• Title/Summary/Keyword: Tunnel Convergence

Search Result 204, Processing Time 0.027 seconds

Development of 3D absolute displacement monitoring system and its application at the stage of tunnel construction (터널 시공 중 3차원 절대변위 계측시스템의 개발과 적용)

  • Bang, Joon-Ho;Kim, Ki-Young;Jong, Yong-Hun
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.9 no.3
    • /
    • pp.229-240
    • /
    • 2007
  • The 3D absolute displacement monitoring system has been developed to analyze the tunnel convergence measured under construction of underground structures and to manage effectively the measured data. The system is comprised of the total station, the anchor-typed target pin and the 3D absolute displacement measurement and management program. In this paper, the types and specifications of the 3D total station were presented. The anchor-typed target pin, an improved model of traditional one, was developed and its sightable distance and measurement accuracy were checked by field tests. Also a 3D absolute displacement measurement and management program, TEMS 3D, was developed to provide some analysis tools including the trend and influence lines. L/C ratio, S/C ratio and the like. The developed system was applied the construction stage of a railway tunnel for testing purpose. It is verified that the developed system is capable of predicting weak zones ahead of tunnel face by comparing with results of TSP (Tunnel Seismic Prediction) survey.

  • PDF

Study on the Estimation of Safety Zone and the Movement of Ground at the Inter-Crossing Tunnel (교차터널에서의 지반거동 및 안전영역평가에 관한 연구)

  • Kim, Woo-Sung;Yoo, Dong-Uk;Lee, Sang-Eun
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.491-502
    • /
    • 2008
  • A certain range of the original ground around the tunnel should be preserved to ensure structural safety of the tunnel when other structures are made around the tunnel, and thus this range is defined as safety zone of the tunnel. The main points to ensure the stability of an existing tunnel when constructing a new tunnel in an inter-crossing area are distance between two tunnels, size of the new tunnel, excavation method for the new tunnel, ground condition around the tunnel, and lining type of the existing tunnel etc. When the new tunnel is excavated above the existing tunnel, the existing tunnel is likely to suffer deformation at a crown zone, damage of arching effect, and live load of the new tunnel etc. On the other hand, when the new tunnel is excavated below the existing tunnel, the existing tunnel is likely to be damaged due to settlement. This study has been made on the behavior of the existing tunnel by means of model test and numerical analysis when the new tunnel is excavated below the existing tunnel. Safety zone of the tunnel was estimated by the results of strength/stress ratio obtained from numerical analysis, and the movement of ground was estimated by the model test. The results of earth pressure, ground displacements, and convergence of the tunnel obtained from model test were compared with those of numerical analysis, and show a similar trend.

Analysis on interaction of Ground and support using Ground response curve for tunnel design (지반응답곡선을 이용한 지반과 지보재의 상호작용 분석)

  • Ahn, Tae-Hun;Ahn, Sung-Hak;Lee, Song
    • Proceedings of the KSR Conference
    • /
    • 2002.10b
    • /
    • pp.1059-1064
    • /
    • 2002
  • The behavior of an opening and the performance of support system depend upon the load-deformation characteristics of ground and support as well as of the manner and of timing of support installation. The load-deformation characteristics of ground and support are derived by the interaction between ground and support. The interaction between ground and support is qualitatively illustrated by a ground response curve. The behavior of an opening and the performance of support system depend upon the load-deformation characteristics of ground and support as well as of the manner and of timing of support installation. The interaction between ground and support is qualitatively illustrated by a ground response curve. The convergence-confinement method don't need the basic assumptions for a mathematical model. Also This is applicable to general tunnel. Consequently the stability of tunnel must be qualitatively investigated by a ground response curve and quantitatively adjudged by a numerical analysis for the reasonable design of tunnel.

