A study on design and performance test of fire door with high endurance performance in submarine tunnel |
Park, Sang-Heon
(Dong Il Engineering Consultants)
Hwang, Ju-Hwan (Dong Il Engineering Consultants) Choi, Young-Hwan (Dong Il Engineering Consultants) An, Sung-Joo (Dong Il Engineering Consultants) Yoo, Yong-Ho (Korea Institute of Civil Engineering and Building Technology) |
1 | Booth Industries Limited (2010), "Infrastructure Applications", England, pp. 10. |
2 | Hwang, J.Y. (2009), "Status and Technical Review of the Underwater Tunnel", Korea, pp. 122. |
3 | Kim, H.G., Cho, P.G., Yoo, J.O. (2017), "A study on the characteristics for aerodynamics at high speed in railway tunnels - focused on the micro pressure wave", Korea, pp. 23. |
4 | Korea Institute of Construction Technology (2012), "The underwater tunnel technology project reporting", Korea, pp. 9. |
5 | Korea University (2017) "Development of key subsea tunnelling technology (Appendix: Development of air pressure analysis program)", Korea, pp. 23. |
6 | Ministry of Land Transportation (2015), "Technical standards of railway facilities", Korea, pp. 9-10. |
7 | Proceeding of the Institution of Civil Engineering (1995), "The channel tunnel", pp. 37. |
8 | Yoo, Y.H., Park, S.H. (2015), "Simulation study of smoke spread prevention using air curtain system in rescue station platform of undersea tunnel", Korea, pp. 2. |
9 | Yooshin Engineering Corporation (2017), "The first design case of the mined subsea road tunnel (Boryung) in Korea", Korea, pp. 279-282. |