• 제목/요약/키워드: Total project cost management

Search Result 200, Processing Time 0.032 seconds

An Effect Analysis of Subtracting Rebar Volumes in Reinforced Concrete Members on Quantity Take-off (콘크리트 내 철근 부피 공제가 물량산출에 미치는 영향)

  • Kang, Jong-Min;Kim, Seong-Ah;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.24-32
    • /
    • 2012
  • Reinforced Concrete is the most dominant structure type for buildings in South Korea. Reinforced Concrete is one of materials having the most cost and quantity at construction projects. It is important to manage concrete quantity so that the total project cost is not affected due to underestimate or overestimate of its quantity. Generally the concrete quantity is taken-off based on the volume of the space inside forms without subtracting volumes of rebar embedded, which cannot be considered to make quite accurate results. Resource waste and extra cost due to over or under estimate of quantity occur since they cannot estimate accurate quantity at practices. Therefore, the objective of this paper is to analyze the effect of the volume for rebars embedded in reinforced concrete members. By comparing the quantity based on the existing method with the one from BIM data, it was found that about 1~2% of quantity discrepancy was observed while the typical concrete waste rate is 1 % at the current practice.

Proposes the Total Management Model by using Directory Service and through the development HR Solution (Directory Service와 HR 솔루션 개발을 통한 IT 통합 관리 모델 제안)

  • Lee, Sung-jun;Kim, Min-Soo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.684-689
    • /
    • 2013
  • The reality is that many security and administrative issues with the expansion of the IT assets in accordance with the abrupt change in the business environment, most companies today are struggling. Information within an organization is a party through external hackers and viruses that are increasingly intelligent risk, and the risk of internal data spills occur through an unauthorized party and internal information in accordance with the co-operation of the outsourcing company and the employee wants to see a sense of security and due to the frequent project asset outflows the risk is increasing gradually. In this paper, in preparation for such a growing security risk management and the increasing of problems, proposes the Total Management Model by using Microsoft's Directory Service & HR Solution that is an integrated management model that can take low-cost, high-efficiency.

  • PDF

A component-based construction process control system for increasing modifiability (변경 용이성 증대를 위한 컴포넌트 기반의 건설공정관리시스템)

  • Kim, Eui-Ryong;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.303-309
    • /
    • 2015
  • The construction process and safety management are an important means of the total projects for the decision-making. As an important management tool of cost, resources and risks of the project, the analysis and evaluations are recorded as an important asset of company. Also, it has become a safety device that could reduce risk factors repeatedly by the decision-making methods for the future similar projects. Component-based software, by reusing the useful part, which was prepared without newly developing all that, by building a new software product, the long-term continuous/steady through the provision of a component-based software, by securing a sales base, it should be the development and supply a wide range of applications. In this paper, we propose the construction process control systems for increasing modifiability of process creation and modification for business efficiency in accordance with the diverse trends in the construction process as a low-cost niche through a component-based software supplier to solve these problems.

Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process

  • NGUYEN, Phong Thanh;NGUYEN, Quyen Le Hoang Thuy To
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.7 no.8
    • /
    • pp.197-204
    • /
    • 2020
  • Nowadays, many construction engineering and technology enterprises are evolving to find that prosperity is driven and inspired by an open economy with dynamic markets and fierce multifaceted competition. Besides brand and product uniqueness, the ability to quickly provide customers with quotes are matters of concern. Such a requirement for prompt cost estimation of construction investment projects with the use of a construction price index poses a significant challenge to contractors. This is because the nature of the construction industry is shaped by changes in domestic and foreign economic factors, socio-financial issues, and is under the influence of various micro and macro factors. This paper presents a fuzzy decision-making approach for calculating critical factors that affect the construction price index. A qualitative approach was implemented based on in-depth interviews of experts in the construction industry in Vietnam. A synthetic comparison matrix was calculated using Buckley approach. The CoA approach was applied to defuzzified the fuzzy weights of factors that affect the construction price index. The research results show that the top five critical factors affecting the construction price index in Vietnam are (1) consumer price index, (2) gross domestic product, (3) basic interest rate, (4) foreign exchange rate, and (5) total export and import.

