This study has been carried on the transient phenomenon protection system to become fire alarm system control unit of high reliance which can be protected from transient phenomena for surge or transient overvoltage, and constructed engineering base that can develop transient phenomenon protection system by proving performance of protection system in a experimental. This study developed 1 step and 2 step protection system that can be protected from transient phenomenon with process thesis and theory for development of transient phenomenon protection system. It established engineering data construction and a source technology that can develop transient phenomenon protection system as gets satisfied result and test with all performance condition that present in fire protection law and connection regulation.
The non-preiodic fluctuation of the engine torque appears to be the major source of the torsional vibration of the automotive driveline. The reduction of this torsional vibration hs become a significant problem along with the requirements of higher performance. The shuffle(tip-in, tip-out) is the transient vibration phenomenon of a vehicle which appears at the sudden change of an accelerator under traveling. By executing of an experiment and a simulation using a model, it has become possible to obtain the design parameter of a driveline for the torsional vibration. This paper presents an experimental and theoretical research on the transient vibration phenomenon of a vehicle which appears at the sudden change of an accelerator under traveling. A dynamic model for the automotive driveline was developed, and all parameters of the mmdel were evaluated with experimental data. The results are as follows: (1) The lower the gea ratio of the transmission is, the more the transient vibration phenomenon of a vehicle appears clearly. (2) The transient vibration phenomenon of a vehicle is affected by the design parmeter of the driveline.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.12
/
pp.2091-2097
/
2007
This paper described the verification of modeling technique of underground distribution from comparison between field test and simulation. It needs more exact transient phenomenon analysis model to establish lightning protection of underground distribution line. Although, there were a lot of transient phenomenon researches, nobody could has verified the confidence of modeling from field tests in interior until now. So, simulation model verified field test is needed to analyse transient phenomenon of underground distribution system. The examination must be accomplished in many different condition before suggesting these verified analysis model. In this paper, the conditions were examined and the various data results on the different line composition was compared with the EMTP simulation, when the lightning impulse test was accomplished at underground distribution line. Also the value between field test and simulation was very closed and the method of modeling has demonstrated confidence, when the method is used to analyse domestic transient phenomenon of underground distribution.
Journal of Fisheries and Marine Sciences Education
/
v.7
no.1
/
pp.111-126
/
1995
In general, the electromagnetic transient phenomenon always exists in induction motor(IM) with the torque change. The control performance of IM is very worse than that of D.C motor owing to this transient phenomenon. So many studies about the elimination methods of the transient phenomenon have been making progress. Interesting methods of them are the Field acceleration method(FAM) and the method of impulse addition on the input voltage at the time point of torque change. In this paper, first, the circuit equation of IM is derived from the phase segregation method. The torque equation consisted of the stator and rotor currents is derived from the solving of the circuit equation. As we well known, the transient terms exist in this the torque equation. The method of impulse addition on the input voltage at the instance of torque change is confirmed theoretically for the elimination of the transient phenomenon. With the base on it, the author proposed a real time algorithm to eliminate the transient terms. The control system is consisted of the PI controller with the feedforward of torque change. The author could confirm that the quick stepwise responses of torque and speed can be obtained from response simulations.
Journal of the Korean Society of Propulsion Engineers
/
v.25
no.2
/
pp.79-87
/
2021
In this study, we developed a method to predict/analyze the performance of a dual thrust rocket motor that has 2 kinds propellant charged in axial direction. When transitioning from the booster to the suspender stage, a transient phenomenon related to performance occurred at the interface. The causes and characteristics of the transient phenomenon were investigated by comparing them with the results of the combustion test. It was confirmed that the performance transient phenomenon is sensitively generated not only by the shape design between the propellants with different properties of the propellant, but also by errors in manufacturing due to the propellant curing shrinkage.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.5
/
pp.67-72
/
2011
In this study we investigate the background of UPS output transformer(${\Delta}-Y$) operation on neutral ungrounded system, and perform field experiment of neutral floating-phenomenon for the inter-locked securing of electric facilities and improvement of neutral floating-phenomenon. Experiment results show that a floating-phenomenon occurs when four-pole input-breaker trip and the neutral to earth voltage occurring concurrently is identified as phantom voltage. And the measures for the transient overvoltage that can occur in floating-state also are investigated. As a result, the risk elements of neutral ungrounded method as well as neutral floating-phenomenon are removed by installation of separate solidly-grounded transformer and switching four-pole input-breaker to three-pole input breaker.
Transactions of the Korean Society for Noise and Vibration Engineering
/
v.17
no.8
/
pp.726-735
/
2007
Inside the factory buildings of aprecision industry (which produces semiconductors or TFT-LCD), thousands of vibration-sensitive precision equipments operate in the clean rooms. Various utility equipments that are installed around them for proper operation cause various sources of noise and of vibration to exist inside the clean rooms and thus deteriorate the noise and the vibration environment within. In this study, we check if the existing transient vibration phenomenon is caused by the vibrations that arise from operating the utility installed near these equipments; compare and evaluate the vibration criteria of precision equipments regarding the transient vibration phenomenon; and check the efficiency of these criteria.
Journal of Advanced Marine Engineering and Technology
/
v.31
no.8
/
pp.998-1004
/
2007
Connecting a synchronous generator to a power system is a dynamic process, requiring the coordinated operation of many components and systems. The goal is to connect the oncoming generator to the system smoothly i.e without causing any significant bumps, surges, or power swings, by closing the ACB when the oncoming generator matches the power system in voltage magnitude, phase angle, and frequency. If oncoming generator voltage is not matched to the power system voltage, reactive power will flow either into or out of the system at the instant of ACB closure. If this voltage difference is too great, the reactive power flow may result in high transient stresses that could damage the windings of the generator. Also, if oncoming generator frequency is not matched to the power system frequency, transient power will flow between generator and power system. If the frequency difference is too great, the transient power flow is reflected into the prime mover shaft, and this may result in excessive shaft or coupling stress. This paper tries to prove the necessity of correct synchronization for ship generators through a transient phenomenon analysis.
Journal of Advanced Marine Engineering and Technology
/
v.25
no.5
/
pp.1065-1075
/
2001
It is common knowledge amongst electrical and marine engineers that short-circuit in electrical system may cause large mechanical torque on generator and prime mover However, it is not so widely known that the faulty synchronizing of generators may cause even higher torques than that of short-circuit. In this study, the transient phenomena related to the parallel running of synchronous generators are analyzed and the exact computer simulation method is proposed. In result, maximum transient torque and current take place in case of $120^{\circ}$ voltage angle difference between Master and Slave and that may develop higher torque than the short-circuit according to a condition of synchronizing. When synchronizing in power system using only two generators higher torque and current occur Master, but using multimachine system those occur to Slave. The short-circuit of marine generator does not happen frequently but faulty synchronizing sometimes takes place, therefore, it is necessary for designers to consider these phenomena.
the present study, the addresses the hysteric phenomenon of under-expanded jets with a help of a computational fluid dynamics methods. The under-expanded jets of both dry and moist air have been employed to the transient processes for the pressure ratio. It is known that under-expanded air jet produced during the process of increase in pressure ratio behaves different from the reducing process, leading to a hysteric phenomenon of under-expanded jet. It is also known that moist air jet significantly reduces the hysteric phenomenon found in the dry air jet, and that non-equilibrium condensation which occurs in the under-expanded moist air jet is responsible for these findings.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.