• Title/Summary/Keyword: Train Maintenance Facility

Search Result 19, Processing Time 0.022 seconds

A Study of Light Train AFC System Planing (경전철에서 역무자동설비 설계 방안)

  • Lee, Jung-Ju;Lee, Soo-Young
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1574-1585
    • /
    • 2007
  • In the more and more continues traffic difficulty which comes to be serious it is for solve, in order to like this used plan for new town light train automatic fare collection system, the city development which is balance and the passenger whom it uses, in consequence of the fact that recently believer instruction, the automatic fare collection system the reverse which is convenient is used in the scripture season which is embossed with means it introduces it operates and a manpower with the scientific service control which leads the electric computer anger of passenger service improvement and accounting and statistical business it reduces, the use is convenient and the possibility facility of operating efficiently in rational plan in order to be, description below for the service automation equipment where the efficiency improves it is. Service automation equipment uses a scripture season to be the first boundary gate of the passenger, there must be a place where it uses a service automation facility and in order to be convenient, it considers the moving area and a wait of the reverse station passenger moving area and the space where, must secure the automatic fare collection system which it follows in automation of facility and the service operation of the reverse station which is ticket sale, the collection of tickets back the passenger is convenient and in order it will be able to use, must do and must consider, must arrange the efficient characteristic of the maintenance civil official services.

  • PDF

Implementation of the Measurement Equipment to Measure Return Current and Axle Temperature of High Speed Railway (고속철도 귀선전류 및 차축 온도 검측을 위한 검측장치 구현)

  • Lee, Young-Soo;Lee, Byeong-Gon;Hwang, In-Kwang;Han, Seung-Hun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.4
    • /
    • pp.695-703
    • /
    • 2016
  • The maintenance method for the electrical facility of high speed railway has been evolved from inspection by personnel to the automated way by the detection devices. In particular, the signalling equipment in order to increase the safe and efficient operation of the trains is required to maintain normal operation by periodic maintenance. Because the return current gives the most important effects to the wayside equipment in case of the failures, a method is needed to measure the unbalanced rate of return current on the train at high speed driving. The Hot Box Detector(HBD) device that is installed at track-side has a function to recognize the abnormal axle box by detecting the temperature that occurs in the axle of train passing over its device. In order to implement the measurement equipment for unbalanced rate of return current and axle temperature, the design method is proposed and the experimental test results by test bed are included in the paper.

The Manpower Assignment Design of the Train Paint Process with the Simulation and DEA Methods (시뮬레이션과 DEA를 이용한 열차도장시설의 인력배치방안 연구)

  • Jo, Hyun-Sub;Kim, Youn-Jin;Lee, Hong-Chul
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.6
    • /
    • pp.1389-1398
    • /
    • 2009
  • This research suggests the calculation and analytic method of determining the proper numbers of manual workers with simulation and DEA methods. For this, first of all we designed and analysed the simulation model of real facility being built in Dea-Jun. Secondly, we find the solution with DEA among various alternatives built based on the results of the simulation analysis. In the simulation process, the waiting time, the number of painted trains, and utilization of main equipment are considered as main response variables. After simulation, we built DMUs(Decision Making Unit) consisting of combined results with the manpower assignment policies, the numbers of workers, and the rate of skilled operators, and calculated the efficiency of DMUs with the DEA method. Among 27 DMUs, 4 DMUs turned out efficient technically and on scale. In conclusion, through the suggested procedure, this research shows the way that decision makers can solve the problems with various factors they should concern, along the scientific process, when building a new facility.

Achievements and Tasks of the SMRT Tunnel Monitoring System(TMS) (서울도시철도공사 터널모니터링 시스템의 운영성과와 과제)

  • Park, Jong-Hun;Kim, Man-Hwa;Park, Ki-Hwan
    • Journal of the Korean Society for Railway
    • /
    • v.15 no.4
    • /
    • pp.381-387
    • /
    • 2012
  • This paper is aimed to analyze the achievements of the Tunnel Monitoring System(TMS), implemented in Seoul subway L5~L8, and to find out improved methods. By introducing the TMS, it is possible to inspect tunnel facilities for 24 hours a day while trains are operated. The inspection capability could be expanded, the accuracy was improved, and the cycle was shortened. The efficiency of manpower was improved and the surplus manpower could be used for other tasks of facilities maintenance. As a result, by introduction of the TMS, the amount of tunnel maintenance was increased by 225% and the train service troubles caused by facility problems were decreased by 53%.

