1 |
M.S. Kim, J.T. Kim, T.S. Kim, S.S. Park, J.S. Hong, Y.H. Cho, J.H. Min (2013) Study of the Metropolitan Rapid Transport System to Minimize Sidetrack Construction, Journal of the Korean Society for Railway, 16(5), pp.1-8.
DOI
|
2 |
J.M. Won, J.H. Hwang (1997) An analysis on time saving effects of urban express rail systems, Journal of Korea Planners Association, 32(6), pp.121-130.
|
3 |
G.C. Kim, W.H. Kim (1998) A effects of passenger's time saving on express subway systems, Proceedings of the Conference of the Korean Society for Railway, Seoul, pp.160-171.
|
4 |
T. Fujita, H.J. Roh, G.C. Kim (2004) A study on implementation of rapid service in urban railway (In Seoul metropolitan area), Proceedings of the Conference of the Korean Society for Railway, Gyeongju, 6, pp.144-149.
|
5 |
T. Fujita, H.J. Roh, G.C. Kim (2004) A study on development of operation planning for rapid service in urban railway (An introduction), Proceedings of the Conference of the Korean Society for Railway, Gyeongju, 6, pp.165-170.
|
6 |
S.Y. Chung, J.B. Lee, J.S. Lee, B.G. Lim (2010) A review on the operation of high speed train on urban regions, Proceedings of the Conference of the Korean Society for Railway , Changwon, 7, pp.98-103.
|
7 |
C.M. Kim (2010) A study on functional positioning and effective analysis of great train express, Report of Gyeonggi Research Institute, 39, pp.3-98.
|
8 |
G.C. Kim, Y.J. Kim (2002) The analysis of effects on express subway service in the Seoul metropolitan area, Seoul Studies, 3(1), pp.69-80.
|
9 |
Y.E. Shin (2003) Effects of accelerated transit operation, Journal of the Korean Society of Civil Engineers, 23(6D), pp.745-751.
|
10 |
J.T. Kim, M.S. Kim, J.S. Hong,Y.H. Cho, T.S. Kim (2014) An Analysis of Boarding and Alighting Times for Urban Railway Vehicles, Journal of the Korean Society for Railway, 17(3), pp.210-215.
DOI
|
11 |
O.H. Kwon, M.H. Kim, S.M. Rhee, K.S. Chon (2011) A method for optimal express train stop scheduling using station OD data, Proceedings of the Conference of the Korean Society for Railway, Jeju, pp.1810-1815.
|
12 |
A. D'Ariano, F. Corman, D. Pacciarelli, M. Pranzo (2008) Reordering and local rerouting strategies to manage train traffic in real time. Transportation Science, 42(4), pp.405-419.
DOI
|
13 |
N. Tomii, Y. Tashiro, N. Tanabe, C. Hirai, K. Muraki (2005) Train rescheduling algorithm which minimizes passengers' dissatisfaction. Innovations in Applied Artificial Intelligence, Lecture Notes in Computer Science, 3533. Springer, Berlin, pp. 829-838.
|
14 |
C.G. Walker, J.N. Snowdon, D.M. Ryan (2005) Simultaneous disruption recovery of a train timetable and crew roster in real time. Computers & Operations Research, 32(8), pp. 2077-2094.
DOI
|
15 |
J. Rodriguez (2007) A constraint programming model for real-time train scheduling at junctions. Transportation Research Part B: Methodological, 41(2), pp. 231-245.
DOI
|
16 |
A. Ginkel, A. Schobel (2007) To wait or not to wait? The bicriteria delay management problem in public transportation. Transportation Science, 41(4), pp. 527-538.
DOI
|
17 |
K. Sato, K. Tamura, N. Tomii (2013) A MIP-based timetable rescheduling formulation and algorithm minimizing further inconvenience to passengers, Journal of Rail Transportation Planning & Management, 3(3), pp. 38-53.
DOI
|