• Title/Summary/Keyword: Trainset

Search Result 41, Processing Time 0.027 seconds

Rolling Stock Maintenance Scheduling for High-Sneed Railway (고속철도차량의 유지보수계획)

  • 김동희;홍순흠
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.05a
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

An Enumeration Algorithm for Generating the Candidate Routings in a Set Partitioning Problem Approach to the Rolling Stock Requirement Plan (철도차량소요계획에 대한 집합분할문제 접근에서 후보운용생성을 위한 열거알고리즘)

  • 김성호;김동희;최태성
    • Journal of the Korean Society for Railway
    • /
    • v.7 no.4
    • /
    • pp.326-331
    • /
    • 2004
  • A routing is the path that an actual trainset follows as it moves from one train to another train in a timetable. The number of routings is equivalent to the number of trainsets required to cover the timetable. The primary factors of rolling stock requirement plan include evaluating the minimum number of routings. This can be formulated as a set partitioning problem and solved using enumeration method or column generation method. In this paper we presents an enumeration algorithm which is useful to implement the enumeration method for the rolling stock requirement plan.

Design for Extension Supply Contactor control of train with multiple Auxiliary Power Generator (다중 전원장치를 갖는 차량의 연장급전 제어방안)

  • Shin, Kwang-Kyun;Han, Jeong-Soo;Choi, Jong-Muk
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1222-1227
    • /
    • 2006
  • These days customers require various things such as multiple train, variable trainset, multiple Auxiliary Power Generator(APG) and so on. Among these, the train with multiple APG is installed with APG in each car. Thus, we control and monitor train installed with multiple APG through the TCMS(Train Control & Monitoring System). The TCMS supervise APG failure status and transmit control data in case of a APG failure or more, so energize or de-energize ESK and LRR. Therefore, we can easily control ESK and LRR which gets hard to control because of multiple APG.

  • PDF

The Conceptual Design of Korea High Speed Train System (한국형 고속전철 차량시스템의 개념설계)

  • 김경택;정경렬
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.172-180
    • /
    • 1999
  • The major subject of this paper is to develop the concept fur a Korea high speed train system and recommend to train configuration. High speed train configurations are basically concerned traction power(train configurations with concentrated; CPT or distributed Power system: DPT) and train design(single car as compared with articulated bogies). The result of configuration, a advantages and disadvantaged were necessitated by different train configurations; -distributed underfloor power have an increased length for the seats by 15% as compared with the concentrated power trait - articulated trainsets are characterised by less of number of bogies and reduced values of mass, train resistance, noise and vibration. from the result, the optimized train concept combining high seat capacity per train length with low weight and train resistance is 400m long, single -floor train composed of two symmetrically arranged half trainsets. Therefore, at this work recommended distributed train system However, the final decision of Korea high speed train configuration was concentrated power train and articulated bogie system. The configuration of trainset was 20cars included 2 power cars, 4 motorized cars and 14 trailer cars.

  • PDF

Combined test of Power Supply System for Korean High Speed Train (고속전철용 보조전원장치 시스템 조합시험)

  • Cho, Hyun-Wook;Kim, Yuen-Chung;Kim, Tae-Hwan;Jang, Kyung-Hyun;Kim, Chul-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.619-625
    • /
    • 2008
  • Electrical Power supply System conditions of korea high speed train consists of main transformer, four AC-DC PWM converter of Auxiliary Block, Battery Charger in Power Car and Trailer Car, Trailer Inverter, Auxiliary inverter. Main transformer, at nominal voltage of 25kv supplied to secondary winding nominal output Voltage 383Vac, The Auxiliary block consists of AC-DC converters for generating 670VDC power, Auxiliary inverters for ventilation and air compressor, Trailer car inverter provide three phase power supplies at 440Vac for air conditioning and heating. The Battery charger Trailer and Power car supplies 72VDC all necessary equipment to energize the trainset equipment and suppy essential control. This Paper introduces the combined test results of the power supply system for korea high speed train. The main purpose of this combined test is to verify the performance of the power supply system that is designed to operate up to full load test.

