Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop |
Ham, Soo-Kwon
(Dept. of Civil and Environmental Engineering, Konkuk University)
Jung, Hoon (Dept. of Civil and Environmental Engineering, Konkuk University) Kim, Beom-Ju (Dept. of Civil and Environmental Engineering, Konkuk University) Jeong, Kyeong-han (The Dream E & C) Lee, Seok-Won (Dept. of Civil and Environmental Engineering, Konkuk University) |
1 | Choi, W.Y., Lee, H.P., Jun, G.C., Lee, S.W. (2014), "Evaluation of waterproof and durability of hydrophilic waterstop", Journal of Korean Tunnelling and Underground Space Association, Vol. 16, No. 2, pp. 117-124. DOI |
2 | Heo, S.M., Jung, H., Lee, S.W. (2018), "Waterproofing performance evaluation according to each waterproofing material due to segment construction error", Journal of Korean Tunnelling and Underground Space Association, Vol. 20, No. 6, pp. 1023-1037. DOI |
3 | Hyun, K.C., Min, S.Y., Moon, J.B., Jeong, G.H., Lee, I.M. (2012), "Risk management applicable to shield TBM tunnel: I. Risk factor analysis", Journal of Korean Tunnelling and Underground Space Association, Vol. 14, No. 6, pp. 667-681. DOI |
4 | Kim, S.H., Kim, W.K., Lee, H.Y. (2013), "Effect of segment thickness during shield TBM tunnelling in case study", Journal of Korean Tunnelling and Underground Space Association, Vol. 15, No. 3, pp. 311-320. DOI |
5 | Kim, Y.I., Hencher, S.R., Yoon, Y.H., Cho, S.K. (2002), "Determination of the construction method for Young Dong tunnel by risk assessment", Journal of Korean Tunnelling and Underground Space Association, Vol. 4, No. 1, pp. 13-25. |
6 | Lee, S.W., Jeoung, J.H., Hwang, J.H. (2009), "Evaluation of hydrophilic waterstop for shield TBM tunnel under high water pressure", Proceedings of the Korean Geo-Environmental Conference, Seoul, pp. 389-392. |