1 |
Kim, Y.K., 2017, Key issue and technical dilemma of selection of TBM type - EPB vs. Slurry, Magazine of Korean Tunnelling and Underground Space Association, Vol. 19, No. 2, 39-51.
|
2 |
Kovari, K., Ramoni, M., 2006, Urban tunnelling in soft ground using TBMs, International Conference and Exhibition on Tunnelling and Trenchless Technology: Tunnelling and trenchless technology in the 21st century, Subang Jaya-Selangor, Malaysia, 17-31.
|
3 |
Lee, S.D., Jeong, H.Y, Jeon, S., 2012, Determination of rock abrasiveness using Cerchar abrasiveness test, Tunnel and Underground Space, Vol. 22, No. 4, 284-295.
DOI
|
4 |
Lee, K.H., Seo, H.J., Park, J.J., Park, J.H., Lee, I.M., 2016, A probabilistic assessment of ground condition prediction ahead of TBM tunnels combining each geophysical prediction method, J. of Korean Tunn Undergr Sp Assoc, 18(3), 257-272.
DOI
|
5 |
Li, S.C., Liu, B., Xu, X.J., Nie, L.C., Liu, Z.Y., Song, J., Sun, H.F., Chen, L., Fan, K.R., 2017, An overview of ahead geological prospecting in tunneling, Tunnelling and Underground Space Technology, Vol. 63, 69-94.
|
6 |
McFeat-Smith, I., 2016, TBM tunnelling in extreme geological conditions: from mixed ground conditions in Asia's urban areas to challenges in the Himalayas, International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs 2016), Istanbul, Turkey.
|
7 |
Paltrinieri, E., Sandrone, F., Zhao, J., 2016, Analysis and estimation of gripper TBM performances in highly fractured and faulted rocks, Tunnelling and Underground Space Technology, Vol. 52, 44-61.
|
8 |
Poot, S., Boone, S.J., Westland, J., Pennington, B., 2000, Predicted Boulder Frequency Compared to Field Observations during Construction of Toronto's Sheppard Subway, In: Proceedings of Tunneling Association of Canada 2000 Conference, 47-54.
|
9 |
Ringen, A., 2016, Compaction and Jet. Grouting, Breakthroughs in Tunneling Short Course, University of Colorado, September 14, Colorado, USA.
|
10 |
Sandell, T., 2017, Rondout West Branch Bypass Tunnel Advancements in Mechanized Excavation A TBM Boring in hard rock against high water pressure and high water inflows beneath the Hudson River in New York, Proceedings of ITA-AITES World Tunnel Congress 2013 (WTC 2013), Bergen, Norway.
|
11 |
Santi, P.M., 2006, Field Methods for Characterizing Weak Rock for Engineering, Environmental and Engineering Geoscience, Vol. 12, No. 1, 1-11.
DOI
|
12 |
Shirlaw, J.N., 2015, Pressurized TBM Tunnelling in mixed face conditions resulting from tropical weathering of igneous Rock, International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs 2015), Singapore.
|
13 |
Toth, A., Gong, Q.M, Zhao, J., 2013, Case studies of TBM tunneling performance in rock-soil interface mixed ground", Tunnelling and Underground Space Technology, Vol. 38, 140-150.
|
14 |
Shirlaw, J.N., 2016, Pressurised TBM tunnelling in mixed face conditions resulting from tropical weathering of igneous rock, Tunnelling and Underground Space Technology, Vol. 57, pp. 225-240.
|
15 |
Steingrimsson, J.H., GrOv, E., Nilsen, B., 2002, The significance of mixed-face conditions for TBM performance, World Tunnelling, 15, 435-441.
|
16 |
Terzaghi, K., 1950, Chapter 11: Geologic aspects of soft ground tunneling. Applied sedimentation. Wiley, New York.
|
17 |
Thewes, M., 2004, Schildvortrieb mit Flussigkeits-oder Erddruckstützung in Bereichen mit Gemischter Ortsbrust aus Fels und Lockergestein, Geotechnik, Vol. 27, No. 2, pp. 214-219.
|
18 |
Thewes, M., Hollmann, F., 2015, Clogging of TBMs in clay soils and clay-rich rock, International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs 2015), Singapore.
|
19 |
Tunnel Business Magazine, 2016, TBM Tunneling the Chengdu Metro, Benjamin Media, Inc. http://tunnelingonline.com/tbm-tunneling-chengdu-metro/
|
20 |
Vergara, I.M., Saroglou, C., 2017, Prediction of TBM performance in mixed-face ground conditions, Tunnelling and Underground Space Technology, Vol. 69, 116-124.
|
21 |
Yagiz, S., 2006, TBM performance prediction based on rock properties", Proceedings of Multiphysics Coupling and Long Term Behavior in Rock Mechanics, EUROCK, Vol. 6, 663-670.
|
22 |
Zhao, J., Gong, Q.M., 2006, Rock Mechanics and Excavation by Tunnel Boring Machine - issues and challenges, Proceedings of the ISRM International Symposium 2006 and the 4th Asian Rock Mechanics Symposium, Singapore.
