Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop  

Ham, Soo-Kwon (Dept. of Civil and Environmental Engineering, Konkuk University)
Jung, Hoon (Dept. of Civil and Environmental Engineering, Konkuk University)
Kim, Beom-Ju (Dept. of Civil and Environmental Engineering, Konkuk University)
Jeong, Kyeong-han (The Dream E & C)
Lee, Seok-Won (Dept. of Civil and Environmental Engineering, Konkuk University)
Publication Information
Journal of Korean Tunnelling and Underground Space Association / v.22, no.1, 2020 , pp. 47-58 More about this Journal
Abstract
The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop by the construction error and excessive displacement of segment was studied. In particular, the waterproof capacity of each of single and double layer arrangements of hydrophilic rubber waterstop was examined to verify the efficiency of the double layer arrangement. The test results show that the single layer and double layer hydrophilic rubber waterstop showed the same waterproof performance. hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap.
Keywords
Hydrophilic rubber waterstop; Number of layer of waterstop; Shield TBM; Waterproofing; Segment lining;
Citations & Related Records
Times Cited By KSCI : 2  (Citation Analysis)
연도 인용수 순위
1 Choi, W.Y., Lee, H.P., Jun, G.C., Lee, S.W. (2014), "Evaluation of waterproof and durability of hydrophilic waterstop", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 2, pp. 117-124.   DOI
2 Heo, S.M., Jung, H., Lee, S.W. (2018), "Waterproofing performance evaluation according to each waterproofing material due to segment construction error", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 6, pp. 1023-1037.   DOI
3 Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012), "Risk management applicable to shield TBM tunnel: I. Risk factor analysis", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 6, pp. 667-681.   DOI
4 Kim, S.H., Kim, W.K., Lee, H.Y. (2013), "Effect of segment thickness during shield TBM tunnelling in case study", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 311-320.   DOI
5 Kim, Y.I., Hencher, S.R., Yoon, Y.H., Cho, S.K. (2002), "Determination of the construction method for Young Dong tunnel by risk assessment", Journal of Korean Tunnelling and Underground Space Association, Vol. 4, No. 1, pp. 13-25.
6 Lee, S.W., Jeoung, J.H., Hwang, J.H. (2009), "Evaluation of hydrophilic waterstop for shield TBM tunnel under high water pressure", Proceedings of the Korean Geo-Environmental Conference, Seoul, pp. 389-392.