New Face Grouting Method (NFGM). The tunnel model tests were performed to determine the characteristics, injection volume, and curing time of grout solution to be applied to the NFGM. Model test apparatus was composed of a pressure soil tank, a model shield TBM, a grout tank, and an air compressor to measure the amount of water inflow into the chamber. The model tests were conducted by changing the injection amount of the grout solution, the curing time after the grout injection, and the water/cement ratio of grout solution. From an economic point of view, the results showed that the injection volume of 1.0 L, curing time of 6 hours, and water/cement ratio of the grout solution between 1.5 and 2.0 are the most economical. It can be concluded that this study has presented a method to economically perform the CHI under the high water pressure.

수팽창 지수재의 방수 성능 및 내구성 평가 (Evaluation of waterproof and durability of hydrophilic waterstop)

  • 최우용;이현필;전기찬;이석원
    • 한국터널지하공간학회 논문집
    • /
    • 제16권2호
    • /
    • pp.117-124
    • /
    • 2014
  • 최근 국내에서는 쉴드 TBM (Tunnel Boring Machine)을 이용한 터널 굴착에 대한 관심이 크게 증가하고 있다. 쉴드 TBM 터널은 비배수 터널로써 세그먼트 이음부에서 누수가 발생할 경우에는 터널의 사용성 및 안정성에 문제가 될 수 있다. 본 연구에서는 첫째로 쉴드 TBM 터널의 세그먼트 시공 시 시공오차 및 세그먼트 과다변형에 의한 수팽창 지수재의 방수 성능 변화를 알아보았고, 두 번째로 지하수와 해수에 있을 수 있는 황산염과 염화물에 의한 수팽창 지수재의 내구성 저하를 알아보았다. 시험결과, 체결각 불합치가 $2^{\circ}$이상으로 시공 오차가 발생한 경우에는 수팽창 지수재의 차수 능력을 기대하기는 어려운 것으로 판단된다. 또한 수팽창 지수재가 황산마그네슘 용액에 장시간 노출될 경우에는 지수재의 내구 성능에 문제가 있을 수 있을 것으로 판단된다.

쉴드 TBM 세그먼트 지수재의 배열수 변화에 따른 방수성능 평가 (Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop)

  • 함수권;정훈;김범주;정경한;이석원
    • 한국터널지하공간학회 논문집
    • /
    • 제22권1호
    • /
    • pp.47-58
    • /
    • 2020
  • 최근 국내에서는 쉴드 TBM (Tunnel Boring Machine)을 이용한 터널 굴착에 대한 관심이 크게 증가하고 있다. 쉴드 TBM 터널은 비배수 터널로써 세그먼트 이음부에서 누수가 발생할 경우에는 터널의 사용성 및 안정성에 문제가 될 수 있다. 본 연구에서는 쉴드 TBM 터널의 세그먼트 시공 시 시공오차 및 세그먼트 과다변형에 의한 수팽창 지수재의 방수 성능을 검토하였다. 특히, 수팽창 지수재 1열 배열 및 2열 배열 각각에 대하여 방수 성능을 검토하여, 2열배열의 효율성을 검증하였다. 실험결과, 1열 배열 및 2열 배열 수팽창 지수재는 동일한 방수 성능을 보였다. 즉, 1열 배열 및 2열 배열 모두, 수팽창 지수재는 엇갈림에 대해서는 대응성이 좋으나, 틈새 간격에 대해서는 대응성이 불리한 것으로 나타났다.

세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가 (Waterproofing performance evaluation according to each waterproofing material due to segment construction error)

  • 허승무;정훈;이석원
    • 한국터널지하공간학회 논문집
    • /
    • 제20권6호
    • /
    • pp.1023-1037
    • /
    • 2018
  • 최근 국내에서는 쉴드 TBM (Tunnel Boring Machine)을 이용한 터널 굴착에 대한 관심이 크게 증가하고 있다. 쉴드 TBM 터널은 비배수 터널로써 세그먼트 이음부에서 누수가 발생할 경우에는 터널의 사용성 및 안정성에 문제가 될 수 있다. 본 연구에서는 쉴드 TBM 터널의 세그먼트 시공 시 시공오차 및 세그먼트 과다변형에 의한 수팽창 지수재 및 가스켓 각각의 방수 성능을 검토하였다. 실험결과, 수팽창 지수재는 엇갈림에 대해서는 대응성이 좋으나, 틈새 간격에 대해서는 대응성이 불리한 것으로 나타났다. 반면에 가스켓은 틈새 간격에 대해서는 대응성이 좋으나, 엇갈림에 대해서는 대응성이 불리한 것으로 나타났다.

장대 터널의 계획과 설계 (Construction Planning and Design of a Long Tunnel)

  • 장석부;윤영훈;김용일;김진한
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2000년도 봄 학술발표회 논문집
    • /
    • pp.117-124
    • /
    • 2000
  • This paper presents the construction planning and the detail design of a 16.2 km long railroad tunnel in a mountainous area. Major design conditions for railroad are the single track, loop-typed alinement, and a maximum grade of 24.5$\textperthousand$. A underground station(double track) with a length of 1.1km is located in the middle of the line for train cross-passing. Tunnel is excavated in highly complex geological conditions including faulted areas, abandoned mine works areas, and various rock types such as sandstone, shale, limestone, and coal seam partly. Drilling and blasting method was adopted because it is more flexible than TBM(Tunnel Boring Machine) as a result of risk assessment for geological conditions in this area. Two working adits were planned to adjust the construction schedule and can be used for ventilation and maintenance in operation phase. New material and concept were introduced to the tunnel drain design. They are expected to improve tunnel drain condition and capability. Rational tunnel support design was tried to consider the various tunnel size and purpose and to use the geological investigation results.

