• Title/Summary/Keyword: Track maintenance

Search Result 439, Processing Time 0.043 seconds

The Effect of the Tied Sleeper on the Maintenance Work in the Rail Expansion Joint Zone (레일신축 이음부 유지보수 작업에 대한 침목결속의 영향)

  • Bae, Hyun-Ung;Kang, Tae-Ku;Choi, Jin-Yu;Jeong, Won-Ik;Lim, Nam-Hyoung
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2125-2128
    • /
    • 2011
  • The continuous welded rail(CWR) track without the rail expansion joint has many advantages over the conventional track in a variety of fields including the speed-up and the ride comport. However, due to the excessive axial force in the CWR and the track-bridge interactive behavior, inevitably, the rail expansion joint must be installed at the vulnerable zone such as the bridge end zone, etc. In this rail expansion joint zone, the frequency of the maintenance work to repair the track irregularity is on the rise. This is because that the creep of the sleeper is occurred in the moveable zone of the rail expansion joint. In this study, among the several options for reducing the track irregularity on the rail expansion joint zone, the application and efficiency of the tied sleeper is investigated. Field test construction has been conducted, then the progress of the track irregularity and the frequency of the maintenance work are analyzed before and after the filed test construction.

  • PDF

COBie Based Maintenance Document Generation of Railway Track (COBie 기반 철도 선로유지관리 문서 생성)

  • Seo, Kyung-Wan;Kwon, Tae-Ho;Lee, Sang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.4
    • /
    • pp.307-312
    • /
    • 2017
  • In this study, we proposed a method to generate a maintenance documents for railway track through Construction Operations Building information exchange(COBie) which is a subset of Industry Foundation Classes(IFC), a data model for Building Information Modeling(BIM). In order to define the items necessary for railway track maintenance document generation, we analyzed the guideline of maintenance and management to track by the Ministry of Land, Infrastructure and Transport(MLTM), and defined the way to refer to the information items in the COBie spreadsheet. The additional properties not supported in IFC, were created for generation of an Information model that reflecting maintenance information items of railway track by applying user-defined property set within the IFC framework. An IFC-based Information model reflecting the user-defined property was implemented through BIM software, and rail track maintenance information items were transferred to COBie spreadsheet according to the defined approach. It is tested that the information can be transferred from the IFC-based as-built model to the COBie spreadsheet, which can be used to generate the necessary documents for railway facility maintenance work.

A Study of Analysis Method for the Track geometry measuring data on High Speed Railway (고속철도 궤도검측자료 분석기법에 관한 연구)

  • Kang, Kee Dong
    • Journal of Korean Society of Steel Construction
    • /
    • v.18 no.1
    • /
    • pp.47-51
    • /
    • 2006
  • Measuring the track geometry of a high-speed railway is the most important task in track construction and track maintenance work. Measuring accuracy is particularly sign the formulation of the maintenance plan and in the assessment of the work quality, and because it can set the train speed limit. To determine the track geometry of a high-speed railway, it is important to use KNR's track recording coach (EM-120). According to the result of the spectrum analysis, noise near the 1-m wave band was found on the track recording data. A new filter was thus applied to remove the noise from the track recording data. A similar result can be acquired when this method is used in real track geometry.

A New Slab Track System (새로운 슬래브궤도 시스템)

  • 강보순
    • Proceedings of the KSR Conference
    • /
    • 2002.05a
    • /
    • pp.213-218
    • /
    • 2002
  • A new German high speed railway slab track was investigated. The construction objective was to provide a durable and maintenance free track system consisting of precast concretepanels of consistently high quality and highest achievable accuracy in track geometry. The System on the basis of precast panels similar to the slab track system constructed on the line Dachau- Karlsfeld in 1997.

  • PDF

Development of turnout on concrete track using Fast clip (Fast clip을 적용한 콘크리트궤도용 분기기 개발)

  • Hwang, Kwang-Ha;Ryou, Ki-Tae;Park, Chun-Bok;Park, Kwang-Ryoun;Yun, Byung-Hyun
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.1002-1008
    • /
    • 2011
  • Turnout is a mechanical installation enabling railway trains to be guided from one track to another at a railway junction. there are classified variously according to rail type, sleeper type, fastening system, track type. Construction of concrete track are on the increase recently to secure the safety of track structure as well as to reduce the maintenance cost. SFC fastening system used the plain track a lot and for those reasons, The fast clip turnout demand growing to improving efficiency of the maintenance cost by unification of fastening clip on whole line. in this study is about development of the fastening system for new turnout using fast clip. this fastening system assembled elasticity pad underneath a base plate. its can change stiffness how to adjust contact surface area of elasticity pad Developed fastening system have passed test according to rule of KRS-TR0014-09R (rail fastening system) and Performance Certification by KR.