  • PDF

A Study on the Installation of a Barrier to Prevent Large-Scale Traffic Accidents in Tunnel

  • Baek, Se-Ryong;Yoon, Jun-Kyu;Lim, Jong-Han
    • International journal of advanced smart convergence
    • /
    • v.8 no.4
    • /
    • pp.161-168
    • /
    • 2019
  • Traffic accidents in tunnel can lead to large traffic accidents due to narrow and dark road characteristics. Therefore, special care of the driver is required when is driving in a tunnel. However, accidents can happen at any time. In the event of an accident, a narrow road structure may lead to a second accident. Therefore, all facilities installed inside the tunnel should be allowed to minimize damage in the event of an accident. We confirmed the safety of the collision target through the action of the sedan, Sport Utility Vehicle (SUV) and truck when the vehicle crashed into a stairway installed on the tunnel emergency escape route, and when a concrete barrier or guard rail was installed in front of the stairway. The behavior of the vehicle has resulted in a total of three results: rollover or rollover, change of speed and angle of the vehicle after collision. The sedan and SUV were the most secure when colliding with the guardrail, but considering the truck as a whole, concrete barriers were judged to be the most suitable for minimizing damage from the first accident and reducing the risk of the second accident.

The Change of Backlayer Length with the Ventilation Air Velocity in the Tunnel Fire (터널화재에서 환기속도와 backlayer의 길이변화)

  • 김성준;이민규
    • Fire Science and Engineering
    • /
    • v.17 no.3
    • /
    • pp.50-54
    • /
    • 2003
  • The backlayer phenomena of smoke in the road tunnel is evaluated through numerical experiments. A commercial code, PHOENICS is used to simulate smoke flow in the road tunnel. The independent and dependent variables are ventilation air velocity and the length of backlayer of smoke respectively. Hybrid scheme and $textsc{k}-\varepsilon$ turbulence model is adopted in the simulation process and mass residual is used as a convergence criterion. The experimental results say that the length of backlayer is reduced linearly with the increase of ventilating air velocity and that there is a critical air velocity which prevents from the onset of backlayering phenomena. One finds that there is a fresh air region near the bottom of tunnel which could make the passenger escape from the region polluted by smoke. These phenomena come from the severe vertical stratification of the smoke air mixture in the tunnel.

Analysis on the tunnel behavior characteristic in the excessive fractured zone distribution of rock area (파쇄대가 과대분포한 암반지역에서 터널의 거동특성에 관한 연구)

  • Park, Jae-Weon;Lee, Seung-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.18 no.4
    • /
    • pp.341-354
    • /
    • 2016
  • This article is to apply the tunnel support system selected after comparatively analyzing of RMR and tunnel instrumentation between the tunnel behavior characteristic predicted through geotechnical investigations and the numerical analysis at the design stage and the properties deformation occurred at the construction stage. This attempt results from the behavior characteristic of the tunnel excavation ground shown differently in accordance with the ground quality and reinforcement method. This, therefore, provide the data and results analysed the actual decision RMR-crown settlement & convergence and reduction of material property of ground as parameters. Also, it's shown that the tunnel designer is able to predict tunnel behavior characteristic when designing in bedrock areas excessively distributed faults and fractured zones.

A Study on Tunnel Excavation by Controlled Blast Vibration at Particular Environment Conditions (발파진동 제어에 의한 특수구간 터널굴착에 관한 연구)

  • Choi, Hyung-Bin;Lim, Han-Uk
    • Journal of Industrial Technology
    • /
    • v.20 no.A
    • /
    • pp.257-267
    • /
    • 2000
  • It was difficult to apply conventional excavation methods in some sections from Seoul to Pusan high speed rail road construction of 1 lot 2, due to highway concrete road, gas pipe, water pipe and nearby factories with automatic control system machine. To excavate safely and efficiently in these sections new blast patterns were employed within allowable blast vibration level, by test blast and controlled vibration by sequential blast. Behaviors of the rock mass including convergence and displacement around tunnel were measured with construction works and the crack width in concrete wall was also monitored for controlling allowable limits. The results can be summarized as follow : 1. The allowable blast vibration level in structure site is less 1.0cm/sec for highway concrete, 0.5 cm/sec for gas pipe, water pipe and building housing and 0.3 cm/sec for automatic control system machine. 2. The convergence displacement, single rod extensometer and multi rod extensometer around tunnel and cracks in concrete wall were measured, it was confirmed that the measured values were converged within allowable level. 3. The empirical formular of ground vibrations with 90% confidence lines for PD-3 was given as follow. $$V_{90%}=45.549({\frac{D}{\sqrt{W}}})^{-1.353}$$