PPI (PRIVATE PARTICIPATION IN INFRASTRUCTURE) STATUS OF SOC (SOCIAL OVERHEAD CAPITALS) AND ITS IMPROVEMENT IN KOREA

  • Sugk-Yong Yoon ;Sung-Won Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.353-359
    • /
    • 2005
  • The infrastructure in korea has been improved drastically since July 7th, 1970 which was the first highway completed date in Korea (Seoul-Pusan). This is one of the major factors for the competitiveness of a country. Now the total length of highway in Korea is more than 2000km. However Korea is 11th in the trade volume in the world, the SOC level of Korea is around 20th at most in the world (IMD 2004). The infrastructure in Korea comparing other developed countries is far below, which gives the impact of cost of goods, even twice expensive in transporting goods through highways, railways and ports etc. Now the government budget is gradually spending more for welfare and health care side. The most of additional expense of welfare is increasing rather than SOC budget is decreasing or staying as it is as 2003. The government may think that the level of SOC is enough in point of view of preference input of budget such as welfare and health care etc. However the SOC level in Korea is far form the competitiveness of the country. The main points of this paper is to show that where Korea is in point of SOC level to go for developed country, and what to do to facilitate BOT, BTO and BTL projects. Korean government has tried to improve the practice of PPI (Private Participation of Infrastructure) with the Act on Private Capital Inducement in 1994 and the Act on Private Investment in 1997.

  • PDF

Technical Proposal based Bidding System Applying the Concept of the Lowest Total Combined Bid Price for Supplying Affordable Housing (최저통합환산가격 개념을 적용한 기술제안 기반 입찰제도)

  • Cho, Gun-Hee;Kang, Seung-Hee;Lee, Jeong-Seok;Sohn, Jeong-Rak;Bang, Jong-Dae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.94-105
    • /
    • 2010
  • Recently, resettlement problems of low income groups in the urban regeneration area have been issued in Korea because they have no capability to purchase (or lease) redeveloped housing (or apartment). There are several approaches for supplying affordable housing and one of these is the bidding system which can reduce construction cost. However, the lowest bidding system has many problems such as dumping and substandard quality. In this context, this study proposed bidding system based on technical proposal applying the concept of the lowest total combined bid price for optimization of bid price, reduction of construction cost and period, and maintenance of suitable quality. This bidding system embraces the best value and cost plus time concept on the basis of an improved lowest price bidding system. It consists of the following components: work unit based, project unit based, and period reducing technical proposals. The proposed bidding system for determining bidders are designed to evaluate the adequacy of each technical proposal in the order of the combined minimum price in an effort to effectively optimize bid prices and reduce the construction periods, as well as to maintain a minimum appropriate quality.

Developing a Safety Scaffold Monitoring System Using Wireless Sensor Network Technology

  • Tserng, H. Ping;Huang, Hung-Jui;Li, Xin-Yan;Huang, Han-Tang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.324-327
    • /
    • 2015
  • Scaffold is the most commonly used equipment in various types of construction works. Since various types of construction works use the same scaffold equipment, it becomes more difficult to be controlled and managed, thus resulting hazard frequently. According to the information announced in July 2012 by Council of Labor Affairs Executive Yan, the site collapse or incomplete anti-falling protection has led the site to accident frequently, and this is the main reason that causes construction industry occupational disasters. The labor death occupational hazard ratio rises up to 13% in scaffold activity, and the Council of Labor Affairs Executive Yan has showed that the death ratio is higher when using the scaffold in construction site, the total number of death has reached to 139 from 2005 to 2010. In order to ensure the safety of scaffold user, this study tends to build a wireless sensor monitoring system to detect the reliability and safety of the scaffold. The wireless sensor technique applies in this study is different with the traditional monitoring technique which is limited with wired monitoring. Wireless sensor technique does not need wire, it just needs to consider the power supply for establishing the network and receiving stable information, and it can become a monitoring system. In addition, this study also integrates strain gauge technique in this scaffold monitoring system, to develop a real-time monitoring data transfer mechanism and replace the traditional wired single project monitoring equipment. This study hopes to build a scaffold collapse monitoring system to effectively monitor the safety of the scaffold as well as provide the timesaving installation, low-cost and portable features.

