This study was aimed to establish failure management plan of the rubber-tired AGT light rail vehicle for its safety case, which was developed according to the Korean standardized specifications for the light rail vehicle. Vehicular 9 failure modes anticipated during the system operation were considered, which are single malfunction of redundant equipment, malfunction of train radio, public address and air compressor, battery, main circuit NFB trip, on-board ATO control device malfunction, on-board ATP control device malfunction, fail of brake release, flat tire, train emergency door open.
Mungyeng line(Jupyung${\sim}$Mungyeng) was closed due to a rapid decrease in demand in 1995. However, as the rail transportation demand is expected to increase with the plan to develop a tourist resort and a traffic network in Mungyeng area, it is required to forecast future demand to meet the change of transportation environment in this region. This study predicts the rail transportation demand and analyzes financial benefit in operator's side in case of reopening this line, based on nation-wide traffic volume data from Korean Transportation Database(KTDB). The results of this research can be applied to not only establishing a train operation plan also improving customer service. Moreover, Korail will have an opportunity to develop new business by linking train service to tourist attractions around the Mungyeng area.
Since the KTX start its service on April 1st of 2004, KTX increased its share up to 17.4% (2008). It's the 2nd after the passenger car share of 59.2% in the national transportation, but the gap is still wide. In addition, because of the rise of goods' and oil price, the share of intercity express bus is growing up. Nevertheless Korail is trying to improve the train schedule and develop internodal transit system, the number of passengers of KTX is remain flat. KORAIL should start and proceed the tasks below. - Analysis of the 5 year's operation of KTX since the year of 2004 to make plans for the steady growth - development of the KTX operation plan for expansion of railway - preparing the operation of additional passenger rail services on the mail line for newly introduced trains. - expansion of KTX's service area after the introduction of KTX-II - introduction of other new trains - examination for the action plans to promote marketing in main-line including refinement of the rate structure
In general, the national rail system put an emphasis on distribution planing of stations for smooth operation of transporting goods, train allocation, parking, and maintenance. Since the national rail system is operated on the ground level, it is feasible to improve various aspects of the system during its operation. On the contrary, urban rail system is operated in the limited space under the ground, and thus, improving various aspects of the system during its operation is infeasible. Specifically, the urban subway system must have a comprehensive track distribution plan because the urban subway system has to operate in a limited environment such as it operates in a much shorter time period, The subway system has to be ready for various operations and events such as trains returning in the opposite direction. parking trains that need repair, parking during night time, storing various maintenance equipments, and connections to other tracks. Furthermore, considering the future extension of tracks, a comprehensive track distribution plan is a must.
기존 도시철도의 급행화 방안으로 가감속도가 향상된 고성능 열차를 완행에 투입하고 기존 성능의 열차를 급행에 투입하는 방안은 대피선 수를 줄이는 효과를 가진다. 본 연구에서는 고성능 열차를 완행으로 투입하는 급행화 방안을 토대로, 대피선 수를 최소화하면서 완행 열차의 운행시간을 최소화 할 수 있는 동시 최적화 방안을 제안하였다. 최적화 방안은 유전알고리즘을 기반으로 하여 차두시간, 대피선 위치 및 대피 시간을 설계 변수로 정의하였다. 결과적으로 제안한 최적화 방법론을 서울 7호선에 적용하여 타당한 최적화 결과를 얻을 수 있음을 확인하였다.
수도권 도시철도 혼잡으로 인해 다양한 문제가 발생되고 있어 도시철도 혼잡을 정확히 분석하는 연구 또한 해결방안 중 하나일 것이다. 현재 계수법, 중량검지법, CCTV, 모바일 Wi-Fi 등을 활용한 혼잡도 분석방법론은 결과의 정확성이 낮거나 단일 노선 및 열차에만 국한되는 한계점이 존재한다. 본 연구에서는 도시철도 승객의 다중경로 이용행태와 수도권 도시철도 열차운행계획을 반영한 열차 혼잡도 분석모형을 제시하였다. 특히 열차 용량 초과시 승객이 대기한 후 다음 열차에 탑승하는 통행패턴을 고려하여 열차 혼잡도 산정의 정확성을 제고하였다. 열차 혼잡도는 10분 단위로 갱신되어 시민에게 혼잡정보 제공이 가능하므로 사회적 편익증대에 기여할 것으로 기대된다.
Interlocking signalling system plays key role as core system to manage railway operation. The core role of railway operation is to control routing, displaying signal and regulation for train. Interlocking system relate tightly to railway accident because collision and derailment is sometime taken place wrong route setting and signal displaying. Safety activity for interlocking system is inevitable to avoid the accident over its life cycle. The safety activity includes hazard identification and analysis, safety requirement allocation, safety plan, safety activity and ao on. The safety activity need a broad wide range work. In this paper, we concentrate on hazard identification for generic interlocking system and programmable electronic interlocking system and compare between two results. The hazards will be used for safety activity.
Normally, the government or a local autonomous entity selects urban railway(subway, light rail transits etc.) system after investigating logicality about a route and announcing officially for people's convenience if the system is decided, suppliers of equipment(train, transformer, trolly wire, signal, communication, PSD, AFC etc.) are selected and ordering go forward. Stabilization of a total system is need for smooth train operation before opening to traffic by design, installation, total trial operation So, a measure against interface disharmony between each equipment is need. This treatise deals with the systematic method of management and items for interface plan from system design to opening on the evidence of experience of Gwangju subway total interface.
Greater expansion and more frequent operation of the railroad transportation system anticipated due to its characteristics including low cost, safety and mass transportation. Recently, effects on the railway structures due to expansion of newly constructed road, construction of subway, city gas pipeline, communication network, electric power network and construction of other railway underground crossing in accordance with urban planning and organization has influenced safe operation of trains. Accordingly, standard for selection of construction method that will enable construction of more economical and rational subway underground crossing structures by preventing problems occurring at the time of above construction works and accidents in safe operation of trains due to construction in advance is definitively necessary. Although there are numerous construction methods that can be applied at the time of construction of railway underground crossing, there are much difficulties in selection of appropriate construction method that considers characteristics of each construction method on non-excavation type construction method, train operation plan of number of operational routes and on-site circumstances. Therefore, this research aims to present rational standard for selection of construction method for such, and standard for slowdown speed and interception of train when passing the areas of slowdown in sectors under construction.
Shinbundang-line is new Metropolitan Railway which was invested by private capital and is under construction for opening in 2010. Now Shinbundang-line pursues various innovation, for example, an express train which uses long distance of each station, and an unmanned operation. And it may be independent of existing metropolitan railway system from a viewpoint of line and fare system. So according to the present plan, Shinbundang-line will be not able to get sufficient demand because of weak connection with existing lines and monotonous function of the line. And it may be difficult to deliver various innovation which Shinbundang-line prepares to passengers. Hereupon, in this paper, I propose 3 methods for increasing competitive power of Shinbundang-line railway. First, making Shinbundang-line a trunk railway line of southern metropolitan area was proposed in relation to northern and southern extension of it. In addition connection with bus and light rail was discussed. Second, multipurpose usage of Shinbundang-line was proposed as express train and conventional passenger train in that line in addition to simple metropolitan railway. Finally, an effective operation method which Shinbundang-line must have was proposed from unmanned driving and fare system side. These methods can improve Shinbundang-line and then it will solve traffic congestion of southern metropolitan area effectively.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.