  • PDF

A CASE STUDY ON DISPLACMENT FORECASTING METHOD IN TUNNELLING BY MATM IN URBAN AREA (도시 NATM 터널에서 변위예측기술의 적용사례 연구)

  • 정한중;조경나
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1993.03a
    • /
    • pp.27-32
    • /
    • 1993
  • In tunnelling by NATM convergence data are most Importantly to ascertain the safety of tunnel. Therefore, a reliable method is required that can predict ultimate displacements by using earler displacement data. Displacement forecasting method is classified into statistical method and functional regression method. Convergence data measured in Seoul subway 5~45 site during '92.5 ~ '92.12 were analyzed by above said two methods. The analysis results of convergence data show that the functional regression method is more relieable in completely weathered rock, but the statistical method in slightly wearhred rock.

  • PDF

A Study on the Concrete Lining Behavior due to Tunnel Deterioration (터널 열화로 인한 콘크리트 라이닝의 거동에 관한 연구)

  • Han, Young-Chul;Jeong, Sang-Seom
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.4
    • /
    • pp.21-34
    • /
    • 2014
  • This paper studies the time-dependent behaviors of tunnel and surrounding ground due to tunnel deterioration. In the first part, the literature on deterioration characteristics of tunnels was reviewed. In the second part, a numerical analysis was performed to investigate the behavior of concrete lining on the typical section of Korean high-speed rail tunnel (weathered rock) after determination of input variables related to deterioration impact. The result shows that the settlement at the crown of tunnel and surface ground increased up to 7.0% and 30.2% of the total settlements during construction stage, respectively, and the internal convergence reduction of 9.0 mm for concrete linings was generated within 30 years after completion of tunnel construction. Also the loosening height increased up to 2.55 times of tunnel height within 50 years, which is higher than that of Terzaghi's recommendation on ultimate state. Due to this process of extending zones, it is found that additional loads were applied to concrete lining with the axial stress about 3.20~3.66 MPa, which accelerates tunnel deterioration. Finally the quantitative design approach to evaluate time-dependent behavior of lining and surrounding ground due to tunnel deterioration was proposed.

Stress interactions between two asymmetric noncircular tunnels

  • La, You-Sung;Kim, Bumjoo;Jang, Yeon-Soo;Choi, Won-Hyuk
    • Geomechanics and Engineering
    • /
    • v.15 no.3
    • /
    • pp.869-877
    • /
    • 2018
  • The continually growing demand for underground space in dense urban cities is also driving the demand for underground highways. Building the underground highway tunnel, however, can involve complex design and construction considerations, particularly when there exists divergence or convergence in the tunnel. In this study, interaction between two asymmetric noncircular tunnels-that is, a larger main tunnel and a smaller tunnel diverging from the main tunnel, was investigated by examining the distributions of the principal stresses and the strength/stress ratio for varying geometric conditions between the two tunnels depending on diverging conditions using both numerical analysis and scale model test. The results of numerical analysis indicated that for the $0^{\circ}$, $30^{\circ}$, $60^{\circ}$ diverging directions, the major principal stress showed an initial gradual decrease and then a little steeper increase with the increased distance from the left main tunnel, except for $90^{\circ}$ where a continuous drop occurred, whereas the minor principal stress exhibited an opposite trend with the major principal stresses. The strength/stress ratio showed generally a bell-shaped but little skewed to left distribution over the distance increased from the left larger tunnel, similarly to the variation of the minor principal stress. For the inter-tunnel distance less than 0.5D, the lowest strength/stress ratio values were shown to be below 1.0 for all diverging directions ($0^{\circ}$, $30^{\circ}$, $60^{\circ}$ and $90^{\circ}$). The failure patterns observed from the model test were found to be reasonably consistent with the results of numerical analysis.