  • PDF

Differences of Medical Costs by Classifications of Severity in Patients of Liver Diseases (중증도 분류에 따른 진료비 차이: 간질환을 중심으로)

  • Shin, Dong Gyo;Lee, Chun Kyoon;Lee, Sang Gyu;Kang, Jung Gu;Sun, Young Kyu;Park, Eun-Cheol
    • Health Policy and Management
    • /
    • v.23 no.1
    • /
    • pp.35-43
    • /
    • 2013
  • Background: Diagnosis procedure combination (DPC) has recently been introduced in Korea as a demonstration project and it has aimed the improvement of accuracy in bundled payment instead of Diagnosis related group (DRG). The purpose of this study is to investigate that the model of end-stage liver disease (MELD) score as the severity classification of liver diseases is adequate for improving reimbursement of DPC. Methods: The subjects of this study were 329 patients of liver disease (Korean DRG ver. 3.2 H603) who had discharged from National Health Insurance Corporation Ilsan Hospital which is target hospital of DPC demonstration project, between January 1, 2007 and July 31, 2010. We tested the cost differences by severity classifications which were DRG severity classification and clinical severity classification-MELD score. We used a multiple regression model to find the impacts of severity on total medical cost controlling for demographic factor and characteristics of medical services. The within group homogeneity of cost were measured by calculating the coefficient of variation and extremal quotient. Results: This study investigates the relationship between medical costs and other variables especially severity classifications of liver disease. Length of stay has strong effect on medical costs and other characteristics of patients or episode also effect on medical costs. MELD score for severity classification explained the variation of costs more than DRG severity classification. Conclusion: The accuracy of DRG based payment might be improved by using various clinical data collected by clinical situations but it should have objectivity with considering availability. Adequate compensation for severity should be considered mainly in DRG based payment. Disease specific severity classification would be an alternative like MELD score for liver diseases.

Development of A Prototype for Wall Formwork Designs using Open BIM (개방형 BIM을 활용한 벽체 거푸집설계 프로토타입 개발)

  • Jin, Chengquan;Kim, Hyunjoo;Hyun, Chang-Taek;Han, Sang-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.6
    • /
    • pp.3-13
    • /
    • 2018
  • The formwork cost amounts for a significant proportion of project construction costs. It costs 10-15% of the total construction cost and 30-40% of the frame structure construction cost. In addition, the formwork collapse accidents are frequently causing deaths in the construction industry, and thus, is known to be of relatively high degree of risk. As so, the accuracy of structural calculation and quantity take-off when planning the formwork in a construction project are a very important matter. Accordingly, this study develops a BIM based formwork design prototype, that enables the construction manager to optimize the design through applying the proposed new IFC entities associated with the formwork design. The approach proposed in this study is expected to support the construction manager with accurate quantity calculation and rapid planning and construction. Since this study considered specific small-scale buildings using Euro-form and show the possibility of utilizing BIM entities in the formwork design process, further research is recommended towards the limitations in applying the system to other types of formworks.

A Study on the Development plan of Configuration Control for Military Product (군수품 형상통제업무 발전방안에 관한 연구)

  • Jung, Hyun-Woo;Shim, Bo-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.6
    • /
    • pp.70-77
    • /
    • 2020
  • Configuration management is an important project management method. Configuration management is increasing daily and improving defense power as a management tool for technical data of power support systems. Configuration management work must be carried out properly from the beginning of development to acquire an excellent weapon system. In procurement, configuration management is a vital factor that can determine the cost of maintaining operations during the transfer of military supplies and carry out systematic management among operational support. Countries are making changes to policies and systems to manage R&D, standards, and patents in conjunction with each other from the beginning of research and execution, and it is important to establish the concept of managing and controlling the configuration as an efficient means of managing military resources. To identify the activity details during the entire life cycle from the beginning of acquisition to the end of disposal by linking munitions configuration control with the total life cycle, and redefine the appropriate work system, this study investigated and analyzed the U.S. configuration control procedures to identify the activity details and present areas to develop.