  • PDF

The Feasibility Study of the Scenario of 400kph Maximum Speed Test in HEMU (High-speed Electric Multiple Unit) System (400km/h급 전차선로 시스템의 시범적용 구간선정 연구)

  • Ryoo, Hyang-Bok;Jang, Sa-Sool;Park, Jae-Woong;Lee, Hae-Won
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.761-767
    • /
    • 2011
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF

A STUDY ON THE AERODYNAMIC DRAG REDUCTION OF HIGH-SPEED TRAIN USING BOGIE SIDE FAIRING (고속열차 대차 측면 페어링 적용을 통한 공기저항 저감 연구)

  • Moon, J.S.;Kim, S.W.;Kwon, H.B.
    • Journal of computational fluids engineering
    • /
    • v.19 no.1
    • /
    • pp.41-46
    • /
    • 2014
  • The aerodynamic drag of high-speed train has been calculated and the effect of bogie side fairing on the aerodynamic drag has been investigated. Computational Fluid Dynamics (CFD) simulation based on steady-state 3 dimensional Navier-Stokes equation has been conducted employing FLUENT 12 and the aerodynamic model of HEMU-430x, the Korean next generation high-speed train under development has been built using GAMBIT 2.4.6. Three types of bogie side fairing configuration, the proto-type without fairing, half-covered fairing to avoid the interference with the bogie frame and full-covered fairing have been adopted to the train model to compare the drag reduction effects of the bogie side fairing configurations and the numerical results yields that the bogie side fairing can reduce the aerodynamic drag of the 6-car trainset up to 7.8%. The aerodynamic drag coefficient of each vehicle as well as the flow structures around the bogie system have also been examined to analyze the reason and mechanism of the drag reduction by bogie side fairing.

The Feasibility study of Commission plan in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 시운전방안 효율성 검토)

  • Cho, B.C.;Kim, K.G.;Jeong, S.H.;Kim, J.S.;Lim, K.M.
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1039-1044
    • /
    • 2008
  • By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.

  • PDF

Improving Collision Energy Absorption In High Speed Train By Using Thin Walled Tubes

  • Salimi, Ehsan;Molatefi, Habib;Rezvani, MohammadAli;Shahsavari, Erfan
    • International Journal of Railway
    • /
    • v.6 no.3
    • /
    • pp.85-89
    • /
    • 2013
  • The purpose of this paper is investigating the effect and influence rates of utilizing thin walled energy absorption tubes for improving crashworthiness parameter by increasing energy absorption of the body in high speed railcars. In order to find this, a proper profile of available tubes is chosen and added to the structure of selected high speed train in Iranian railway network (Pardis Trainset) and then examined in the scenario of impact with other moving rolling stock. Because of the specific features of LS-DYNA 3D software at collision analysis, the dynamic simulation has been performed in LS-DYNA 3D. The results of the analysis clearly indicate the improvement of train crashworthiness as the energy absorption of structure increases more than 30 percent in comparison with the original body. This strategy delays and reduces the shock to the structure. The verification of the simulation is by using ECE R66 standard.

The Feasibility study of the scenario for 400kph maximum speed test in HEMU (High-speed Electric Multiple Unit) System (분산형 고속철도 시스템의 400kph 최고속도 시험을 위한 시운전 시나리오 고찰)

  • Kang, B.M.;Jeong, S.H.;An, H.K.;Cho, B.C.;Moon, J.S.
    • Proceedings of the KSR Conference
    • /
    • 2009.05b
    • /
    • pp.429-433
    • /
    • 2009
  • Since the "Low Carbon, Green Growth" as a social requirements is attracted public attention, the policies and investments of the railway which have been less estimated than road is re-considered. Since the starting the commercial service (2004. April), the KTX have been operated successfully while transport passengers over 100million for years. And also the project for development of KHST (Korea High Speed Train ; G7) had been accomplished with a good result, the first trainset of KTX-II which base on G7 project was manufactured and testing now. On the other hand, the world's technology of the high speed train is more faster, and changing to a distributed traction system. To catch up the world's leading technology, the HEMU(High-speed Electric Multiple Unit) project will secure new technology and aims to promote the technology of domestic high-speed train. The authors indicates the result of detail review such as a curve, slope of the track and electrical dead section of the catenary to test at 400kph and also the performance simulation of the developed rolling stock in this paper. As the result, the authors devise the test scenario to perform a maximum speed test (stability at max. speed, acceleration & deceleration etc) with the restricted conditions such as track length, track available time etc by considering above result.

  • PDF