• Title/Summary/Keyword: Tunnel Monitoring

Search Result 352, Processing Time 0.025 seconds

Effect of spatial characteristics of a weak zone on tunnel deformation behavior

  • Yoo, Chungsik
    • Geomechanics and Engineering
    • /
    • v.11 no.1
    • /
    • pp.41-58
    • /
    • 2016
  • This paper focuses on the deformation behavior of tunnels crossing a weak zone in conventional tunneling. A three-dimensional finite element model was adopted that allows realistic modeling of the tunnel excavation and the support installation. Using the 3D FE model, a parametric study was conducted on a number of tunneling cases with emphasis on the spatial characteristics of the weak zone such as the strike and dip angle, and on the initial stress state. The results of the analyses were thoroughly examined so that the three-dimensional tunnel displacements at the tunnel crown and the sidewalls can be related to the spatial characteristic of the weak zone as well as the initial stress state. The results indicate that the effectiveness of the absolute displacement monitoring data as early warning indicators depends strongly on the spatial characteristics of the weak zone. It is also shown that proper interpretation of the absolute monitoring data can provide not only early warning for a weak zone outside the excavation area but also information on the orientation and the extent of the weak zone. Practical implications of the findings are discussed.

Improvement of Domestic Design Criteria of Tunnel Maintenance Monitoring and Latest Technology Trend (터널 유지관리 계측의 국내설계기준 개선 및 최신 기술동향)

  • Baek, Kyung Jong;Kwon, Young Eok
    • Journal of Korean Society of Disaster and Security
    • /
    • v.7 no.2
    • /
    • pp.9-16
    • /
    • 2014
  • Though the maintenance monitoring of structurally weak parts of the tunnel structure in public service must be judged in connection with the monitoring during the construction period for analysis of the behavior of the ground and surrounding structures following the tunnel excavation for the effective management, the monitoring during the construction period and the maintenance monitoring are implemented separately on the basis of the periods of construction and maintenance, so the connectivity and systematic management of the related data are mostly inadequate. The improvement direction is suggested in this thesis, by analyzing the problems of tunnel monitoring in the domestic design criteria. And, it is anticipated that from now on the use of hi-tech sensors and wireless communications technology will proceed vigorously in the maintenance, so considering these situations, the development and application of the maintenance monitoring system and the revision of the domestic design criteria and specification are needed in the future.

Smart monitoring analysis system for tunnels in heterogeneous rock mass

  • Kim, Chang-Yong;Hong, Sung-Wan;Bae, Gyu-Jin;Kim, Kwang-Yeom;Schubert, Wulf
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2003.11a
    • /
    • pp.255-261
    • /
    • 2003
  • Tunnelling in poor and heterogeneous ground is a difficult task. Even with a good geological investigation, uncertainties with respect to the local rock mass structure will remain. Especially for such conditions, a reliable short-term prediction of the conditions ahead and outside the tunnel profile are of paramount importance for the choice of appropriate excavation and support methods. The information contained in the absolute displacement monitoring data allows a comprehensive evaluation of the displacements and the determination of the behaviour and influence of an anisotropic rock mass. Case histories and with numerical simulations show, that changes in the displacement vector orientation can indicate changing rock mass conditions ahead of the tunnel face (Schubert & Budil 1995, Steindorfer & Schubert 1997). Further research has been conducted to quantify the influence of weak zones on stresses and displacements (Grossauer 2001). Sellner (2000) developed software, which allows predicting displacements (GeoFit$\circledR$). The function parameters describe the time and advance dependent deformation of a tunnel. Routinely applying this method at each measuring section allows determining trends of those parameters. It shows, that the trends of parameter sets indicate changes in the stiffness of the rock mass outside the tunnel in a similar way, as the displacement vector orientation does. Three-dimensional Finite Element simulations of different weakness zone properties, thicknesses, and orientations relative to the tunnel axis were carried out and the function parameters evaluated from the results. The results are compared to monitoring results from alpine tunnels in heterogeneous rock. The good qualitative correlation between trends observed on site and numerical results gives hope that by a routine determination of the function parameters during excavation the prediction of rock mass conditions ahead of the tunnel face can be improved. Implementing the rules developed from experience and simulations into the monitoring data evaluation program allows to automatically issuing information on the expected rock mass quality ahead of the tunnel.

  • PDF

A Case Study on the Ground Reinforcement Method and Effect of the Failed Tunnel (터널붕괴지반의 보강공법 및 효과에 대한 사례연구)

  • Cho, Hyun;Lim, Jae-Seung;Chung, Yoon-Young;Choi, Sang-Yeul
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.293-300
    • /
    • 1999
  • The maintenance for the stability of tunnel, especially on downtown area, careful check must be considered during construction stage and after. Moreover we have to achieve the stability of tunnel by ground improvement and reinforcement when ground condition is bad or tunnel failures under the various ground conditions. In this paper, it is presented the case of tunnel failure and the state of restoration by ground reinforcements at seoul subway $\bigcirc$-$\bigcirc$ construction site. For the purpose of ground reinforcement, first, curtain wall was established by chemical grouting. Secondly, cement milk grouting was carried by upper part of tunnel crown. Also Boreholes loading test and tunnel monitoring were carried by in failure site for the long term stability of tunnel.