  • PDF

3차원 입자결합모델을 이용한 디스크 커터의 암석절삭에 관한 연구 (Three Dimensional Numerical Analysis on Rock Cutting Behavior of Disc Cutter Using Particle Flow Code)

  • 이승중;최성웅
    • 터널과지하공간
    • /
    • 제23권1호
    • /
    • pp.54-65
    • /
    • 2013
  • 선형절삭시험(Linear Cutting Machine)은 TBM(Tunnel Boring Machine)에서의 디스크 커터 설계와 굴진성능 예측을 위한 가장 신뢰성 있는 시험 중의 하나로서, 실대형 암석시료를 대상으로 실제의 커터 하중을 예측할 수 있는 장점을 갖고 있지만, 시료의 채취 및 운반이 용이하지 않고, 1회 시험에 많은 비용이 소요되는 단점을 갖고 있다. 최근 선형절삭시험이 갖는 이러한 경제적 시간적 제약점들을 극복할 수 있는 현실성 있는 수치모델의 개발에 관한 연구가 활발히 진행되고 있다. 본 연구에서는 3차원 입자결합모델을 이용하여 디스크 커터의 절삭에 의한 부산 응회암의 파쇄양상과 최적 커터간격을 도출하였다. 본 해석에서 분석된 비에너지는 $14.3MJ/m^3$ 일 때 최소값을 나타냈다. 이때의 최적의 s/p 비는 약 16 으로 분석되었으며, 부산응회암의 선형절삭시험 및 유한요소법에 의한 수치해석 연구결과와 유사한 경향을 나타냈다.

TBM 굴진향상을 위한 연속굴착형 TBM 부품개조 및 제어기술 소개 (Continuous Excavation Type TBM Parts Modification and Control Technology for Improving TBM Performance)

  • 최영태;이동건;김문규;오주영;조정우
    • 터널과지하공간
    • /
    • 제32권6호
    • /
    • pp.345-352
    • /
    • 2022
  • 도심지 터널 건설에서 발파공법은 민원이 제기되는 문제점이 있어 적용에 제약받고 있다. 이에 대한 대안으로 TBM 및 기계굴착 공법 적용이 필수적으로 검토되고 있다. 이 중 쉴드 TBM(Tunnel Boring Machine)은 굴진과 세그먼트 체결이 번갈아 반복되며 굴진하는 공정을 가지고 있는데, 세그먼트 체결 동안 굴진을 멈추게 된다. 이러한 가동 정지시간을 최소화하고자 세그먼트 체결 중에도 가동할 수 있는 연속굴착형 TBM 기술이 개발되고 있다. 나선형 세그먼트의 굴진 반력을 확보하기 위해 추진잭을 개조하고 신뢰성을 확보하는 연구가 진행 중이다. 또한 체결 중 세그먼트를 제외한 나머지 부분의 추진잭을 가동하는 유압제어 및 유압시스템 설계기술이 개발될 예정이다. 본 보고는 연속굴착형 TBM 과제 중 부품개조 및 유압제어 기술에 대한 일부 내용을 소개한다.

수직구의 상향굴착을 위한 RBM 굴진성능의 분석 (Analysis of RBM한s Penetration Capacity for Upward reaming of Shaft)

  • 이석원;조만섭;서경원;배규진
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 봄 학술발표회 논문집
    • /
    • pp.157-164
    • /
    • 2002
  • Based on the results of prototype air-shaft construction, penetration capacity of RBM(Raise Boring Machine) was analyzed and compared with TBM(Tunnel Boring Machine) performance in this study. Utilization, down time, net penetration rate and advance rate were evaluated and compared. By conducting the laboratory tests for rock properties with the analysis of penetration capacity, relation of penetration capacity and geotechnical parameters was studied. The results showed that much more higher value of utilization, however lower value of net penetration rate for RBM was obtained compared to those of TBM. In addition, as the strength of rock penetrated increased, higher value of net penetration rate was obtained contrarily to the results of TBM performance. Finally, new relationship between total hardness and net penetration rate for weak and weathered rock was derived from these results.

  • PDF

특수지반에서 쉴드TBM의 시공을 위한 기술적 고찰 (Review of Technical Issues for Shield TBM Tunneling in Difficult Grounds)

  • 정호영;장난;전석원
    • 터널과지하공간
    • /
    • 제28권1호
    • /
    • pp.1-24
    • /
    • 2018
  • 국내외 터널공사에서 TBM(Tunnel Boring Machine)의 적용사례가 지속적으로 증가하고 있다. 이에 따라 TBM터널은 더 어렵고 복잡한 특수지반을 대상으로 시공되는 사례가 많으며, 복잡한 지질 조건에 기인한 시공상의 어려움이 꾸준히 보고되고 있는 실정이다. 국내에서는 아직까지 특수 지반의 효율적 통과에 대한 연구가 미진한 실정이다. 이 논문에서는 특수지반을 대상으로 하는 쉴드TBM 터널공사에서의 지반조사와 시공과 관련된 사항에 대하여 고찰하였다. 국내외 특수지반을 통과한 시공 사례를 분석하여 쉴드TBM 터널의 특수지반을 11개로 분류하였고, 각각의 특수지반의 개념과 일반적인 문제점들을 정리하였다. 특히 도심지 천층부에서 빈번하게 조우하는 복합지반, 호박돌층, 단층파쇄대의 분류 기법, 지반조사기법, 그리고 해당지반에서의 고려사항들을 논의하였고, 향후 연구방향에 대하여 제안하였다. 본 논문은 특수지반에서의 TBM 시공기술 발전을 위한 기초연구로써 향후 관련 연구와 특수지반에서의 TBM 시공에 도움이 될 것으로 기대된다.