|
23 |
Yagiz, S., 2008, Utilizing rock mass properties for predicting TBM performance in hard rock condition, Tunnelling and Underground Space Technology, Vol. 23, No. 3, 326-339.
|
24 |
Yagiz, S., Karahan, H., 2011, Prediction of hard rock TBM penetration rate using particle swarm optimization, Rock Mechanics and Mining Science, Vol. 48, No. 3, 427-433.
|
25 |
Zarei, H.R, Sharifzadeh, M., Uromyehic, A., 2011, Gas ground risks and geological investigations for TBM tunneling in Iran, First Asian and 9th Iranian Tunneling symposium, Tehran, Iran.
|
26 |
Zhao, J., Gong, Q.M., Eisensten, Z., 2007, Tunnelling through a frequently changing and mixed ground: A case history in Singapore, Tunnelling and Underground Space Technology, Vol. 22, 388-400.
|
27 |
Zhao, J., Gong, Q.M., 2015, TBM tunneling under adverse geological conditions - An overview, Keynote lecture, International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs 2015), Singapore.
|
28 |
Zhang, C.S., Liu, N., Chu, W.J., 2016, Key technologies and risk management of deep tunnel construction at Jinping II hydropower station, Journal of Rock Mechanics and Geotechnical Engineering, Vol. 8, No. 4, 499-512.
|
29 |
American Association of State Highway and Transportation Officials (AASHTO), 1988, Manual on Subsurface Investigations, Washington, D.C.
|
30 |
Amoun, S., Sharifzadeh, M., Shahriar, K., Rostami, J., 2015, Soil abrasiveness for EPB-TBM along Tehran metro tunnel line 7, Iran, World Tunnelling Congress, ITA WTC, Dubrovnik, Croatia, May.
|
31 |
ASTM, 2011, Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification System) (D2487-11)
|
32 |
Barla, G., S. Pelizza, S., 2000, TBM tunnelling in difficult ground conditions, GeoEng2000 - An International Conference on Geotechnical & Geological Engineering, Melbourne, Australia.
|
33 |
Barla, G., 2001, Tunnelling Under Squeezing Rock Conditions, Eurosummer-School in Tunnel Mechanics, Innsbruck, Logos Verlag, Berlin, 169-268.
|
34 |
Barton, N., 2000, TBM Tunnelling in Jointed and Faulted Rock, Rotterdam: Balkema.
|
35 |
Barton, N.R., Lien, R., Lunde, J., 1974, Engineering classification of rock masses for the design of tunnel support. Rock Mechanics and Rock Engineering, 6, 189-236.
|
36 |
Barzegari, G., Uromeihy, A., Zhao, J., 2014, EPB tunneling challenges in bouldery ground: a new experience on the Tabriz metro line 1, Bulletin of Engineering Geology and the Environment, 73, 429-440.
|
37 |
Bilgin, N., Ates, U., 2016, Probe Drilling Ahead of Two TBMs in Difficult Ground Conditions in Turkey, Rock Mechanics and Rock Engineering, Vol. 49, No. 7, 2763-2772.
|
38 |
Bayati, M., Hamidi, K.J., 2017, A case study on TBM tunnelling in fault zones and lessons learned from ground improvement, Tunnelling and Underground Space Technology, Vol. 63, 162-170.
|
39 |
Bieniawski, Z.T., 1976, Rock mass classifications in rock engineering. Proceedings Symposium on Exploration for Rock Engineering, Rotterdam, 97-106.
|
40 |
Bilgin, N., Algan, M., 2012, The performance of a TBM in a squeezing ground at Uluabat, Turkey, Tunnelling and Underground Space Technology, Vol. 32, 58-65.
|
41 |
Boone, S.J., Westland, J., Busbridge, J.R., Garrod, B., 1998, Prediction of Boulder Obstructions, In: Tunnels & Metropolises, Proceedings of World Tunnelling Congress 1998, 817-822.
|
42 |
Broere, W., 2016, Urban underground space: Solving the problems of today's cities, Tunnelling and Underground Space Technology, Vol. 55, 4-17.
|
43 |
Delisio, A., Zhao, J., 2014, A new model for TBM performance prediction in blocky rock conditions, Tunnelling and Underground Space Technology, Vol. 43, 440-452.
|
44 |
Delisio, A., Zhao, J., Einstein, H.H., 2013, Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel, Tunnelling and Underground Space Technology, Vol. 33, 131-142.
|
45 |
Diponio M.A., Chapman D., Bournes C., 2007, EPB Tunnel Boring Machine Design for Boulder Conditions, In: Proceedings of 2007 Rapid Excavation and Tunneling Conference, Traylor M.T. & Townsend J.W. (Eds), SME, Littleton, Colorado, R2007.20, 215-228.
|
46 |
Diponio, M.A., 2016, Personal communication.