  • PDF

Selection of Optimum Support based on Rock Mass Classification and Monitoring Results at NATM Tunnel in Hard Rock (경암지반 NATM 터널에서 암반분류 및 계측에 의한 최적지보공 선정에 관한 연구)

  • 김영근;장정범;정한중
    • Tunnel and Underground Space
    • /
    • v.6 no.3
    • /
    • pp.197-208
    • /
    • 1996
  • Due to the constraints in pre site-investigation for tunnel, it is essential to redesign the support structures suitable for rock mass conditions such as rock strength, ground water and discontinuity conditions for safe tunnel construction. For the selection of optimum support, it is very important to carry out the rock mass classification and in-situ measurement in tunnelling. In this paper, in a mountain tunnel designed by NATM in hard rock, the selectable system for optimum support has been studied. The tunnel is situated at Chun-an in Kyungbu highspeed railway line with 2 lanes over a length of 4, 020 m and a diameter of 15 m. The tunnel was constructed by drill & blasting method and long bench cut method, designed five types of standard support patterns according to rock mass conditions. In this tunnel, face mapping based on image processing of tunnel face and rock mass classification by RMR carried out for the quantitative evaluation of the characteristics of rock mass and compared with rock mass classes in design. Also, in-situ measurement of convergence and crown settlement conducted about 30 m interval, assessed the stability of tunnel from the analysis of monitoring data. Through the results of rock mass classification and in-situ measurement in several sections, the design of supports were modified for the safe and economic tunnelling.

  • PDF

Implement of Dynamic Performance Measurement System Between Pantograph and Contact wire in Tunnel (터널구간 팬터그래프와 전차선간 동적성능 검측장치 구현)

  • Park, Young;Park, Chul-Min;Lee, Ki-Won;Kwon, Sam-Young
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.11
    • /
    • pp.1732-1736
    • /
    • 2012
  • To increase speed up of train, in the field of catenary system, it is necessary to develop of new monitoring methods for dynamic interaction between pantograph and contact wire. Also, there is a need to develop technologies that constantly measure are from various railway structure such as uplift of contact wire, vibration of catenary, dynamic strain of contact line in tunnel. In this paper condition monitoring systems for dynamic performance of catenary systems in tunnel were proposed. An advanced method and results of field tests using high speed camera for monitoring of vertical upward movement of the grooved contact wire due to the force produced from the pantograph were presented. The proposed uplift measurement system of contact wire is expected to enhance precision of current collection quality performance assessment methods at high-speed lines.

Web-based Monitoring System for a Railroad Tunnel by Wireless Internet (무선인터넷을 이용한 웹 기반 원격지 철도터널의 계측관리)

  • Lho, Byeong-Cheol;Kim, Jong-Woo;Kim, Jeong-Hoon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.10 no.3
    • /
    • pp.159-164
    • /
    • 2006
  • Mobile communication with wireless modem can be powerful tool in web-based structural health monitoring system in which power and communication method are crucial points. In this study, the major reasons of side cracks in tunnel lining are studied by FEM analysis. In addition, a web-based monitoring system using mobile communication with wireless modem is applied to the tunnel structure to monitor the long term behavior of the side cracks. The field application shows that CDMA is useful method for structural health monitoring system which installed long distance away.

Development of Tunnel-Environment Monitoring System and Its Installation I -Monitoring System and Measurement in Subway Tunnel- (터널 환경측정 시스템 개발 및 측정 I -개발 시스템 및 지하철터널 측정-)

  • Park, Won-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8608-8615
    • /
    • 2015
  • We developed a system that can collect and transmit real-time environmental data such as temperature, humidity, wind direction, and wind speed, and equipment performing aging tests on fire detectors. This system was installed in three representative sites of railway tunnels in South Korea such as Gumjung, Solan, Seoul Subway Line 4 tunnels. The systems showed a stable performance and collected environmental data for over a year. We analyzed environmental data collected by two of our developed systems installed in the running tunnels of Gwacheon Line of Seoul Subway Line 4. The developed system was capable of safely analyzing tunnel environments for 24 h straight using a wireless communication network, and has potential for use in a variety of fields other than tunnels.

Prediction of Preceding Displacement of a Soil-Tunnel by Displacement Monitoring using Horizontal Inclinometer (수평경사계를 이용한 토사터널의 선행변위 예측)

  • Kim, Chu-Hwa;Chae, Young-Su;Park, Yeon-Jun
    • Tunnel and Underground Space
    • /
    • v.18 no.5
    • /
    • pp.355-365
    • /
    • 2008
  • Displacement caused by tunneling is difficult to predict since it is affected by many factors such as ground condition, excavation method and supplementary method of reinforcement. In this study, horizontal inclinometer was employed to monitor ground settlements above a tunnel face before and after the excavation. Monitoring results were analyzed to predict the preceding displacement and settlement of the surface structures. The result of the analysis can be used to establish a proper counter measure which keeps the serviceability of the surface structures. Based on the analysis of the monitoring result, ground properties of the site were deduced and the influence of the tunnel excavation on the settlement of the foundation above the tunnel is analyzed.

A Case Study on Construction of Tunnel Crossed by Abandoned Tunnel (터널 갱구부 폐터널 교차구간 시공사례)

  • Ra, Seung-Hoon;Kim, Dong-Hyun;Lee, Sang-Pil;Lee, Hun-Yeon;Jeong, Se-Heon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.56-65
    • /
    • 2006
  • As portions(28m) of the designed tunnel was crossing the abandoned tunnel, methods for safe construction were demanded. The level of the abandoned tunnel and the designed tunnel was almost same and each tunnel was crossing at an angle of about 40 degrees. Therefore the abandoned tunnel would adversely affect the stability of the designed tunnel. Some sections of the abandoned tunnel passes through the designed tunnel wall were fully filled with tunneling spoil and cement milk grouting to increase tunnelling stability. By checking physical properties of grouting cores drilled at the cross section of the designed tunnel and the abandoned tunnel, the quality of material filled in the abandoned tunnel was confirmed. Also the stability of the designed tunnel was checked by the monitoring during excavation of the tunnel.

  • PDF