  • PDF

Development of Rail Profile Measurement System using High Speed Laser Image Processing (고속영상처리에 의한 레일형상측정시스템 개발)

  • Moon, Chul-Yi;Kim, Man-Chul
    • Proceedings of the KSR Conference
    • /
    • 2006.11b
    • /
    • pp.1320-1325
    • /
    • 2006
  • Railway track supports and guides train and it directly affects ride quality and safety. To maintain track quality, regular maintenance activity is essential but it degrades track usage since maintenance activity occupies the track during the work. To achieve maximum track efficiency, track inspection should be performed at commercial running speed. In this paper, we designed and developed high speed rail profile measurement system using laser light sectioning method with line laser generator, digital camera and DSP based image processing system. The measurement system can supports rail profile measurement at the speed of 300 Km/h that can be applied to KTX.

  • PDF

Dynamic Analysis of Structure's Approaches through Field Tests in the Conventional Railway (현장계측을 통한 기존선 철도 구조물 접속부의 거동분석)

  • Park, Joon-Oh;Lee, Sang-Bae;Hong, Won-Pyo
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1864-1874
    • /
    • 2007
  • Korean trains pass many mountain areas, so the volume of structures like bridge and tunnel has large part of railway lines. Train speed-up naturally needs a straight line in railway, then structures are increasing, and the length of structure has more than 70% in Kyongbu high-speed railway. The stiffness of bridge and tunnel is higher than the soil in the roadbed in spite of dynamic difference in vibration and displacement. Differences in stiffness have more dynamic effects and increase the deformation and destruction in the track and roadbed. This influences passenger's comfort and the safety of operation, and it needs more track maintenance. This study selected tunnel with ballast track, tunnel with concrete track, and structure's approaches with short maintenance cycle in the roadbed and had track acceleration tests and track liner inspections using track master in the field. This study will measure periodically to structure's approaches which have very fast track irregularity and analyze dynamic differences and track irregularity near structure's approaches, so realize the cause of track irregularity of structure's approaches and use basic data for reasonably strengthening method of structure's approaches.

  • PDF

The Parameter Study of Serviceability Review of End Track on Railway Bridge installed Concrete Slab Track (콘크리트궤도 부설 교량의 단부 사용성 검토를 위한 매개변수 연구)

  • Sung, Deok-Yong;Kim, Young-Ha;Park, Yong-Gul;Kim, Sung-Il
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.117-124
    • /
    • 2008
  • Construction of concrete slab track is trending to increase gradually in national and international for reduction in track maintenance cost and secure of ride comfort. However, in case of railway bridge installed concrete slab track, the serviceability review of end deck should be performed for reducing the maintenance cost of track. The serviceability review of track contains that the compression force which is occurred on fastener of end bridge should be smaller than the compression force causing the deformation limit of elastic pad and the uplift force which is occurred on fastener of end abutment should be smaller than initial fastening force. Therefore, this study calculated the deflection and end rotation of the railway bridge according to the span length and stiffness of railway bridge and estimated the compression force and uplift force which are occurred on the track of end bridge using the finite element method. This study indicated the several diagrams that are contained the correlation between the behaviour of the track and the behaviour of the railway bridge. As a result, to reduce the end rotation of the railway bridge is very efficient to increase the height of railway deck.

  • PDF

Experimental Study on Characteristics of Track Settlement Depending on Components of Ballast Track (자갈도상 궤도 구성품에 따른 궤도 침하 특성에 대한 실험적 연구)

  • Kim, Man-Cheol;Bae, Young-Hoon;Lee, Si-Yong;Park, Yong-Gul
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.4
    • /
    • pp.498-505
    • /
    • 2016
  • As a basic study to develop maintenance-effective optimal ballast track in preparation for upgrading a conventional line to a high speed railway, a full-scale test that combined the components of ballast track was conducted and the characteristic of track settlement was analyzed. As a result of the full-scale test, reduction in maintenance via an increase of the elasticity of only the pad was insignificant; however, the effect increased significantly with increasing of the weight of the sleeper or with increasing of the weight of the sleeper and the thickness of the ballast together with use of a pad with high resiliency. An optimal type of ballast track, in line with upgrading the speed of a conventional line, shall be developed through cost efficiency analysis considering the maintenance cost depending on the track settlement as well as the initial construction cost.

An applicable RCM method for Track circuit equipment of AREX's Signalling System (공항철도 궤도회로장치에 대한 RCM 적용 방안)

  • Song, Mi-Ok;Lim, Sung-Soo;Lee, Chang-Hwan;Park, Seung-Keun
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1126-1131
    • /
    • 2008
  • In this paper we introduce an applicable RCM(Reliability centered maintenance) method for Track circuit equipment of AREX's Signalling System. AREX computerize all the process of FRACAS(Failure Reporting, Analysis and Corrective Action System)) by the Facility Management System of Integrated Information System. These datum were analysed and reproduced as the RAMS index value which can be used by maintenance staff for optimizing the maintenance method of the System.

  • PDF