• 제목/요약/키워드: Tunnel

검색결과 8,720건 처리시간 0.047초

도로터널의 환기방식에 따른 라이닝 콘크리트의 중성화 사례 연구 (Case Study of Carbonation on Lining Concrete in Vehicular Tunnel as Ventilation System)

  • 추진호;맹두영;황인백;노은철
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 춘계 학술발표회 논문집
    • /
    • pp.417-422
    • /
    • 2005
  • The appropriate ventilation system in vehicular tunnel should be the most economical solution with regard to both construction and maintenance. The damages on tunnel lining was affected by formula of ventilation system in long vehicular tunnel. In this study, carbonation, one of main experimental items in precision safety diagnosis, was analyzed by contouring damage area with ventilation system. Considerations of carbonation were also given to the design and maintenance which manage the long-term safety in tunnel.

  • PDF

도로터널내 연기거동 및 피난에 관한 실험적 연구 (An Experimental Study of Smoke Movement and Evacuation in Road Tunnel)

  • 강현욱;이호석;신영완;이인기
    • 한국터널공학회:학술대회논문집
    • /
    • 한국터널공학회 2005년도 학술발표회 논문집
    • /
    • pp.335-340
    • /
    • 2005
  • Recently, According to increased tunnel accident, a matter of concern in tunnel fire safety is on an interesting trend. In case of tunnel fire, Evacuation is a primary factor for refugee safety. Therefore safety measures should be taken to increase capability of evacuation. Evacuation walking speed and characteristics of movement in tunnel is differ from building or outdoor site so, these characteristics must be considered in tunnel safety planning. In this study has performed to evaluate the smoke movement and characteristics of evacuation by full-scale test method. and aimed for basic data establishment in characteristics of evacuation for tunnel safety system design.

  • PDF

자동 터널라이닝 공법에 대한 해석기법 (A Method of Tunnel Analysis for Automatic Concrete Lining Construction Method)

  • 정한중;강석화;장성욱;이승욱
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1993년도 가을 학술발표회논문집
    • /
    • pp.32-37
    • /
    • 1993
  • A method of tunnel analysis for a new type of tunnel construction method (ACLCM, Automatic Concrete Lining Construction Method) is presented here. ACLCM is an unique tunnel construction method which provides concrete lining at the end of shield machine by extruding concrete into the space between the excavated ground surface and the inner form (Automatic Concrete Lining Machine). Since behaviors of tunnel and the surrounding soils are greatly influenced by the construction method, existing tunnel design methods may not be applicable to the design of ACLCM tunnel. In this study, a method of ACLCM tunnel analysis is suggested to provide the prediction of behavior of ACLCM tunnel and surrounding soils as well as to check up the safety during the construction and after the completion of ACLCM tunnel

  • PDF

콘크리트 터널 라이닝 균열검사 시스템 개발에 관한 연구 (Development of Inspection System for Crack on the Lining of Concrete Tunnel)

  • 고봉수;손영갑;신동익;김병화;한창수
    • 제어로봇시스템학회논문지
    • /
    • 제10권1호
    • /
    • pp.66-72
    • /
    • 2004
  • To assess tunnel safety, cracks in tunnel lining are measured by inspectors, who observe cracks with their naked eyes and record them. But manual inspection is slow, and measured crack data is subjective. Therefore, this study proposes inspection system fur measuring cracks in tunnel lining and providing objective crack data to be used in safety assessment. The system consists of On-vehicle system and Laboratory system. On-Vehicle system acquires image data with line CCD camera on scanning along the tunnel lining. Laboratory system extracts crack information from the acquired image using image processing. Measured crack information is crack thickness, length and orientation. To improve accuracy of crack recognition, the geometric properties and patterns of cracks in concrete structure were applied to image processing. The proposed system was verified with experiments in both laboratory environment and field environment such as subway tunnel.

2차원 및 3차원 모델링에 의한 터널구조물의 구조해석 (Structural Analysis of Tunnel Structures by Two and Three Dimensional Modeling)

  • 김래현;정재훈;임성순
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제6권3호
    • /
    • pp.97-102
    • /
    • 2002
  • Two dimensional Analysis has been applied to most of tunnel lining design in these days. Two dimensional analysis uses beam or curved beam element for finite element method. But because the behaviors of tunnel concrete lining structure is near to shell, it is required to model the tunnel lining as shell structure for safety design of tunnel lining structure. In this paper, two dimensional analysis by beam element and the three dimensional analysis by shell element of tunnel concrete lining are studied, in which 3 type of tunnel lining and lateral pressure factors are considered. As results of the study, three dimensional analyses of the behavior of tunnel concrete lining structure considering lateral pressure factor shows that the moment of three dimensional analysis is greater than those of two dimensional analysis. The results shows that three dimensional analysis is necessary for safety design of tunnel lining.

협소터널 고속 주행시 압력변동 및 미기압파 저감을 위한 수치해석적 연구 (Numerical Study of Reduction of Pressure variation and Micro-Pressure Wave for high-speed train in narrow tunnel)

  • 이정욱;윤수환;곽민호;이동호;권혁빈;고태환
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 춘계학술대회 논문집
    • /
    • pp.70-77
    • /
    • 2011
  • When a train passes a conventional tunnel at high speed, an environmental noise issue arises by pressure variation and micro-pressure waves at the exit of the tunnel. It is known that this issue can be reduced by using dummy tunnel duct on the tunnel entrance. We studied the variances of micro-pressure waves at the exit of tunnel and pressure variation within the tunnel, by altering surface area and length of the dummy tunnel duct. For analyze this train-tunnel relation problem, axi-simmetric steady compressible flow solver was used. Changing the length of the dummy tunnel duct can adjust pressure variation, changing the surface area of the dummy tunnel duct can adjust volume and pressure variation of the micro-pressure wave. Thus, optimized surface area and length of the dummy tunnel duct can simultaneously reduce environmental noise pollution by micro-pressure wave and issues by the pressure variation.