A Study on the Trolley Sliding Condition Inspection System

  • Chang, ChinYoung;Kim, ChanSam;Jung, NoGeon;Na, YeonIl;Kim, YangSu
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.7 no.2
    • /
    • pp.109-112
    • /
    • 2015
  • The Korean electric railway is growing rapidly such as speed of 300km/h in high speed section and 230km/h in the conventional railway section. But, power supply failure occurs because of loss of contact, defective catenary system and high speed vehicle. Therefore preventive maintenance way based reliability has been applied. Typical example is the facility inspection method using trolley inspection system. But it is required differentiated inspection method to prevent problem such as inspection errors. In this paper, a study on the trolley sliding condition inspection system using monitoring techniques is performed for performance enhancement of inspection system. It proposed the efficient maintenance method through monitoring the deviation and height of contact wire after installing inspection system on the top of train which operates in the metropolitan area. Inspection errors were decreased by virtually monitoring the video of faulty facilities. Also those facilities were identified through the impact sound analysis and tests at the main catenary section.

A Study on Ensuring Safety in Electric Railway Based on the Risk Assessment (위험도 평가 기반의 전철/전력분야 안전확보 방안에 관한 연구)

  • Chang, Yun-Suk;Choi, Kyu-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.275-280
    • /
    • 2008
  • Recently the railway safety is very important issue in Korea because there are lots of changes like the separation of operation and facility of national rail network, the inauguration of high speed train and Daegu subway fire accident. Railway safety management system is based on risk assessment of rolling stocks, electrical system, signaling, operation & maintenance and human element. With this process, railway risk will be reduced as low as reasonably acceptable level. Through risk assessment on accident data, this study predicted the current risk level of railway electrical system and presented the proper safety ensuring measures.

  • PDF

Study on Implementation Scheme for Integrated PSD Control System of Seoul Metro (서울메트로 PSD 통합관제시스템 구축방안에 대한 연구)

  • Kim, Yong-Hyeop;Hyun, Yong-Sub;Ryoo, Ho-Joong;Kim, Jin-Su
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1551-1559
    • /
    • 2007
  • Seoul Metro has been constructing the screen doors on the platforms to provide safe and comfort environments. The screen doors of each station are configured so that they can be operated in automatic mode in connection with ATC/ATO through the integrated control panel in the station control room and in manual mode through the control panel of the station control room and crew control panel. These systems have been implemented with different data communication protocols between systems, HMI configuration, and so on due to ordering processes, implementation time and diverse suppliers, and manufactured to be operated within single station. Seoul Metro has been planning to implement the integrated control system to secure seamless train operation and safety and to have a fast response system against emergency situations such as PSD failure and fire, by implementing the system that is able to collectively manage, monitor and control the operation status and equipment conditions of PSD on to the integrated control center. This paper has studied a scheme to reduce the budget for the future facility constructions by standardizing the data format for data communication with the integrated station control panel and using the open standard protocols, in order to secure consistency of operation, system expansion and maintenance with unified and standardized control items.

  • PDF

Analysis of the Finishing Failure in the Railway Station Platform and Deduction of Improvement Plans (철도역사 승강장 연단부 마감 탈락에 대한 원인 분석 및 개선 방안)

  • Ko, Sewon;Yu, Youngsu;Koo, Bonsang;Kim, Jihwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.1
    • /
    • pp.46-53
    • /
    • 2022
  • The railway platform is an important facility closely related to the safety of passengers, trains, and images of railway facilities, and requires thorough facility management. However, the problem that the finishing material (plastering mortar) for the joint finishing of dissimilar materials (concrete+granite) falls off in the direction of the track at the platform podium is occurring multiple times across the country. Since these problems threaten the safety of train operation and the safety of passengers, immediate and continuous management is required. This study tried to derive improvement plans through the analysis of the drop-off problem of finishing materials occurring at the platform podium. The status of missing finishing materials for the platform podiums of about 200 railway stations and the related design and construction standards of the Korea National Railway were investigated. After that, the cause of the drop-off of the finishing material was analyzed, and as a result, it was found that the main cause was the boundary between the roadbed and the architectural process that occurred during construction. Subsequently, in connection with the derived causes and design, construction standards, (1) improvement of finishing materials or construction methods, (2) design of finishing materials that are easy to adjust height, (3) design of separate finishing methods, (4) improvement methods and durability were suggested.

A study on design and performance test of fire door with high endurance performance in submarine tunnel (고내구성능을 갖는 해저터널 방화문 설계방안 및 성능시험 연구)

  • Park, Sang-Heon;Hwang, Ju-Hwan;Choi, Young-Hwan;An, Sung-Joo;Yoo, Yong-Ho
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.2
    • /
    • pp.331-346
    • /
    • 2018
  • In the tunnel of domestic high - speed railway, the main fire - fighting facility, fire - extinguishing passageway, is installed. However, due to the high pressure of the high - speed train, frequent breakage and maintenance are caused by strong shock and long - term vibration. In order to solve these problems, it is necessary to improve the fire door, but in Korea, it is installed by submitting a certificate by simple KS F 2296 performance test. At present, it is developed as a simple test certification by producing a real scale fireproof door without the theoretical examination in advance, so that a high cost for improvement is occurring in Korea. Therefore, through this study, structural analysis study which can preliminary structure review was carried out in order to design the refuge connection passage fire door and to improve the performance improvement. In order to secure the reliability of the result value, the official authentication test (KS F 2296) were compared.