• Title/Summary/Keyword: Tower crane accidents

Search Result 22, Processing Time 0.024 seconds

Measures to Reduce Tower Crane Accidents During Operation by Improving Signal System and Education for Signalmen (신호체계와 신호수 교육 개선을 통한 양중 작업 중 타워 크레인 사고 저감 대책)

  • Yun, Dong Hun;Park, Jong Yil;Kee, Jung Hun
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.4
    • /
    • pp.68-75
    • /
    • 2019
  • As the tower crane accident emerged as a social issue in 2017, various government measures were prepared. Most of the measures are focused on erecting, climbing, and dismantling phases. Analyzes of 84 serious accidents related to tower cranes from 2000 to 2018 and 104 near misses accidents from 2016 to 2018 revealed that 50% of the serious accidents occurred during the operating phase. The main occupation influencing operating phase accidents was signalman(81.6% of serious accidents), whose communication and competency were governing causes. This result was the same in 294 questionnaires to signalmen. Signal systems and education policies for tower crane signalman in Korea and foreign countries were analyzed, and standardization of wireless signal system and improvement of education system were propose.

Importance Ranking of Accident Factors of Remote Control Tower Crane by AHP (AHP 분석에 의한 무인타워크레인 사고 요인의 중요도 순위)

  • Kim, Ju-Yong;Jung, Young-Chul;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.20 no.6
    • /
    • pp.497-504
    • /
    • 2020
  • In Korea construction industry, researches are being conducted to reduce the disasters related tower crane due to the increase of tower crane's usage and accidents continuously. Although the usage amount of remote control tower crane has been increasing recently, the research on remote-control tower crane is insufficient. In this study, the importance ranking of remote control tower crane's accident factors derived by AHP analysis. AHP questionnaire was conducted to engineers (or operators) like construction site engineer, construction manager, safety engineer, and tower crane operator, who have more than 10 years career. The results of AHP analysis reveal that top ranking factor of remote control tower crane's accident is lifting work for materials. Therefore, the high importance factors should be managed, and taken the priority measures for reducing the tower crane accidents by using the results of this research.

A Study on the Safety Risk of Telescoping Work of Tower Cranes (타워크레인 텔레스코핑 작업의 안전리스크 대응방안 연구)

  • Lee, Dong-Hoon;Choi, Jae-Hwi;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.9-13
    • /
    • 2009
  • As recent construction projects are bigger and higher, the importance of lifting is increasing. In construction sites tower cranes are an essential lifting equipment covering were than 50% of all construction activities. But due to neglect of safety supervision, tower crane-related accidents are frequently taking place. Since most of construction activities is done in heights, the accidents are more likely to be catastrophic. According to an analysis of the causes of tower crane-related accidents, 49% of all accidents claimed for certain periods($1999{\sim}2003$) occurred in the process of telescoping work. Therefore, this research is conducted with the object of analyzing telescoping work of tower cranes and presenting solutions against safety risk. It is expected that the results of this study can be used as useful basic data or material when preparing for effective safety management for tower cranes.

  • PDF

Basic Study for Setting Service Life of Tower Crane (타워크레인 사용 연한 설정을 위한 기초 연구)

  • Kim, Ki-Hyuke;Oh, Chae-Won;Lee, Donghoon
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.1
    • /
    • pp.1-8
    • /
    • 2019
  • Recently, as development of building construction technology, height of building continues increase. But, there is no clear ground of service life of tower crane. So, accident in the tower crane continues to occur. In addition to Korea, there is no clear ground for the serive life of tower cranes overseas. For this reason, this study aims to establish the maximum service life of tower crane. Accidents in tower cranes continues to increase, and the cause of the accident is that there are no ground of limitations for service life of tower cranes. Therefore, in this study, the maximum service life of the tower crane was calculated by using the information of the hoisting case of the tower crane to limit the model year of the tower crane. The results of this study are as follows; As the number and time of the hoisting work increases, the maximum service life of the tower crane decreases. In addition, since this study refers to European standards, it is necessary to establish standards for domestic situations. Result of this study, we expect decrease accidents in tower crane. And it is expected that the service life of tower crane will be more clear if this study is developed.

A Study on the Safety Inspection System Model of The Tower Crane a Construction Site in Korea (국내 건설현장 타워크레인 안전진단 관리시스템 모델에 관한 연구)

  • Yoon, In-Soo;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.9 no.1
    • /
    • pp.37-49
    • /
    • 2007
  • The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding and lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower crane using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.

The study on the safety inspection system model of the tower crane a construction site in Korea (국내 건설현장 타워크레인 안전진단 관리시스템 모델에 관한 연구)

  • Yeon, In-Soo;Seo, Jang-Hoon;Kang, Kyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.499-507
    • /
    • 2006
  • The tower cranes are widely used in very useful construction machine the sites of constructing high-structure and have a structural sensitiveness. Therefore, the accidents have often happened due to the deficiency of laborer's understanding md lack of safety of structure. Till now, as we have research and studied above, we can properly protect accidents by construction equipments particularly crane as well as most disasters which occur frequently in construction site. The goal of this study is the safety inspection model of the tower crane a construction site, which preventible the collapse accident of tower crane which is constructed by using the correcting frame. In order to accomplish the goal of this study, the field survey, the reference investigation and the structure analysis were performed for the collapse accident of tower nine using the correcting data. This study will be proposed a build-up solutions about operating and release of safety constructions and researched about software safety estimation. Also, preventing safety problems of Tower Crane Construction site as applying safety estimation program and laws and regulations. As a result, The real time control of tower crane inspection system is implemented by to illustrate the application of the adopted optimal design model.