  • PDF

터널 유지관리를 위한 안전진단시스템 개발에 관한 연구 (Development of Inspection and Diagnosis System for Safety and Maintenance in Tunnel)

  • 김영근;백기현
    • 한국터널지하공간학회 논문집
    • /
    • 제3권1호
    • /
    • pp.37-50
    • /
    • 2001
  • 최근 터널구조물에서 결함이나 변상이 많이 발생하고 있지만 터널구조물의 특수성으로 인하여 그 원인을 평가하거나, 상태 및 안전성 평가에 있어 많은 어려움을 겪고 있다. 따라서 보다 효율적인 안전진단 및 유지관리대책이 요구되고 있다. 본 연구에서는 터널에서의 정밀안전진단을 효과적으로 수행하기 위하여 터널 라이닝과 주변지반에 대한 비파괴 조사기술, 터널 라이닝의 구조적 안정성을 평가할 수 있는 해석기술, 그리고 터널의 변상원인 및 건전도를 판단할 수 있는 평가기술을 개발하여 터널의 열화 및 손상정도를 진단하고 터널의 유지관리를 위한 적절한 보수 보강대책을 제시함으로서 체계적인 터널 안전진단업무에 활용하도록 하였다.

  • PDF

근접한 흙막이벽체에 가하는 선행하중의 영향을 받는 상재하중 재하 터널의 안정 (Stability of A Surcharged Tunnel under the Effect of Pre-Loading on the Adjacent Braced Wall)

  • 김일;이상덕
    • 한국재난정보학회 논문집
    • /
    • 제4권2호
    • /
    • pp.10-27
    • /
    • 2008
  • When the ground is excavated adjacent to the existing tunnel, which is loaded by the surcharge on the ground surface, the tunnel stability would be very sensitive to the deformation of the ground induced by the horizontal displacement of braced wall. The stability of the existing surcharged tunnel could be controlled by pre-loading on the braced wall. In this paper, it was investigated, if it would be possible to keep the existing surcharged tunnel stable by preventing the horizontal displacement of a braced wall by imposing the pre-loading during the ground excavation. For this purpose, large scale model tests were performed in a scale 1/10 at the test pit which was 2.0m in width and 6.0m in height and 4.0m in length. Isotropic test ground was constructed homogeneously by wet sand. Model tunnel was constructed in the test ground. Surcharge was loaded on the ground surface above the tunnel. During the tests, the behavior of model tunnel and model braced wall was measured. Numerical analyses were also performed in the same condition as the tests. And their results were compared to that of the model tests. Consequently, the effect of a surcharge could be compensated by imposing the pre-loading on the braced wall. The existing tunnel and the braced wall could be kept stable by preventing the horizontal displacement of the braced wall through pre-loading, although the tunnel is surcharged.

  • PDF

석분을 이용한 터널 뒤채움용 경량기포 충전재의 개발과 현장적용에 대한 연구 (A Study on Development of Lightweight Foam Filling Material for the Voids behind Tunnel Liner using Stone-dust and Application to the Old Tunnel)

  • 마상준
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제7권4호
    • /
    • pp.139-147
    • /
    • 2003
  • 국내 재래식 터널의 대부분에 존재하는 배면공동은 라이닝의 균열, 누수, 응력집중 등을 유발하여 터널 안정성에 큰 영향을 미치게 된다. 이러한 배면공동의 보강은 공동을 뒤채움하는 방법이 일반적으로 적용되고 있는데, 본 연구에서는 현재 산업폐기물로 취급되어 버려지고 있는 석분토를 이용하여 터널 뒤채움용 경량기포 충전재를 개발하였고, 실내물성시험과 노후터널에 대한 현장적용시험을 수행하여 개발 충전재의 적용성 평가를 실시하였다.

고속철도의 터널입구 형상변황에 따른 압력파동 현상에 관한 수치적 연구 (Numerical Study on the Effects of Pressure Wave Propagation for Tunnel Entrance Shape Change in High-Speed Railways)

  • 목재균;백남욱;유재석;최윤호
    • 한국자동차공학회논문집
    • /
    • 제5권2호
    • /
    • pp.50-59
    • /
    • 1997
  • When a front head of train enters a tunnel at a high speed, compression wave is generated at tunnel entrance due to the confinement effect and propagated along the tunnel with sound of speed. The propagated compression wave is reflected at tunnel exit due to abrupt pressure change at passage. The reflected wave is expansion pressure wave. And when the rear head of train goes through the tunnel entrance, another expansion pressure wave is generated and propagated along the tunnel. The pressure drop occurs seriously around train when the two expansion pressure waves come cross on train in the tunnel. In order to reduce the pressure drop, the compression wave front must be controlled because the intensity and magnitude of pressure drop is nearly proportional to that of compression wave at tunnel entrance. This study relates to reduction of the pressure wave gradient with respect to tunnel entrance shape change with various kind of angle and rounding. The results show characteristics of wave propagation in tunnel, usefulness of characteristic curve to estimate proper time domain size in numerical study and measuring time in actual experiment. Also rounding is contributed to improve pressure wave front even if its radius is very small at tunnel entrance. In order to improve of pressure wave front at tunnel entrance, proper angle is prefered to rounding with big radius and an angle of around 14$^{\circ}$ is recommended according to this simulations, And it is expected to reduce additional pressure drop in tunnel when the location and the size of the internal space for attendant equipment are considered in advance.

  • PDF