|
47 |
Gharahbagh, E.A., Rostami, J., Palomino, A.M., 2011, New soil abrasion testing method for soft ground tunneling applications, Tunnelling and Underground Space Technology, 26, 604-613.
|
48 |
Dong, A., Ma, G., Gong, Q.M., Zhao, J., 2006, Numerical simulation on rock cutter performance in mixed ground, Geoshanghai 2006, 199-204.
|
49 |
Fang, Y., Deng, R.Y., Walton, G., Wang, S.M., 2017, Performance of slurry TBM tunnelling in sandy cobble ground - A case study in Lanzhou, International Conference on Tunnel Boring Machines in Difficult Grounds (TBM DiGs 2017), Wuhan, China.
|
50 |
Filba, M., Salvany, J.M., Jubany, J., Carrasco, L., 2016, Tunnel boring machine collision with an ancient boulder beach during the excavation of the Barcelona city subway L10 line: A case of adverse geology and resulting engineering solutions, Engineering Geology, Vol. 200, 31-46.
|
51 |
Goss, C.M., 2002, Predicting Boulder Cutting in Soft Ground Tunneling, Proceedings of North American Tunneling 2002, Rotterdam: Balkema, 37-46.
|
52 |
Guglielmetti, V., Grasso, P., Mahtab, A., Xu, S., 2007, Mechanized Tunnelling in Urban Areas: Design methodology and construction control, Taylor & Francis Group, London.
|
53 |
Gong, Q. M., Yin, L. J., She, Q. R., 2013, TBM tunneling in marble rock masses with high in situ stress and large groundwater inflow: A case study in China. Bulletin of Engineering Geology and the Environment, Vol. 72, No. 2, 163-172.
DOI
|
54 |
Gong, Q.M., Liu, Q.S., Zhang, Q.B., 2016, Tunnel boring machines (TBMs) in difficult grounds, Tunnelling and Underground Space Technology, Vol. 57, 1-3.
|
55 |
Habimana, J., Labiouse, V., Descoeudres, F., 2002, Geomechanical characterisation of cataclastic rocks: experience from the Cleuson-Dixence project, International Journal of Rock Mechanics and Mining Sciences, Vol. 39, 677-693.
|
56 |
Heuer, R.E., 1974, Important parameters in soft ground tunneling, proceedings of specialty conference on subsurface exploration for underground excavation and heavy construction. ASCE, New York.
|
57 |
Hamidi, J.K., Shahriar, K., Rezai, B., Rostami, J., 2010, Performance prediction of hard rok TBM using Rock Mass Rating (RMR) system, Tunnelling and Underground Space Technology, Vol. 25, No. 4, 333-345.
|
58 |
Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A., 2009, Developing new equations for TBM performance prediction in carbonateargillaceous rocks: a case history of Nowsood Water conveyance tunnel, Geomechanics and Geoengineering, Vol. 4, No. 4, 287-297.
DOI
|
59 |
Hassanpour, J., Rostami, J., Khamehchiyan, M., Bruland, A., Tavakoli, H.R., 2010, TBM performance Analysis in Pyroclastic Rocks: A Case History of Karaj Water Conveyance Tunnel, Geomechanics and Geoengineering, Vol. 43, No. 4, 427-445.
|
60 |
Hassanpour, J., Rostami, J., Zhao, J., 2011, A new hard rock TBM performance prediction model for project planning, Vol. 25, No. 5, 595-603.
|
61 |
Hoek, E., Brown, E.T., 1998, Practical estimates of rock mass strength, International Journal of Rock Mechanics and Mining Sciences, 34, 1165-1186.
|
62 |
Hunt, S.W., 2002, Compensation for Boulder Obstructions. L. Ozdemir (ED), In: Proceedings of The North American Tunneling 2002, Ozdemer L., (Ed), Rotterdam: Balkema, 23-36.
|
63 |
Hunt, S.W., 2017, Tunneling in cobbles and boulders, Breakthroughs in Tunneling, Short Course, Colorado School of Mines, August 14-16, Chicago, USA.
|
64 |
Hunt, S.W., Del Nero, D.E., 2011, Tunneling in cobbles and boulders, Breakthroughs in Tunneling, Short Course, Colorado School of Mines, September 19-21, Colorado, USA.
|
65 |
Jee, W.W., Ha, S.G., 2007, Feasible Boulder treatment methods for soft ground shielded TBM, Proceedings of World Tunneling Congress 2007, Taylor & Francis Group, London, 217-222.
|
66 |
Kieffer, D.S., Leelasukseree, C., Mustoe, G.G.W., 2008, Disc cutter performance in boulder laden ground, Proceedings of North American Tunneling 2008, 129-136.
|
67 |
Kang, Y.K., Choi, I.C., 2015, Economic Feasibility of Common Utility Tunnel based on Cost-Benefit Analysis, Journal of Korean Society of Safety. Vol. 30, No. 5, 29-36.
DOI
|
68 |
KICT, 2010, TBM Technology Development for Mechanized and Automated Tunnel Construction, Research Report, Korea Institute of Construction Technology.
|