  • PDF

TRACKING LIFT-PATHS OF A ROBOTIC TOWERCRANE WITH ENCODER SENSORS

  • Suyeul Park;Ghang, Lee;Joonbeom cho;Sungil Hham;Ahram Han;Taekwan Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.250-256
    • /
    • 2009
  • This paper presents a robotic tower-crane system using encoder and gyroscope sensors as path tracking devices. Tower crane work is often associated with falling accidents and industrial disasters. Such problems often incur a loss of time and money for the contractor. For this reason, many studies have been done on an automatic tower crane. As a part of 5-year 23-million-dollar research project in Korea, we are developing a robotic tower crane which aims to improve the safety level and productivity. We selected a luffing tower crane, which is commonly used in urban construction projects today, as a platform for the robotic tower crane system. This system comprises two modules: the automated path planning module and the path tracking module. The automated path planning system uses the 3D Cartesian coordinates. When the robotic tower crane lifts construction material, the algorithm creates a line, which represents a lifting path, in virtual space. This algorithm seeks and generates the best route to lift construction material while avoiding known obstacles from real construction site. The path tracking system detects the location of a lifted material in terms of the 3D coordinate values using various types of sensors including adopts encoder and gyroscope sensors. We are testing various sensors as a candidate for the path tracking device. This specific study focuses on how to employ encoder and gyroscope sensors in the robotic crane These sensors measure a movement and rotary motion of the robotic tower crane. Finally, the movement of the robotic tower crane is displayed in a virtual space that synthesizes the data from two modules: the automatically planned path and the tracked paths. We are currently field-testing the feasibility of the proposed system using an actual tower crane. In the next step, the robotic tower crane will be applied to actual construction sites with a following analysis of the crane's productivity in order to ascertain its economic efficiency.

  • PDF

A Quantitative Analysis of Fatal Accidents Related to Cranes Using the FMEA Method (FMEA 기법을 활용한 크레인 관련 중대 재해의 정량적 분석에 관한 연구)

  • Kim, Hong-Hyun;Lee, Ghang
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.3
    • /
    • pp.115-122
    • /
    • 2007
  • As buildings become higher, larger, and more complex, safety issues for construction workers working at such environments become more important. We analyzed 83 critical accident cases reported to the KOSHA(Korea Occupational Safety & Health Agency) for construction cranes by types of cranes and by patterns of accidents and causes. There are more number of accidents related to mobile cranes than that related to tower cranes, but the numbers of dead were similar in both cases. The most dominant cause of crane accidents was "fall of materials". We also analyzed the cases of crane accidents using the FMEA(Failure Mode and Effect Analysis) in order to set up a priority for safety management and also to prioritize research and development items relating tower cranes. In the process, we tried to eliminate subjective indexes such as an expert group survey and use objective and quantitative indexes. As a result, it was found that critical crane accidents occurs most during the "lifting and translating" activity.

Study to Secure the Safety of Tower Cranes through Disaster Case Analysis at Construction Sites (건설현장의 재해사례 분석을 통한 타워크레인 안전성 확보 방안 연구)

  • Son, Seunghyun;Kim, Ji-Myung;Ahn, Sungjin;Na, Youngju;Kim, Taehui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.1
    • /
    • pp.57-67
    • /
    • 2022
  • Tower cranes have an unstable superstructure, which means that there is a very high risk of accidents. It is necessary to establish preventive measures to ensure the safety of tower cranes at a time when active efforts are being made to reduce safety accidents involving tower cranes. As such, the purpose of this study is to analyze disaster cases to ensure the safety of tower cranes. For this study, 260 cases of tower crane disasters filed with the Korea Occupational Safety and Health Agency from July 2012 to July 2020 were analyzed. Through this analysis, it was found that lifting work was the most common of the work types, at 45.3%; while of the types of disasters, accidents caused by falls were the most common type, at 35.8%. In addition, with regard to the cause of accidents, work method defects was found to be the highest, at 38.8%. In the future, the findings of this study will be used as basic data to guide the establishment of policy to prevent tower crane accidents.

Significance Analysis of Major Accident Factors of Remote Control Tower Crane Using AHP Technique (AHP기법을 이용한 무인타워크레인 주요 사고 요인 중요도 분석)

  • Kim, Jindong;Jung, Jinwoo;Lee, Soobo;Son, Juhwan
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.2
    • /
    • pp.76-81
    • /
    • 2019
  • It becomes easy to acquire operating qualification of remote control tower crane and illegal retrofits is increased, remote control tower crane models are increasingly being used in smaller construction sites. However, as the problems caused by tower crane operators who have shortages of operating experience grow, safety accidents is increasing and worker is exposed to risk of accident. In this study, the cause of the accident was derived by analyzing the cause of the remote control tower crane accident. And then, the significance of accident causes was analyzed by AHP technique. The result of this study is that tower crane operators and construction workers do not comply with work rules.